Pinned | e748 |
Thu Mar 23 11:19:13 2017 |
Adrien Matta | | | | Schedule | This message will contain the update schedule
of the preparation of e748.
|
|
Pinned | General |
Fri Mar 24 09:32:11 2017 |
Adrien Matta | MUST2 | Software | | Usefull document for MUST2 operations | DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
|
 |
Fixed | e748 |
Wed May 24 09:07:59 2017 |
Adrien Matta | OTHER | General | | e748 Planning | Feel free to edit this spread sheet.
|
|
Pinned | e748 |
Wed May 24 09:19:57 2017 |
Adrien Matta | OTHER | Social | | e748 Collaborators | List of Collaborators (Please edit if anyone
is missing):
|
|
Fixed | e748 |
Wed May 24 09:32:41 2017 |
Adrien Matta | MUST2 | Hardware | | Mounting of the telescope in G3 | The telescope has been mounted in there stand
in G3.
|
|
Fixed | e748 |
Wed May 24 09:35:00 2017 |
Adrien Matta | CATS | Hardware | | BTD chambers mounting in D6 | Sebastient started mounting the BTD chamber
in D6.
The frame is in place, BTD chambers one and |
|
Fixed | e748 |
Wed May 24 15:48:24 2017 |
Adrien Matta | MUST2 | Hardware | | PCB number for each telescope | [LIST]
[*] T1 PCB 5
[*] T2 PCB 9
|
|
Fixed | e748 |
Thu Jun 1 09:29:50 2017 |
Adrien Matta | MUST2 | Hardware | | Telescope cabling debbug in G3 | Test performed without vaccum, in the dark,
cooling at 20.
|
|
Fixed | e748 |
Thu Jun 1 09:32:38 2017 |
Adrien Matta | MUST2 | Hardware | | MUST2 cabling scheme | The MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
|
|
Fixed | e748 |
Fri Jun 2 12:03:32 2017 |
Adrien, Laurent, Shumpei | MUST2 | Hardware | | M2C vacuum test | We mounted 2 dry pump on the chamber and started
pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
|
|
Fixed | e748 |
Tue Jun 6 09:07:34 2017 |
Adrien Matta | BEAM | General | | Moving to D6 | M2C Chamber now in D6 after a smooth ride,
ready to be aligned. |
|
Ongoing | e748 |
Tue Jun 6 17:57:07 2017 |
Valérian et François | EXL | Hardware | | Hardware coupling of EXL with MUST2 |
EXL seems to fit in Adrien's setup. We still
have to check if it fits in the chamber. |
|
Fixed | e748 |
Tue Jun 6 18:17:03 2017 |
Valérian et François | EXL | Hardware | | Hardware coupling of EXL with MUST2 | EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the
chamber. |
 |
Fixed | e748 |
Wed Jun 7 11:29:55 2017 |
Adrien | MECH | Hardware | N/A | Surveyor mesurement | The surveyor are carrying out the measurement
of the detectors in D6.
The measurement should take the day, starting |
|
Fixed | e748 |
Wed Jun 7 18:03:02 2017 |
Franck | OTHER | Hardware | | LPC electronics | Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
|
|
Fixed | e748 |
Thu Jun 8 18:57:14 2017 |
Valérie Lapoux | MUST2 | Hardware | | Currents and Voltages on MUST2 | Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature
at -5°C.
|
|
Fixed | e748 |
Fri Jun 9 12:30:49 2017 |
Adrien | VACUUM | Hardware | | Vacuum Leaks | We reach a stable 1e-5 mbar. We performed
a leak check and identify that the Ionisation
chamber gate valve is not totally tight, |
|
Fixed | e748 |
Fri Jun 9 12:33:25 2017 |
Adrien | MECH | General | | MUST2 position | After a the surveyor came we figured out the
MUST2 telescope are 1cm too high with respect
to the beam line.
|
|
Fixed | e748 |
Fri Jun 9 12:34:18 2017 |
Adrien | DAQ | Hardware | | Hub | We are currentlky waiting for the hub to be
configured so we can start the MUST2 DAQ.
Should be done in the afternoon. |
|
Fixed | e748 |
Fri Jun 9 12:35:46 2017 |
Adrien | MUST2 | Hardware | | CsI trip on T6 | The detector were left on during the night.
T6 CsI trip and cannot be switch on again.
Once we established that all the MUFFEE works |
|
Fixed | e748 |
Fri Jun 9 14:41:54 2017 |
e748 | CATS | General | | Runs 1 - 4 | Tests alpha source, dummy data |
|
Pinned | e748 |
Fri Jun 9 15:49:46 2017 |
Valérie Lapoux | MUST2 | Hardware | | MUST2 configuration | The MUST2 configurations for telescopes in
the chamber and low/High voltage Caen crate
are given in the attached file. |
 |
Pinned | e748 |
Fri Jun 9 15:51:44 2017 |
Valérie Lapoux | MUST2 | Hardware | | General Trigger GMT for MUST2 electronics | The GMT configuration for the trigger inputs
and the inputs from MUST2 electronics are
given in the file. |
|
Fixed | e748 |
Mon Jun 12 11:34:07 2017 |
e748 | MUST2 | Hardware | | MUVI cars setup | We had problem with MUVI1 (pre serie 1) not
working properly when a telescope was pluggeg
(but fine otherwise).
|
|
Fixed | e748 |
Mon Jun 12 11:36:34 2017 |
e748 | MUST2 | Hardware | | I2C error on Telescope | At the Moment we got I2C error on the following
detectors:
|
|
Fixed | e748 |
Mon Jun 12 11:50:34 2017 |
e748 | CATS | Software | | Settings QDC | Gates QDC CATS1X, CATS1Y, CATS2X, CATS2Y:
0.996
Pedestal QDC CATS1X, CATS1Y, CATS2X: 0.5
|
|
Fixed | e748 |
Mon Jun 12 11:52:16 2017 |
e748 | CATS | General | | Run 6 and 7: Calibration Runs CATS | Run 6: Calib CATS1 X&Y
--> Full, x2, x5, pedestal
|
|
Fixed | e748 |
Mon Jun 12 11:55:27 2017 |
e748 | CATS | General | | Run 5 - JUNK pulser run on CATS1 | Dummy run with pulser.
JUNK |
|
Fixed | e748 |
Mon Jun 12 14:09:24 2017 |
e748 | CATS | Software | | calibration coefficients Runs 6-7 | columns are for 1st order calib (y= ax + b):
pedestal - b - a |
    |
Fixed | e748 |
Mon Jun 12 16:56:36 2017 |
e748 | OTHER | General | | e748 Proposal | Experiment proposal |
|
Fixed | e748 |
Mon Jun 12 22:48:45 2017 |
Valérie Lapoux | MUST2 | General | | Tests of the DAQ with the Alpha Source | 12Th June. 3-peak Alpha source rotated towards
the telescopes MM1 to MM4 (square wall of
4 telescopes).
|
8x |
Pinned | e748 |
Tue Jun 13 11:14:23 2017 |
Valérie Lapoux | MUST2 | General | | GMT configuration, FAG | The Gatconf parameter is now defined in the
action file.
The new configuration for GMT (see chronogramme |
  |
Fixed | e748 |
Wed Jun 14 12:13:00 2017 |
e748 | MUST2 | Hardware | | MUST2 I2C Err debugging | It appears several SL cables are faulty.
To avoid manipulation of all the cable we
now have T1-4 working. These required to |
|
Pinned | e748 |
Thu Jun 15 10:16:03 2017 |
Valérie Lapoux | MUST2 | Hardware | | Electronics for GMT trigger and FAG | The GMT is used in a mode where we do not
make coincidence and decision, GMT entries
are single and all accepted as triggers of |
|
Fixed | e748 |
Thu Jun 15 17:51:15 2017 |
e748 | RUN | General | 3-alpha | Run 5-7 | [SIZE=3]run5[/SIZE]
alpha source
|
|
Fixed | e748 |
Fri Jun 16 09:57:54 2017 |
e748 | RUN | General | 3-alpha | Run 11 | RUN 11 : alpha calibration with suppression
of zeros ( & alignment of pedestals) for
all night |
|
Fixed | e748 |
Fri Jun 16 09:59:00 2017 |
e748 | RUN | General | 60Co | Run 12 | RUN 12 : EXL trigger in GMT
+ gamma source 60Co
|
 |
Fixed | e748 |
Sat Jun 17 10:22:43 2017 |
Adrien Matta | EXL | Hardware | | EXL ADC gate | EXL ADC is now setup with individual gate
on the ADC.
|
|
Fixed | e748 |
Sat Jun 17 10:27:26 2017 |
Adrien Matta | ONLINE | Software | | Starting the GRU online analysis | We setup a script to start the right environment
to run GRU, ganil2root and nptool.
|
|
Fixed | e748 |
Sat Jun 17 10:32:25 2017 |
Adrien Matta | ONLINE | Software | | Online/Offline list of task | We need to do the following improvement to
the online / offline environment:
|
|
Fixed | e748 |
Sat Jun 17 10:56:09 2017 |
Adrien Matta | BEAM | General | | JC Thomas plans for the beam production | Here are a few notes by Jean Charles about
the expected LISE setting based on 2013 and
2014 16C tuning. |
|
Fixed | e748 |
Mon Jun 19 16:03:18 2017 |
e748 | EXL | General | | Progress On EXL | We fiddled around with EXL trying to get a
reasonnable 60Co spectrum.
|
|
Fixed | e748 |
Mon Jun 19 16:04:51 2017 |
e748 | RUN | General | 3-alpha | Run 15 | Run 15 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
|
|
Fixed | e748 |
Mon Jun 19 16:36:07 2017 |
e748 | EXL | Hardware | | Gain changed on EXL | Run 15 online analysis showed waht we believe
was 4 MeV range.
|
|
Fixed | e748 |
Mon Jun 19 16:36:31 2017 |
e748 | RUN | General | 60Co | Run 16 | Run 16 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
|
|
Fixed | e748 |
Mon Jun 19 18:02:16 2017 |
e748 | RUN | General | 60Co | Run 17 | Run 15 is started.
We have a 3 alpha source in target position
and a 60Co on the window flange.
|
|
Fixed | e748 |
Mon Jun 19 18:07:55 2017 |
e748 | EXL | Hardware | | Threshold changed on EXL | Run 15 online analysis showed what we believe
was 4 MeV range.
|
|
Fixed | e748 |
Tue Jun 20 09:08:46 2017 |
e748 | EXL | General | | EXL Spectrum with 60Co source | Here is a spectrum of EXL after one night
of accumulating stat on 60Co. |
|
Fixed | e748 |
Wed Jun 21 09:05:26 2017 |
Adrien Matta, Phil Adsley | MUST2 | General | | MUST2 Dead Time | We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in
coincidence with the DT output of the GMT |
|
Fixed | e748 |
Wed Jun 21 09:39:38 2017 |
e748 | DAQ | General | | Backup of config file | ganacq manip back up. |
|
Fixed | e748 |
Thu Jun 22 10:24:12 2017 |
e748 | CATS | Software | | Manip config file backup before merge | Manip config file backup before merge |
|
Fixed | e748 |
Thu Jun 22 11:10:35 2017 |
Valérian | EXL | Software | | EXL Mapping | Mapping of the EXL detector in the analysis
program versus how it is written on the cables. |
|
Fixed | e748 |
Thu Jun 22 17:46:45 2017 |
e748 | MUST2 | Hardware | | MUST2 SL cable repair | Three cables came back from ASCO, two of them
were the original spare cables.
|
|
Fixed | e748 |
Thu Jun 22 17:49:20 2017 |
Adrien and Phil | MUST2 | General | | MUST2 telescope test with alpha source | All Telescope now pass the I2C test.
We ran with an alpha source (attached pictures |
   |
Fixed | e748 |
Thu Jun 22 17:55:52 2017 |
e748 | MUST2 | Hardware | | Surveyor mesurement | The surveyor are missing some point for the
telescope measurement.
|
|
Fixed | e748 |
Fri Jun 23 09:18:14 2017 |
e748 | OTHER | General | | Plan for 23rd of June | We have to open today, I started warming up
of the telescope at 9h18 today.
|
|
Fixed | e748 |
Fri Jun 23 09:20:33 2017 |
e748 | OTHER | General | | Plan for coming days | 23rd of June:
Fix T5
Surveyor measurement
|
|
Fixed | e748 |
Fri Jun 23 16:37:54 2017 |
Adrien, Laurent, Vincent | OTHER | Hardware | | MUST2 chamber opening | We opened the chamber and the surveyor took
there measurement.
|
|
Fixed | e748 |
Fri Jun 23 20:49:49 2017 |
Adrien | MUST2 | General | | Restart | Chamber at 2e-5, cooling -9deg outside; -5
on copper LV off.
|
|
Fixed | e748 |
Sat Jun 24 21:41:30 2017 |
e748 | MUST2 | General | | Pedestal alignement and calibration | MUSt2 pedestal aligned for all telescope.
Started alpha run with all telescope in trigger |
|
Fixed | e748 |
Sun Jun 25 09:53:44 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 18 | Junk |
|
Fixed | e748 |
Sun Jun 25 09:54:08 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 19 | Source: 3-alpha + 60Co
Trigger: T1-8 or EXL |
|
Fixed | e748 |
Mon Jun 26 09:15:31 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 19 : disk quota exceeded | Run 19 was still running this morning, but
file stop writting at 6 O'Clock, when the
disk quota exceeded (we wrtoe about 14Go |
|
Fixed | e748 |
Mon Jun 26 10:26:16 2017 |
Valérian | EXL | Software | 60Co | Add-back | We implemented the add-back correction with
cross-talk subtraction.
|
|
Fixed | e748 |
Mon Jun 26 17:38:32 2017 |
e748 | MUST2 | General | N/A | CALIMERO | Luc and Greg fixed Calimero, We have to perform
the calibration but there is some work going
on with CATS. |
|
Fixed | e748 |
Tue Jun 27 10:15:38 2017 |
e748 | DAQ | General | | Scalers | CATS were added to the scalers:
T CATS1 : 3rd scaler channel
T CATS2 : 4th scaler channel |
|
Fixed | e748 |
Tue Jun 27 13:47:15 2017 |
e748 | RUN | General | N/A | Run 21 | Calib CATS1:
pedestal - x5 - x2 - full
|
|
Fixed | e748 |
Tue Jun 27 13:47:57 2017 |
e748 | RUN | General | N/A | Run 22, 23 | JUNK |
|
Fixed | e748 |
Tue Jun 27 13:48:22 2017 |
e748 | RUN | General | N/A | Run 24 | CALIB CATS2:
x5 - x2 - full - pedestal
|
|
Fixed | e748 |
Tue Jun 27 15:39:04 2017 |
e748 | RUN | General | N/A | Run 26 | Calib Cats 2
pedestal, x5, x2, full
|
|
Fixed | e748 |
Tue Jun 27 15:41:53 2017 |
e748 | RUN | General | N/A | Run 27 | Calib CATS 1
pedestal, x5, x2, full
|
|
Fixed | e748 |
Tue Jun 27 17:41:17 2017 |
e748 | RUN | General | 3-alpha | run 28 | Started run #28
3-alpha
|
|
Fixed | e748 |
Tue Jun 27 17:51:24 2017 |
e748 | RUN | General | 3-alpha | Run 29 | Started run #29 at 17h45
3-alpha around 90deg |
|
Fixed | e748 |
Wed Jun 28 10:52:15 2017 |
Valérie Lapoux | MUST2 | General | | Memo for CALIMERO MUST2 Time Calibration | Temporary file indicating the main steps for
the time calibration of MUST2 using the Calimero
DAQ package program. |
|
Fixed | e748 |
Wed Jun 28 10:54:34 2017 |
Valérie Lapoux | RUN | Software | | DAQ problems due to TCP/IP errors | Problems occurred during the run #29 at 2h38
Wed. 28th June, with the following error
messages written in the Run Control GUI window:
|
|
Fixed | e748 |
Wed Jun 28 11:02:38 2017 |
Valérie Lapoux | RUN | General | 3-alpha | Calibration run #31 with Alpha source - MM5 and MM8 | Run #31 started at 11:01, Wednesday 28th June.
The alpha source is rotated towards the telescopes
5, 8. |
|
Fixed | e748 |
Wed Jun 28 11:42:06 2017 |
e748 | CATS | General | N/A | Surveyor's positions CATS | |
|
Fixed | e748 |
Wed Jun 28 15:07:43 2017 |
Thomas | CHIO | Software | N/A | Trapezoidal filter for CHIO | const int nCHIO=200; // nb samples. sera ajuste
en manip
|
|
Fixed | e748 |
Wed Jun 28 15:17:24 2017 |
Valérie Lapoux | RUN | General | | End of run 31-status | Run #31 started at 11h01; stopped at 15h13
Problem on ganlx9 VME Chio
TIMEOUT on the stop process. |
|
Fixed | e748 |
Thu Jun 29 10:44:45 2017 |
e748 | TARGET | Hardware | CD2 | Target and Mask are Mounted | We mounted the target and mask in the chamber
before closing:
|
   |
Fixed | e748 |
Thu Jun 29 23:26:10 2017 |
Valérie Lapoux | RUN | General | Empty | ALL CALIMERO Time Calibration MUVI1 | 29 JUNE 2017
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
|
    |
Fixed | e748 |
Fri Jun 30 00:33:36 2017 |
Valérie Lapoux | RUN | General | Empty | ALL CALIMERO Time Calibration MUVI2 | 30 JUNE 2017
CONDITIONS FOR CALIMERO CALIBRATIONS
Time calibrator Period 20ns ; range 512 ns
|
 |
Fixed | e748 |
Fri Jun 30 01:01:08 2017 |
Valérie Lapoux | RUN | General | Empty | ALL CALIMERO Time Calibration MUVI2 GOOD RUNS 600ns | [B]RANGE TAC MUST2 600ns
CALIMERO TIME CALIBRATOR PERIOD 20ns; Range
512ns[/B]
|
 |
Fixed | e748 |
Fri Jun 30 02:00:44 2017 |
e748 | MUST2 | Hardware | N/A | Warming up of detector started | All LV and HT off, vaccumm at 1.3e-5 mbar,
starting warm up sequence. |
|
Fixed | e748 |
Fri Jun 30 11:09:59 2017 |
Freddy | OFFLINE | General | | Analysis of DSSD Energy Calibration - alpha source | We made a calibration with the last alpha
source runs:
-run 19 for T1-2-3-4
|
 |
Fixed | e748 |
Fri Jun 30 12:24:17 2017 |
Valérie Lapoux | DAQ | General | | DAQ Parameters: TAC, Caviar, LISE D4, D6, Caviar | |
  |
Fixed | e748 |
Fri Jun 30 16:49:49 2017 |
Valérie Lapoux | DAQ | General | | GMT triggers and chronograph | Configurations for the GMT inputs.
30 June 2017 pm
all Must2 telescopes,
|
 |
Fixed | e748 |
Fri Jun 30 16:55:04 2017 |
Valérie Lapoux | DAQ | General | | Run control for global DAQ with NUMEXO | The run start/stop sequence for the global
DAQ including the NUMEXO:
|
 |
Fixed | e748 |
Fri Jun 30 17:53:35 2017 |
Valérie Lapoux | DAQ | General | | Scalers parameters U2M | |
 |
Fixed | e748 |
Fri Jun 30 20:46:16 2017 |
Valérie Lapoux | TARGET | General | | TARGET configuration | List of the reaction target in the chamber
from bottom to up:
|
|
Fixed | e748 |
Sat Jul 1 09:27:46 2017 |
Adrien Matta | OTHER | General | N/A | SHIFT TABLE | |
|
Fixed | e748 |
Sat Jul 1 10:47:18 2017 |
Adrien Matta | BEAM | General | N/A | Primary beam energy measurement | PCP delivered the primary beam energy measurement |
|
Fixed | |
Sat Jul 1 12:45:25 2017 |
Anastasia | CATS | General | | CATS Calibrated | run_0026 CATS 1 X Y
run_0027 CATS 2 X Y |
|
Fixed | e748 |
Sat Jul 1 14:32:02 2017 |
Valérie Lapoux | DAQ | General | | Scalers U2M, parameters | U2M configuration +Actions ganlx11
The signals for the scalers are converted |
 |
Fixed | e748 |
Sat Jul 1 14:45:17 2017 |
Valérie Lapoux | DAQ | General | | Parameters for correlation checkings | The [B]parameters[/B] to be used for the checking
of the correlations between crates/VME/VXI
and good running of the merging
|
|
Fixed | e748 |
Sat Jul 1 15:12:01 2017 |
Valérie Lapoux | ONLINE | Hardware | | Conditions for Bidiv and TAC 1st July 15pm | (Update the file CONDTIONS748.txt during the
experiment)
|
|
Fixed | |
Sat Jul 1 17:09:04 2017 |
e748 | MUST2 | General | | TIME CAL CHECK | run_0040_CalMust2Histos.root |
|
Fixed | e748 |
Sat Jul 1 22:16:46 2017 |
e748 | DAQ | General | N/A | Problem of Merge | The DAQ was not merging properly.
We figured out that the centrum was goiging
out of sync when the run was stopped.
|
|
Fixed | e748 |
Sun Jul 2 03:46:11 2017 |
e748 | OTHER | Hardware | | UPDATE OF TAC settings | Here are several changes made during the night
to optimize timing for TACs:
|
|
Fixed | e748 |
Sun Jul 2 04:58:36 2017 |
e748 | RUN | General | N/A | Run 74: MASK IN | Starting Run 74 with trigger plastic and MASK
at target position.
|
|
Fixed | e748 |
Sun Jul 2 05:45:18 2017 |
e748 | CATS | Software | N/A | Mask CATS 2 | Run 75
shift surveyor
|
|
Fixed | e748 |
Sun Jul 2 05:56:12 2017 |
e748 | CATS | Software | N/A | Mask on target | Run 74 Mask on target
With surveyor offsets and the inversion X |
 |
Fixed | e748 |
Sun Jul 2 08:06:53 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 77 global check | Conditions of Run 77
2 July - start at 6h29 - stop at 8h38
|
6x |
Fixed | e748 |
Sun Jul 2 08:40:25 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 78 - 2 July - 18O beam | Run #78 CD2 2.5 mg/cm2 position 3 - 18O
beam
Same conditions as for Run 77
|
    |
Fixed | e748 |
Sun Jul 2 08:46:13 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | Summary of the TAC conditions | JULY 2nd 8pm
Bidiv = 1 for CATS1 and 2
|
|
Fixed | e748 |
Sun Jul 2 09:54:05 2017 |
Valérie Lapoux | DAQ | General | CD2 | Test of the TAC plast CATS ADC VXI Run78 | |
 |
Fixed | e748 |
Sun Jul 2 10:31:48 2017 |
Valérie Lapoux | ONLINE | Hardware | CD2 | Change of the electronics for TAC Plast CATS1 | Shift U (Béa +Vlx) entered in the room to
check the electronics of Cats1 and of the
TAC plast-Cats1
|
|
Fixed | e748 |
Sun Jul 2 10:44:59 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 79 Beam of 18O | run_0079.dat.02-07-17_10h37m20s
Triggers : all MUST2 telescopes 1 to 8.
The pulser is ON again in the DAQ and Scaler |
8x |
Fixed | e748 |
Sun Jul 2 11:38:03 2017 |
Valérie Lapoux | RUN | General | CD2 | Runs 80-81 TESTS change of TAC and triggers | For runs 80- 81:
for test purposes, we changed the coincidence
mode for CATS: we put FAG instead of the |
|
Fixed | e748 |
Sun Jul 2 12:08:56 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 82 | Run82 start at 12h00 stop at 12h09
e748 Exxx 6684672 2 juil. 12:09 run_0082.dat.02-07-17_12h00m43s
Before starting run 82, we enter in the D6 |
|
Fixed | e748 |
Sun Jul 2 12:16:57 2017 |
Valérie Lapoux | RUN | General | CD2 | Runs 83-84 only CATS1 trigger | Run83 start at 12h11 stop at 12h16
e748 Exxx 21561344 2 juil. 12:16 run_0083.dat.02-07-17_12h11m16s
|
 |
Fixed | e748 |
Sun Jul 2 13:22:46 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 85+summary TAC | Started run #85 at 13h21 stop at 13h31
e748 Exxx 5439488 2 juil. 13:31 run_0085.dat.02-07-17_13h21m57s
Triggers all MUST2
|
|
Fixed | e748 |
Sun Jul 2 13:31:21 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 86 trigger CATS1 | Run 86 start at 13h32 stop at 13h43
e748 Exxx 34340864 2 juil. 13:43 run_0086.dat.02-07-17_13h32m13s
|
 |
Fixed | e748 |
Sun Jul 2 13:49:20 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 88 trigger CATS1 | Run 88 start at 13h48
TRIGGER CATS1 div =100 only
18O beam CD2 target
|
|
Fixed | e748 |
Sun Jul 2 14:49:41 2017 |
Valérie Lapoux | ONLINE | Hardware | CD2 | TAC and signals for Plast-CATS1 | Now we return to the situation of 2 TACs for
the coding of the same time Plast-Cats1 in
the 2 DAQs systems VXI_CHIO and VXI_MUST2.
|
|
Fixed | e748 |
Sun Jul 2 14:54:39 2017 |
Valérie Lapoux | RUN | General | | Runs 90-92 Tuning of the cocktail beam in D4 | Runs 90 to 92 Tuning of LISE
GMT Trigger IN13=Trig_LISE (D4)
|
|
Fixed | e748 |
Sun Jul 2 15:13:49 2017 |
Valérie Lapoux | RUN | General | | Runs 93-94 Tuning of the cocktail beam in D6 | Runs 93-94 Tuning of LISE
GMT Trigger IN13=Trig_LISE (=D6)
e748 Exxx 25493504 2 juil. 15:11 run_0093.dat.02-07-17_15h07m01s
|
|
Fixed | e748 |
Sun Jul 2 17:25:22 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | ADC parameters-new ones for LISE +Pulser for Correlations | New parameter for LISE in VXI_CHIO ADC_CHIO
parameter TED4HF address=4 channel 5 (cable |
 |
Fixed | e748 |
Sun Jul 2 18:19:24 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | Change of DAQ parameters for LISE | |
|
Fixed | e748 |
Sun Jul 2 18:27:48 2017 |
Valérie Lapoux | ONLINE | Software | | Narval configuration, Watcher ports | New file xml is loaded with various Watchers,
the corresponding ports
Watcher 10205
|
|
Fixed | e748 |
Sun Jul 2 19:40:02 2017 |
Valérie Lapoux | DAQ | General | | Correlation parameters for ChiO in VXI-ChIO VXI_MUST2 | - Parameters
VXI_CHIO
ADC_CHIO_V15 channel 16, add=15
|
|
Fixed | e748 |
Sun Jul 2 22:03:45 2017 |
e748 | RUN | General | N/A | Run 118 |
-> bidon: Beam in D4 but Trig <> LISE
|
|
Fixed | e748 |
Sun Jul 2 23:20:43 2017 |
LISE team JCT+ChrS | BEAM | General | N/A | Identification plot LISE Run 119 | Run 119 2nd July started at 22h20 (around)
Lise trigger
PID ED4_TED4HF without wedge
|
|
Fixed | e748 |
Mon Jul 3 03:48:57 2017 |
e748 | OFFLINE | General | | Correlation Test on Run 104 |
We analysed run 104 to check the correlation
of events coded in different crates. It is |
|
Fixed | e748 |
Mon Jul 3 06:26:24 2017 |
e748 | OTHER | General | N/A | Damned ELOG | We just recovered the ELOG after 5-6 hrs out
of order |
|
Fixed | e748 |
Mon Jul 3 06:30:54 2017 |
e748 | BEAM | General | N/A | 12Be beam rate | Final 12Be beam rate as obtained by JCT with
present wedge is about 6.10^3 per euA in
D6
|
|
Fixed | e748 |
Mon Jul 3 06:30:58 2017 |
e748 | DAQ | Software | | PROBLEM of conversion for RUN with even number | [COLOR=red][B]IMPORTANT[/B][/COLOR]
We realized that starting at run 160 (included) |
|
Fixed | e748 |
Mon Jul 3 07:04:30 2017 |
e748 | OTHER | General | N/A | tritons | Count rate in ZD plastic is bout 2;5 times
larger than in CATS1 and CATS2, probably
due to tritons |
|
Fixed | e748 |
Mon Jul 3 07:06:17 2017 |
e748 | RUN | General | CD2 | RUN 173 - First Physics with 12Be | RUN 173
START: 6H11
|
  |
Fixed | e748 |
Mon Jul 3 07:52:36 2017 |
e748 | RUN | General | CD2 | RUN 175 | [B]RUN 175
[/B]
|
|
Fixed | e748 |
Mon Jul 3 07:52:39 2017 |
e748 | RUN | General | CD2 | RUN 175 | [B]RUN 175
[/B]
|
|
Fixed | e748 |
Mon Jul 3 14:28:09 2017 |
Franck et Valérian | CHIO | Hardware | N/A | CHIO's electronic scheme | A quick scheme of the CHIO electronic. The
patch outputs are the one from the LISE acquisition
room. |
|
Fixed | e748 |
Mon Jul 3 17:28:05 2017 |
e748 -Thomas R, Georges V, Sébastien H | CHIO | General | N/A | (Tentative) Solution to recover the CHIO: it works! | An interview of Th, Seb and Georges by Valérie
on July 3rd.
Please indicate complements or corrections |
 |
Fixed | e748 |
Mon Jul 3 17:31:08 2017 |
e748 | OFFLINE | General | CD2 | BEAM and FRAGMENT PID | We used the Si in D6 and the TOF(CATS1-CAVIAR)
to identify the beam nuclei.
|
  |
Fixed | e748 |
Mon Jul 3 18:45:41 2017 |
Valérie L | DAQ | General | N/A | Checking ALL RUNS with Ganil_Tape | The problems with the runs which could not
be converted during the night was due
to a double header buffers of the runs with |
  |
Fixed | e748 |
Mon Jul 3 19:43:16 2017 |
Franck | CHIO | Hardware | N/A | CHIO logic signals for TAC and CAEN digitizer | STOP of CHIO CAEN digitizer = VAL AND Delayed
CHIO (Delay = 700 ns). Before run 217, the
CHIO was not delayed.
|
|
Fixed | e748 |
Mon Jul 3 19:59:02 2017 |
Valérie L | RUN | General | CD2 | Series of runs - afternoon/evening 3rd July |
Series of runs during the afternoon with
the tuning of the ChIo and the tuning of |
|
Fixed | e748 |
Mon Jul 3 20:02:46 2017 |
e748 | OFFLINE | General | CD2 | run217 | PID run 217
trigger = plast |
|
Fixed | e748 |
Mon Jul 3 20:29:56 2017 |
Valérie L | RUN | General | CD2 | Data runs after LISE tuning | The beam was tuned by the LISE team.
Beam conditions during the run 222 were changed
to increase the beam at 1µA.
|
|
Fixed | e748 |
Mon Jul 3 20:42:14 2017 |
Valérie L | RUN | General | CD2 | Conditions for data runs, Run 223 | Triggers for the experiments :MM1...MM8,
CATS1 div, Cats2div Plast div
All divisions on triggers are set at 100.
|
|
Fixed | e748 |
Mon Jul 3 21:13:18 2017 |
e748 | OFFLINE | General | N/A | cats | run222 cats |
|
Fixed | e748 |
Mon Jul 3 21:41:57 2017 |
Valérie L | RUN | General | CD2 | Runs 225-227 | ---------------------------------------------------------------------------------
3 µA at 21h25 ; CAVIAR D6 28000/s
CATS 20000/s
|
|
Fixed | |
Mon Jul 3 22:10:28 2017 |
Valérie L | CATS | Hardware | CD2 | VXI CATS crate problem solved | We had problems with CATS VME/VXI crate.
It was idle and it was not possible to restart
it by breakup and init.
|
 |
Fixed | e748 |
Mon Jul 3 22:24:05 2017 |
Valérie L | RUN | General | CD2 | Run series of problems 3rd July | The daq was unstable with several problems
of the merge from LISE.
We did tk kna (kill narval process) and na.
|
|
Fixed | |
Mon Jul 3 22:40:33 2017 |
e748 | RUN | General | | Plastic_Cats_T | Tac run_223
Range: T_CATS1_CAV 1 µs
|
 |
Fixed | e748 |
Mon Jul 3 23:06:24 2017 |
Valérie L | RUN | General | CD2 | Problem during Run 230-231 with CATS | r-- 1 e748 Exxx 34013184 3 juil. 22:52
run_0230.dat.03-07-17_22h46m03s
-rw-r--r-- 1 e748 Exxx 97910784 3 juil. |
  |
Fixed | e748 |
Mon Jul 3 23:16:33 2017 |
Valérie L | DAQ | General | CD2 | Change of TAC RANGES (from run 230) | TAC range changed after run 229.
NB: Change applied for Runs 230 and 231
BUT these runs are not working due to problems |
|
Fixed | |
Tue Jul 4 00:53:18 2017 |
Valérie L | RUN | General | CD2 | Runs with merge and time out problems | -r--r--r-- 1 e748 Exxx 720896 3 juil.
21:55 run_0226.dat.03-07-17_21h54m51s
-rw-r--r-- 1 e748 Exxx 786432 3 juil. |
|
Fixed | |
Tue Jul 4 00:54:41 2017 |
Valérie L | RUN | General | CD2 | Runs after reset of VXI |
VXI CHIO was offline --> reset of ganlx9
(entering in D6) on the VXI crate
|
|
Fixed | e748 |
Tue Jul 4 01:00:26 2017 |
Valérie L | RUN | General | CD2 | Run 239 test with trigger MUST2 | Started run #239 4JULY start 00h59 stop 1h15
PROBLEM junk header checked with Ganil Tape
triggers only MUST2 IN1 to IN8
|
|
Fixed | e748 |
Tue Jul 4 01:17:35 2017 |
Valérie L | RUN | General | CD2 | Run 240 | Run #240 4JULY start 1h17
(run ok checked with Ganil_Tape)
All triggers MUST2 IN1 to IN8,
|
|
Fixed | e748 |
Tue Jul 4 01:21:04 2017 |
e748 | OFFLINE | General | CD2 | run 236 | cats > target
cats > target, gated by must |
|
Fixed | e748 |
Tue Jul 4 02:33:36 2017 |
Valérie L, shifts U+S Yorick | RUN | Hardware | | GMT channel 8 | Apparently Channel 8 of the GMT is not operational.
We put telescope T8 in entry 15.
This operation gives good results, see pictures |
 |
Fixed | e748 |
Tue Jul 4 04:01:50 2017 |
e748 | RUN | Hardware | | RUN249 | RUN249
Same setting as RUN248.
|
|
Fixed | e748 |
Tue Jul 4 05:01:21 2017 |
Yorick | RUN | General | CD2 | Runs 248-250 | These are long runs with CD2
MUST8 is in GMT 15.
Missing Times: T7 X and Y; T5 Y.
|
|
Fixed | e748 |
Tue Jul 4 05:08:30 2017 |
e748 | MUST2 | Hardware | | MUST2 signql check in offline analysis | RUN248
MUST2 DSSD XE signal for all telescopes T1-T8
confirmed.
|
|
Fixed | e748 |
Tue Jul 4 05:11:20 2017 |
e748 | MUST2 | Hardware | | MUST2 signql check in offline analysis | RUN248
MUST2 DSSD XE signal for all telescopes T1-T8
confirmed.
|
10x |
Fixed | e748 |
Tue Jul 4 05:20:31 2017 |
e748 | RUN | Hardware | | RUN250 | Same setting as RUN248.
run_0250.dat.04-07-17_04h58m50s
start 4h58 Gtape ok
|
|
Fixed | e748 |
Tue Jul 4 05:23:20 2017 |
e748 | CATS | Software | | CATS signal | RUN248
The chqrge distribution of CATS1&2, X&Y
Gate:CATSdiv trigger |
   |
Fixed | e748 |
Tue Jul 4 07:00:55 2017 |
e748 | RUN | Hardware | | RUN252 | Same setting as RUN248.
RUN251 junk header
run_0252.dat.04-07-17_05h33m06s
|
|
Fixed | e748 |
Tue Jul 4 07:01:50 2017 |
e748 | RUN | Hardware | | RUN254 | Same setting as RUN248.
RUN253 junk header
run_0254.dat.04-07-17_06h32m10s
|
|
Fixed | e748 |
Tue Jul 4 07:37:09 2017 |
e748 | RUN | Hardware | | RUN256 | Same setting as RUN248.
RUN255 junk header
run_0256.dat.04-07-17_07h34m59s
|
|
Fixed | e748 |
Tue Jul 4 07:46:48 2017 |
e748 | RUN | Hardware | | RUN258 | Same setting as RUN248.
RUN257 junk header
run_0258.dat.04-07-17_07h45m32s
|
|
Fixed | e748 |
Tue Jul 4 08:36:50 2017 |
e748 | RUN | Hardware | | RUN260 | Same setting as RUN248.
RUN259 junk header
run_0260.dat.04-07-17_08h32m05s
|
|
Fixed | e748 |
Tue Jul 4 09:01:19 2017 |
e748 | RUN | Hardware | | RUN262 | Same setting as RUN248.
RUN261 junk header
run_0262.dat.04-07-17_08h56m13s
|
|
Fixed | e748 |
Tue Jul 4 09:48:53 2017 |
e748 | RUN | General | CD2 | Run 265 | Run 265: Trigger MUST Only |
|
Fixed | e748 |
Tue Jul 4 09:49:52 2017 |
e748 | RUN | General | CD2 | Run 266 | Run 266: Trigger CATS1 Only |
|
Fixed | e748 |
Tue Jul 4 09:50:11 2017 |
7e748 | RUN | General | CD2 | Run 267 | Run 267: Trigger CATS2 Only |
|
Fixed | e748 |
Tue Jul 4 09:51:55 2017 |
8e748 | RUN | General | CD2 | Run 268 | Run 268: Trigger Plastic Only |
|
Fixed | e748 |
Tue Jul 4 09:57:48 2017 |
e748 | RUN | General | CD2 | Run 269 | Run 269: Trigger MUST2 Only
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 10:21:52 2017 |
e748 | RUN | General | CD2 | Run 270 | Run 270: Trigger CATS1 or CATS2 Only
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 10:34:06 2017 |
e748 | RUN | General | CD2 | Run 271 | Run 271: Trigger [B]Telescope 2[/B] Only
(this one sees less beam particles)
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 11:00:21 2017 |
e748 | RUN | General | CD2 | Run 272 | Run 272: Trigger Plastic Only
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 11:02:07 2017 |
e748 | RUN | General | CD2 | Run 273 | Run 273: Trigger CATS1 and CATS2 Only
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 11:04:46 2017 |
e748 | RUN | General | CD2 | Run 274 | Run 274: Trigger T5-8 Only
Checking CHIO Digitization |
|
Fixed | e748 |
Tue Jul 4 13:15:11 2017 |
e748 | OTHER | General | N/A | troubles with CHIO digitizer |
1p.m.
CHIO Digitizer was fixed by Frederic and |
|
Fixed | e748 |
Tue Jul 4 13:24:40 2017 |
e748 | RUN | General | CD2 | Run 293 | Run 293
restart with all triggers. Chio digit fixed |
|
Fixed | e748 |
Tue Jul 4 14:24:37 2017 |
e748 | RUN | General | CD2 | Run 296 | Run 296
restart with all triggers. Chio digit fixed.
NUMEXO started |
|
Fixed | e748 |
Tue Jul 4 14:48:11 2017 |
8e748 | RUN | General | CD2 | Run 296 | Run 298
restart with all triggers MUST2 |
|
Fixed | |
Tue Jul 4 14:49:17 2017 |
e748 | MUST2 | General | | CsI THRESHOLD RUN 297 | By removing the threshold in the CsI we can
clearly see now the light particles well
separated in the DE/E
|
|
Fixed | e748 |
Tue Jul 4 15:50:02 2017 |
8e748 | RUN | General | CD2 | Run 296 | Run 299
restart with all triggers MUST2 |
|
Fixed | e748 |
Tue Jul 4 18:29:39 2017 |
e748 | MUST2 | Software | N/A | Start a new acquisition with Numexo | -To start a run :
START Acquisition NUMEXO
|
|
Fixed | e748 |
Tue Jul 4 19:38:32 2017 |
e748 | RUN | General | CD2 | Run #323 main daq - Run #322 NUMEXO2 | Run #323 on main daq <=> Run #322 NUMEXO2
Physics run: 12Be on CD2 #3 2.5 mg
On next run we will try to have the correct |
|
Fixed | e748 |
Tue Jul 4 20:27:59 2017 |
Franck et Valérian | CHIO | Hardware | N/A | UPDATE : CHIO's electronic scheme (valid from run 217) | Modification of the scheme to add the delay
on the CHIO's logic signal for stop of the
digitizer. |
|
Fixed | e748 |
Tue Jul 4 20:30:52 2017 |
e748 | RUN | General | CD2 | Run #323 scaler capture | Run #323 scaler capture at 20h30 |
|
Fixed | e748 |
Wed Jul 5 00:29:06 2017 |
Valérie L | RUN | General | CD2 | Summary of the evening runs 322(e748chio)-323 (e748) | ============================================================================================================
[e748'@ganp616 run]$ cd /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 4194288609 4 |
 |
Fixed | e748 |
Wed Jul 5 00:40:36 2017 |
Valérie L | RUN | General | CD2 | Overview of the evening config 322(e748chio)-323 (e748) | BEAM conditions
CAVIAR LISE 35k
GMT TRiggers:
|
  |
Fixed | e748 |
Wed Jul 5 00:58:43 2017 |
Valérie L | RUN | General | CD2 | Overview of the evening plots Run323-e748 (Run 322 chio) | Run 323 DAQ E748; Run 322 DAQ CHIO see plots
below.
|
19x |
Fixed | e748 |
Wed Jul 5 01:07:15 2017 |
e748 | OFFLINE | Software | | Merge of NUMEXO runs with standard runs | Here are some plots after offline merge correlation
of the CHIO energy coded in NUMEX0 with other
parameters.
|
   |
Fixed | e748 |
Wed Jul 5 03:35:53 2017 |
Valérie L | RUN | General | CD2 | SiLi 1/T5 trip | AT 3h30 we saw that the SiLi1 of T5 has tripped
during the run run_0323.dat.04-07-17_19h25m59s.2
(run started at 2h22)
|
|
Fixed | e748 |
Wed Jul 5 04:34:06 2017 |
e748 shift U | RUN | General | CD2 | Overview of Config and TAC during run 323 (.3) | The counting rates in the Gatconf, confdev,
dataTrig of the different branches are checked
in the first plot below.
|
 |
Fixed | e748 |
Wed Jul 5 04:55:06 2017 |
Valérie L | RUN | General | CD2 | Scalers and summary of Run 323 at 4h55-7h30 | E748 Runs (around 3h30 for 1Go)
Run 323_2 started at 2h22 stop 5h56
|
 |
Fixed | e748 |
Wed Jul 5 06:11:47 2017 |
e748 shift U | RUN | General | CD2 | Overview of Config +QplastTcats1 during run 323 (.5) | The counting rates in the Gatconf, confdev,
dataTrig of the different branches are checked
in the first plot below.
|
 |
Fixed | e748 |
Wed Jul 5 08:10:03 2017 |
Valérie L | RUN | General | CD2 | Run 325 DAQ 748- run 325 DAQ ChIo | We stopped the run 323 (DAQ E748) and run
322 (ChIo) when the beam was stopped by the
machine during 10 minutes to check the beam |
   |
Fixed | e748 |
Wed Jul 5 09:13:17 2017 |
e748-A. Lemasson | CHIO | Hardware | CD2 | CHIO cathode problems | Thomas and Julien going to D6, the cathode
power supply tripped.
Setting it back and we will check signal |
|
Fixed | e748 |
Wed Jul 5 09:22:16 2017 |
Valérie L | RUN | General | CD2 | Run 326DAQ- Run 326Chio | Run 325 start at 9h19
We are running again after some change -switching
on- of the power supply of the ChIo cathode).
|
  |
Fixed | e748 |
Wed Jul 5 10:54:09 2017 |
Valérie L | RUN | General | CD2 | SiLi 1/T5 trip | AT 10h50 we saw that the SiLi1 of T5 has tripped
during the run run_0328.dat. (run started
at 10h15 )
|
|
Fixed | e748 |
Wed Jul 5 10:58:54 2017 |
Valérie L | RUN | General | CD2 | Run summary 327, 328 | run daq E748 (3h30 for 1Go)
-r--r--r-- 1 e748 Exxx 100M 5 juil. 10:14
run_0327.dat.05-07-17_09h55m11s
|
 |
Fixed | e748 |
Wed Jul 5 11:10:48 2017 |
Valérie L. | MUST2 | General | CD2 | Geometrical configurations for MUST2 | |
|
Fixed | e748 |
Wed Jul 5 11:13:27 2017 |
Valérie L. | MUST2 | General | CD2 | Power boards HV and LV for MUST2 | |
|
Fixed | e748 |
Wed Jul 5 14:34:15 2017 |
Marlene | RUN | General | CD2 | Run summary 329,330 | We thought the merge was broken, but the issue
was the Raw Data gruscipt connecting to the
wrong port.
|
    |
Fixed | e748 |
Wed Jul 5 15:30:03 2017 |
Freddy | OFFLINE | General | | MUST2 offline analysis of run 323 | Here is a plot of the MUST2 PID for telescope
3:
- dE - TOF with a veto on CsI_ to remove |
|
Fixed | e748 |
Wed Jul 5 17:15:57 2017 |
e748 DB | RUN | General | CD2 | screenshot of scalers | primary I = 6.9 uA
[IMG]elog:209/1[/IMG] |
|
Fixed | e748 |
Wed Jul 5 18:36:49 2017 |
Freddy | OFFLINE | General | | PID from NUMEXO merged (partially) | Here is the PID(dE Vs E) plot obained using
the IC energy from NUMEXO Vs the plastic
energy coded in our acquisition for the long |
|
Fixed | e748 |
Wed Jul 5 18:47:25 2017 |
e748 DB | RUN | General | CD2 | new run - 331 | primary I = 6.9 uA
[IMG]elog:211/1[/IMG] |
|
Fixed | e748 |
Wed Jul 5 19:05:13 2017 |
e748 DB & IS | RUN | General | CD2 | tritons in the beam | Tritons can be seen from the following plot.
Some of them cross target frame and then
lose 1.5MeV in the DSSDs.
|
|
Fixed | e748 |
Wed Jul 5 19:10:33 2017 |
e748 DB&IS | ONLINE | General | CD2 | tritons in the beam | Tritons can be seen from the following plot.
Some of them cross target frame and then
lose 1.5MeV in the DSSDs.
|
|
Fixed | e748 |
Wed Jul 5 21:13:14 2017 |
e748 IS | RUN | General | CD2 | RUN 331 scalers | primary beam I = 6.5 uA unstable in the last
30 minutes (20h20 - 20h45)
|
|
Fixed | e748 |
Wed Jul 5 22:29:10 2017 |
e748 DB | ONLINE | General | CD2 | trajectories | [IMG]elog:215/1[/IMG] |
|
Fixed | e748 |
Thu Jul 6 00:07:33 2017 |
e748 DB | ONLINE | General | CD2 | Strips CATS raw | [IMG]elog:216/1[/IMG] |
|
Fixed | e748 |
Thu Jul 6 01:00:21 2017 |
Freddy | MUST2 | Hardware | N/A | Problem with position of télescopes 6&7 | Due to a cabling problem telescope 6 was seen
as telescope 7 and inversly. |
|
Fixed | e748 |
Thu Jul 6 01:26:15 2017 |
Franck et Valérian | CHIO | Hardware | N/A | UPDATE : CHIO's electronic scheme (valid from run 293) | Since Run 293 inspection line of NUMEXO 2
has been used as input signal of CAEN digitizer. |
|
Fixed | e748 |
Thu Jul 6 01:34:42 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) | 1:25 file change -> run_0331.dat.05-07-17_18h45m44s.2
18O beam: 6.6 uAe
CATS1: 40000 cps
|
|
Fixed | |
Thu Jul 6 02:02:48 2017 |
Anastasia | OFFLINE | General | | First signs of the elastic | Hereby you can see some first signs of the
[U]elastic scattering[/U] [COLOR=purple]12Be(d,d)12Be[/COLOR]
with punch through events that will be later |
|
Pinned | e748 |
Thu Jul 6 02:41:13 2017 |
Freddy and the night shifters | CHIO | General | | CHIO analog treatment | Interestingly, the bipolar output of the amplifier
of the CHIO sent (and splitted) to check
correlation on the channel 15 of the ADC |
|
Fixed | e748 |
Thu Jul 6 03:03:39 2017 |
iFreddy and the night shifters | CHIO | General | | CHIO analog (unipolar and bipolar) and digital | Interestingly, the bipolar output of the amplifier
of the CHIO sent (and splitted) to check
correlation on the channel 15 of the ADC |
  |
Fixed | e748 |
Thu Jul 6 03:35:32 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) | 3:30 file change -> run_0331.dat.05-07-17_18h45m44s.3
18O: 7.2 uAe
CATS1: 40000 cps
|
|
Fixed | e748 |
Thu Jul 6 05:48:26 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 trip | Restart SiLi 1/T5 that reached 26 uA and tripped
a few minutes ago.
Current = 21 uA when biased up again, and |
|
Fixed | e748 |
Thu Jul 6 06:23:18 2017 |
e748 | RUN | General | CD2 | Run 331 (file change) | 6:19 file change -> run_0331.dat.05-07-17_18h45m44s.4
18O 7.1 uAe
CATS1 : 36000 cps
|
|
Fixed | e748 |
Thu Jul 6 07:17:05 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 trip | SiLi 1/T5 tripped at 7:16.
We turn it on again immediately -> 23 uA |
|
Fixed | e748 |
Thu Jul 6 07:23:22 2017 |
e748 | MUST2 | Software | CD2 | MUST2 : VMECOM : TCP error - TCP/IP : time-out | "MUST2 : VMECOM : TCP error - TCP/IP : time-out"
at 7:19.
RRC shows MUST2 "OFFLINE"
|
|
Fixed | e748 |
Thu Jul 6 07:58:09 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 triped | SiLi 1/T5 triped at 7:30. We leave it off
while trying to restart the run control.
We turn it on again at 8:03. |
|
Fixed | e748 |
Thu Jul 6 08:22:08 2017 |
Valérie L | RUN | General | CD2 | Problem of DAQ and networks problems | After the problem on Run control and the offline
of MUST2, the DAQ on numexo could not be
started again.
|
   |
Fixed | e748 |
Thu Jul 6 09:54:53 2017 |
Valérie L | RUN | General | CD2 | Run control OK -Runs 339 and 340 | After the reboot soft of the AGAVA NUMEXO
and realignment of the TGS (time stamp Agava)
the situation is stabilized.
|
  |
Fixed | e748 |
Thu Jul 6 10:35:50 2017 |
Valérie L | MUST2 | General | CD2 | Sili-1/T5 trip | The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still
increasing 25.6µA at 11h30.(The limit Io |
|
Fixed | e748 |
Thu Jul 6 10:39:09 2017 |
BéaF & ValérieL - shift U | OFFLINE | General | | Test of merge on Run 339 | spectra of the merge checked by Béa.
The merge is correct on the correlations
cf plots below.
|
 |
Fixed | e748 |
Thu Jul 6 11:41:20 2017 |
Valérie L | DAQ | General | N/A | MEMO START/STOP + AGAVA configuration in DAS | START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo; |
    |
Fixed | e748 |
Thu Jul 6 13:21:49 2017 |
Daisuke | RUN | Hardware | CD2 | RUN340 | During RUN340
13h10 The beam intensity dropped from 35 |
|
Fixed | e748 |
Thu Jul 6 13:33:23 2017 |
e748 | RUN | General | CD2 | Stop of Run 340 due to beam problems | The run 340 was stopped at 13h32. Before the
stop fo the run the beam was unstable and
stopped by machine team.
|
|
Fixed | e748 |
Thu Jul 6 13:37:22 2017 |
Valérie L | RUN | General | CD2 | Run 341 | Run 341 START AT 13h37 STOP AT 15h21 (beam
stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam |
 |
Fixed | e748 |
Thu Jul 6 13:37:37 2017 |
Adrien Matta | OFFLINE | General | N/A | Energy loss table for d, 3He and 3H | Here it is! |
20x |
Fixed | e748 |
Thu Jul 6 14:07:20 2017 |
Bea | OFFLINE | General | CD2 | Convert & Merge Numexo Runs in ganp166 | To Convert run DAQ_general
offline
|
|
Fixed | e748 |
Thu Jul 6 15:24:25 2017 |
e748-shift U | BEAM | General | CD2 | Beam stop, end of run 341 | The beam was stopped due to vacuum problem
at CSS2.
End of run 341 at 15h21. |
|
Fixed | e748 |
Thu Jul 6 17:05:51 2017 |
Valérie L | RUN | General | CD2 | run 342 +overview of TAC | Beam recovered after shut down due to the
vacuum problem (power supply on the vacuum
system was off). Beam was off during 1h30.
|
    |
Fixed | e748 |
Thu Jul 6 19:17:12 2017 |
e748 MA | RUN | General | CD2 | RUN 343 | Run 343
same conditions as run 342
beam=7uA
|
|
Fixed | e748 |
Thu Jul 6 20:07:46 2017 |
Daisuke + Thomas R+ Valérie L | CHIO | General | CD2 | Problem of counting on Chio | It seems that the ChIo is counting at a very
low rate, around 100/s instead of 5000/s
in previous runs.
|
|
Fixed | e748 |
Thu Jul 6 20:46:15 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 345 DAQ+344 chio after chio problem | The HV on cathode is now set again at 2900V.
At 20h50 we get back the beam for the run.
(Grid still ok at 920V)
|
|
Fixed | e748 |
Thu Jul 6 21:27:52 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 345 beam intensity loss | The beam rate was low after intervention with
the CHIO HV.
|
|
Fixed | e748 |
Thu Jul 6 21:35:29 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 346 e748+e748chio |
Run 346 started at 21h37
Beam around 7µA CATS 2 46k
|
6x |
Fixed | e748 |
Fri Jul 7 00:25:16 2017 |
e748 | MUST2 | Software | CD2 | Calibration for CsI | Rough energy calibration for CsI was performed
(only for MM1 and MM4).
|
|
Fixed | e748 |
Fri Jul 7 00:42:50 2017 |
Shumpei | MUST2 | Software | CD2 | Calibration for CsI | Rough energy calibration for CsI was performed
(only for MM1 and MM4).
Method;
|
|
Fixed | e748 |
Fri Jul 7 00:43:51 2017 |
Shumpei | MUST2 | Software | CD2 | Calibration for CsI | Rough energy calibration for CsI was performed
(only for MM1 and MM4).
Method;
|
|
Fixed | e748 |
Fri Jul 7 02:28:26 2017 |
Anastasia + Didier | ONLINE | General | CD2 | scalers during run 346 | [IMG]elog:249/1[/IMG] |
|
Fixed | e748 |
Fri Jul 7 02:56:25 2017 |
Anastasia + Didier | ONLINE | General | CD2 | CATS raw 2D charge during run 346 | [IMG]elog:250/1[/IMG] |
|
Fixed | |
Fri Jul 7 06:55:54 2017 |
Anastasia + Iulian | ONLINE | General | CD2 | Run 346 | Run 346 still running.
We see in the Must2 impact also the other
two telescopes T6T7
|
 |
Fixed | |
Fri Jul 7 07:34:54 2017 |
Anastasia + Iulian | ONLINE | General | CD2 | Run 346 | Beam intensity: 7.433 µA |
|
Fixed | e748 |
Fri Jul 7 08:17:38 2017 |
e748 | RUN | General | CD2 | Run 347 | Stop run 346 and start run 347 after rewriting
parameters onto CHIO digitizer.
Digitized CHIO signals back in Vigru.
|
|
Fixed | e748 |
Fri Jul 7 08:56:43 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 current | SiLi 1/T5: 380V, 24.9 uA (current limit set
at 26 uA)
Apparently, it hasn't triped since July 6, |
|
Fixed | e748 |
Fri Jul 7 10:46:21 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 current | HV = 380 V
I = 25.1 uA |
|
Fixed | e748 |
Fri Jul 7 10:56:12 2017 |
e748 | RUN | General | CD2 | Run 347 (file change) | 10:50 data file change -> run_0347.dat.07-07-17_08h15m06s.1
18O: 7.5 uAe
CATS1 42 kcps
|
|
Fixed | e748 |
Fri Jul 7 12:00:29 2017 |
e748 | RUN | General | CD2 | Stop run 347 - Short machine problem | Short beam interruption due to a machine problem.
We stop run 347. |
|
Fixed | e748 |
Fri Jul 7 12:02:02 2017 |
e748 | RUN | General | CD2 | Run 348 | Restart after short machine problem.
Same conditions as previous run.
|
 |
Fixed | e748 |
Fri Jul 7 15:15:42 2017 |
e748 | BEAM | General | CD2 | Runs 349 to 364 - 10Be LISE tuning | Slits F31 = +/- 20 mm
Momentum acceptance = 2.5 % total |
|
Fixed | e748 |
Fri Jul 7 15:20:45 2017 |
e748 | BEAM | General | CD2 | Run 365 - 10Be LISE tuning | Slits F31 = +/- 4 mm
Momentum acceptance = 0.5 % total
2 uAe -> 80000 cps on CATS |
|
Fixed | e748 |
Fri Jul 7 15:55:29 2017 |
e748 | BEAM | General | CD2 | Run 366 - 10Be tuning - Centering on TARGET | FH31 slits = +/- 4 mm
DAC2 = -3 A |
 |
Fixed | e748 |
Fri Jul 7 16:01:22 2017 |
e748 | RUN | General | CD2 | Run 367 | FH31 slits (momentum slits) = +/- 4 mm
DAC2 = -3 A
Triggers = MUST2, CATS1div, CATS2div
|
|
Fixed | e748 |
Fri Jul 7 16:32:24 2017 |
e748 | RUN | General | CD2 | summary of runs 363-367 |
/data/e748X/e748/acquisition/run
r--r--r-- 1 e748 Exxx 19M 7 juil. 15:01 |
|
Fixed | e748 |
Fri Jul 7 16:34:34 2017 |
e748 shift U Simon G. + Valérie L | RUN | General | CD2 | Overview of Run 368 - 10Be beam | Run 368 started at 16h30 stop at 18h01 (automatic
stop)
|
12x |
Fixed | |
Fri Jul 7 18:04:58 2017 |
e748 | OFFLINE | General | | Kinematic Line12Be(d,3He)11Li | |
|
Fixed | e748 |
Fri Jul 7 18:18:13 2017 |
e748 Thomas R. +shift U Simon G +Valérie L | CHIO | General | CD2 | Thomas's explanations on Agava |
AGAVA
cf drawing below done by Thomas.
|
|
Fixed | e748 |
Fri Jul 7 20:26:30 2017 |
e748 shift U Simon G +Valérie L | RUN | General | CD2 | Runs 368, 368_1, 368_2, 368_3 10Be runs | RUNS 368, 368_1, 368_2
I ~ 3.7 eµA (on D6 TI22)
General DAQ 1Go during 1h30
|
  |
Fixed | e748 |
Fri Jul 7 22:02:39 2017 |
e748 shift U Simon G +Valérie L | CATS | General | CD2 | CATS situation | During Run 368, we note at 21h30 that now
CATS2 has continuously a 0.1 µA current.
Maybe there are some microtrips on some central |
 |
Fixed | e748 |
Fri Jul 7 22:36:12 2017 |
e748 shift U Simon G +Valérie L | BEAM | General | CD2 | Beam during Run368, situation at 22h30 | After strong instabilities the beam intensity
is better and we have recovered nearly 93kcps
on CATS2 as during the beginning
|
 |
Fixed | e748 |
Fri Jul 7 23:45:52 2017 |
e748 shift U Simon G +Valérie L (-12 am)/ Daisuke+Shumpei+Marlene (12 am -) | RUN | General | CD2 | Run 368 (following) at 23h45 | At 23h45; Beam stable I 3.95 µA
CATS2 ~ 94 kcps (2 pictures of CATS at 4
hours difference attached)
|
6x |
Fixed | e748 |
Sat Jul 8 06:02:18 2017 |
e748 Marlène Daisuke Shumpei | RUN | General | CD2 | RUN369 | Caviar has tripped during the night (before
4a.m.)
We have put the bias again but we could not |
|
Fixed | e748 |
Sat Jul 8 08:39:10 2017 |
Daisuke, Shumpei | OFFLINE | General | CD2 | 12Be(d,t)? | /home/e748/analysis/nptool/Outputs/Analysis/runtest.root
(run_0331_0.root?) was analyzed.
DSSD energy vs theta_lab plot for triton |
  |
Fixed | e748 |
Sat Jul 8 08:39:37 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t)? | /home/e748/analysis/nptool/Outputs/Analysis/runtest.root
(run_0331_0.root?) was analyzed.
DSSD energy vs theta_lab plot for triton |
  |
Fixed | e748 |
Sat Jul 8 09:00:32 2017 |
e748 Anastasia, D. | RUN | General | N/A | error msg on run control (run 369) | [IMG]elog:274/1[/IMG] |
|
Fixed | e748 |
Sat Jul 8 09:19:37 2017 |
e748 Anastasia, D. | RUN | General | N/A | CATS raw 2D charge during run 369 | [IMG]elog:275/1[/IMG] |
|
Fixed | e748 |
Sat Jul 8 09:43:17 2017 |
e748 Anastasia, D. | RUN | General | N/A | DAQ Parameters: Caviar new run 370 | Threshold of CAVIAR_DDM changed from ~ -800
to ~ -510
run 370 Triggering only in Cats to check |
|
Fixed | e748 |
Sat Jul 8 11:42:43 2017 |
e748 Anastasia, D. | RUN | General | N/A | new Run 371 | Triggers MUST2 and CATS as before,
-rw-r--r-- 1 e748 Exxx 16M 8 juil. 11:43
run_0371.dat.08-07-17_11h41m39s
|
 |
Fixed | e748 |
Sat Jul 8 12:53:09 2017 |
e748 Anastasia, D. | RUN | General | N/A | RUN 371 | Changing Caviar thresholds during the run
to find the optimum efficiency
More specific The DDM16_4 the channels 4 |
 |
Fixed | e748 |
Sat Jul 8 14:00:06 2017 |
e748 Anastasia, D. | RUN | General | CD2 | Run 372 |
Start new run with final CAVIAR threshold
settings
|
  |
Fixed | e748 |
Sat Jul 8 16:39:00 2017 |
e748 | RUN | General | CD2 | Stop run 372 - CHIO digitizer lost parameters | |
|
Fixed | e748 |
Sat Jul 8 16:41:57 2017 |
e748 | RUN | General | CD2 | Run 373 | Restart after rewriting parameters onto CHIO
digitizer
Same conditions as previous run
|
  |
Fixed | e748 |
Sat Jul 8 17:04:25 2017 |
e748 | RUN | General | CD2 | RUN 374 | We stopped run 373 to check the MUVI scalers
on the DAS.
We wrote the parameters onto the CHIO digitizer |
|
Fixed | e748 |
Sat Jul 8 19:41:25 2017 |
e748 | RUN | General | CD2 | Run 374 (file change) | 19:29 data file change -> run_0374.dat.08-07-17_16h57m56s.2
Previous change : 18:11 -> run_0374.dat.08-07-17_16h57m56s.1
|
  |
Fixed | e748 |
Sat Jul 8 20:49:48 2017 |
e748 | BEAM | General | CD2 | Beam position on target | The beam spot on target has shifted upwards
by ~3 mm since beginning of 10Be run (see
run 366 and attached plot from run 374, July |
|
Fixed | e748 |
Sat Jul 8 21:04:07 2017 |
e748 | BEAM | General | CD2 | Update: beam position on target | At ~21:00 we called PCP: They adjusted the
DC41VE steerer to center vertically the beam
on our target.
|
|
Fixed | e748 |
Sat Jul 8 21:53:58 2017 |
e748 | BEAM | General | CD2 | Scalers run 374 | Counting rates keep decreasing though the
primary is still ~4.5 uAe and the beam is
centered on our target.
|
|
Fixed | e748 |
Sat Jul 8 23:22:18 2017 |
e748 | BEAM | General | CD2 | Update on counting rates + scalers | 18O 4.5 uAe
CATS1 91 kcps
CATS2 114 kcps
|
|
Fixed | e748 |
Sat Jul 8 23:51:06 2017 |
e748 shift U Valérie L. | RUN | General | CD2 | Overview of run 374 around midnight |
Run at 23h48 with stable conditions, 18O
beam: 4.5 µA
|
7x |
Fixed | e748 |
Sun Jul 9 02:41:49 2017 |
e748- shift U:Valérie L +Beyhan B. | RUN | General | CD2 | Run 374 - good beam conditions | The 18O was very stable between 0h and 2h
around I ~ 4.5 µA.
CAVIAR ~ 161k; CATS1 ~ 88kcps; CATS2~ 111kcps |
10x |
Fixed | e748 |
Sun Jul 9 04:21:42 2017 |
e748- Beyhan B + Valérie L | BEAM | General | CD2 | BEAM SURVEY AT PCP | The beam Survey from the PCP can be seen in
the attached picture below.
Our spokesperson Adrien M can go and ask |
|
Fixed | e748 |
Sun Jul 9 04:43:40 2017 |
e748 shift U Valérie L. +Beyhan B. | RUN | General | CD2 | Run 374- 9 JULY - stop at 5h | Between 4h-4h50 the 18O has decreased from
4.5 down to 4 µA.
CAVIAR ~ 161k; CATS1 ~ 90kcps; CATS2~ 114kcps |
 |
Fixed | e748 |
Sun Jul 9 05:21:29 2017 |
e748 shift U Valérie L. +Beyhan B.(-8h)/ Daisuke Shumpei (8h-) | RUN | General | CD2 | Run 375 after beam stop | The tuning of the beam alignment was checked
by the PCP. cf beam profiles at 5h15 in LISE
notebook and below.
|
11x |
Fixed | e748 |
Sun Jul 9 09:07:31 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 376 LISE tuning (underway) | RUN 376 short run to check beam profile during
LISE tuning.
|
 |
Fixed | e748 |
Sun Jul 9 09:13:54 2017 |
Jean-Charles Valérie L. Daisuke Shumpei | RUN | General | CD2 | Run 377 LISE tuning (underway) | RUN 376. LISE tuning to optimize the beam
spot on target. During this run, the beam
stop will be moved.
|
  |
Fixed | e748 |
Sun Jul 9 09:36:42 2017 |
Daisuke Shumpei Valérie L. (-9h50) Jean-Charles (-10h) | RUN | General | CD2 | Run 378 | Data accumulation after LISE tuning.
9h36 started.
|
10x |
Fixed | e748 |
Sun Jul 9 09:43:29 2017 |
Daisuke Shumpei Jean-Charles | OTHER | Hardware | CD2 | Printer Magnolia is out of cartridge.. | Use "iris-color". The printer is in the room
ACS17 (found left in the corridor from the
LISE counting room to the building exit). |
|
Fixed | e748 |
Sun Jul 9 10:27:09 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | More statistics for (d,t) channel.
Same gate as before () but MM1&MM4 are used. |
 |
Fixed | e748 |
Sun Jul 9 10:29:20 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | More statistics for (d,t) channel.
Same gate as before (Message ID: 273
Entry time: Sat Jul 8 08:39:37 2017) but |
 |
Fixed | e748 |
Sun Jul 9 11:56:31 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 12Be(d,t) | [quote="Shumpei, Daisuke"]More statistics
for (d,t) channel.
Same gate as before (Message ID: 273 |
|
Fixed | e748 |
Sun Jul 9 13:42:26 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | 10Be(d,t) & 10Be(d,3He)? | Same analysis for (d,t) channel but 10 Be
beam. run368-374.4 (-1 day data)
Separation for Z=3&4 with CHIO(analog) + |
  |
Fixed | e748 |
Sun Jul 9 16:37:21 2017 |
e748 | CHIO | General | CD2 | CHIO digitizer out | CHIO digitizer was out in run 378 |
|
Fixed | e748 |
Sun Jul 9 16:43:40 2017 |
e748 | OFFLINE | General | CD2 | Elastic scattering MM6&7 | Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope
(CsI veto and beam position gate) are shown.
|
|
Fixed | e748 |
Sun Jul 9 16:44:58 2017 |
Shumpei, Daisuke | OFFLINE | General | CD2 | Elastic scattering MM6&7 | Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope
(CsI veto and beam position gate on target) |
|
Fixed | e748 |
Sun Jul 9 18:44:38 2017 |
e748 | BEAM | General | CD2 | LOST BEAM around 18h30 | Vaccuum was lost after CSS2, so we lost the
primary beam (18:30)
Operators called the astreinte. |
|
Fixed | e748 |
Sun Jul 9 20:38:11 2017 |
e748 | BEAM | General | CD2 | LOST BEAM around 18h30 | Seems there is a water leak in the beam line
near alpha.
Astreinte is at work. |
|
Fixed | e748 |
Sun Jul 9 23:57:34 2017 |
e748 | BEAM | General | CD2 | NUMBER FOR PCP | There is a major shutdown of the GANIL phone
system.
You can not call the pcp via the usual extention; |
|
Fixed | e748 |
Mon Jul 10 00:23:41 2017 |
e748 | RUN | General | CD2 | Return of the beam (Jedi not available) | Beam is back.
JCT refoc the beam on target (attached pictures).
All god beside that. Still no phone on campus! |
|
Fixed | e748 |
Mon Jul 10 00:35:29 2017 |
e748 | RUN | General | CD2 | Run 380 | Started at 0:02
18O 4.3 uAe, fluctuating
|
|
Fixed | e748 |
Mon Jul 10 01:34:12 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | Data file change at 1:18 -> run_0380.dat.10-07-17_00h02m00s.1
18O 4.5 uAe
|
|
Fixed | e748 |
Mon Jul 10 02:04:33 2017 |
e748 | CATS | General | CD2 | CATS raw strips and trajectories | |
 |
Fixed | e748 |
Mon Jul 10 02:47:27 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | 2:26 data file change -> run_0380.dat.10-07-17_00h02m00s.2
18O 4.5 uAe
|
|
Fixed | e748 |
Mon Jul 10 03:34:24 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | 3:33 data file change -> run_0380.dat.10-07-17_00h02m00s.3
18O 4.5 uAe
|
|
Fixed | e748 |
Mon Jul 10 03:45:19 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 triped | Triped between 3:34 and 3:44.
We turn it back on at 3:46 (370 V) -> 22.5 |
|
Fixed | e748 |
Mon Jul 10 04:33:32 2017 |
e748 | CATS | General | CD2 | CATS: raw strips, trajectories and pos on target | |
  |
Fixed | e748 |
Mon Jul 10 04:46:11 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | 4:42 data file change -> run_0380.dat.10-07-17_00h02m00s.4
18O 4.4 uAe
|
|
Fixed | e748 |
Mon Jul 10 05:47:40 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | 5:46 data file change -> run_0380.dat.10-07-17_00h02m00s.5
18O 4.5 uAe
|
|
Fixed | e748 |
Mon Jul 10 06:53:40 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 triped | Triped at ~ 6:50.
We turn it back on at 370 V -> I = 18 uA
but increases rapidly to 21 uA |
|
Fixed | e748 |
Mon Jul 10 06:55:58 2017 |
e748 | RUN | General | CD2 | Run 380 (file change) | 6:48 data file change -> run_0380.dat.10-07-17_00h02m00s.6
18O 4.5 uAe
|
|
Fixed | e748 |
Mon Jul 10 08:19:45 2017 |
e748 | RUN | General | CD2 | End run 380 | We stop run 380 to enter D6 and select mask
target for CATS reference data. |
|
Fixed | e748 |
Mon Jul 10 08:37:23 2017 |
e748 | RUN | General | N/A | Run 381 mask target | Trigger = Plastic, div=1
Primary intensity = 1 uAe
CATS rate = 35 kcps
|
|
Fixed | e748 |
Mon Jul 10 10:06:27 2017 |
e748 | RUN | General | N/A | end of experiment | 10h06 we stop the experiment. |
|
Fixed | e748 |
Mon Jul 10 17:43:37 2017 |
Adrien | MUST2 | General | N/A | Calimero time calibrator | Run 1000 : MUVI 1 X
Time calibrator 20ns period, 512ns range |
|
Fixed | e748 |
Thu Jul 20 11:07:54 2017 |
e748 | CATS | General | N/A | Run 1035 calib cats1 | After experiment CATS 1 pulser calibration
Pulser Quality: very bad - to be analyzed
with care
|
|
Fixed | e748 |
Thu Jul 20 11:09:34 2017 |
e748 | CATS | General | N/A | Run 1036 calib cats 2 Y | After experiment pulser calibration CATS 2
(Y)
1st amplitude slightly saturates CATS 2 X.
|
|
Pinned | e744 |
Thu Mar 15 10:50:00 2018 |
Adrien Matta | MUST2 | Hardware | | Distribution box LPC | Cabling file by Fabien Naury (LPC). |
8x |
Pinned | e744 |
Mon Mar 26 11:44:27 2018 |
e744 : Valerian | OTHER | General | | Current Elog state | Currently we do not have access to the experiment
number. To write an entry for e744 the nickname
TEST will be used. |
|
Fixed | e744 |
Mon Mar 26 11:46:43 2018 |
e744 : Valerian | RUN | General | 3-alpha | Tests runs Ganacq log | (15:51:33 - 19/03/2018) INFO - rcc_gui - Started
run #1
|
|
Fixed | e744 |
Mon Mar 26 14:20:22 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Bidimensional graphs for Telescope 7 and 6 | WARNING T5 == T7
[U][B]
EDIT 27/03/18 : WARNING X and Y are inverted, |
 |
Ongoing | e744 |
Mon Mar 26 15:07:06 2018 |
e744 : Valerian et Louis | MUST2 | Hardware | 3-alpha | Energy vs Strip for T6 et T7 | Weird signal on StripX of T6... might be the
copper oxyde projections making a short-circuit
|
  |
Ongoing | TEST |
Tue Mar 27 10:47:39 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Choice of DSSSDs | |
|
Ongoing | e744 |
Tue Mar 27 11:11:04 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Choice of DSSSDs | Different plots of Strip channel vs Strip
number for X and Y in order to make our choice |
14x |
Fixed | e744 |
Tue Mar 27 16:26:29 2018 |
e744 : Valerian | MUST2 | General | 3-alpha | Bidim for T1 T3 T4 T5 T6 T7 T8 | |
7x |
Ongoing | e744 |
Tue Mar 27 17:22:24 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Choosing the DSSSDs | We can see that the DSSSDs on T1(CsI) T3(CsI)
T4(CsI) and T5(SiLi) are in good shape (cf
:[URL=https://elog.lpc-caen.in2p3.fr/MUST2/333]Bidim |
|
Ongoing | e744 |
Wed Mar 28 13:21:32 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Choosing the DSSSDs | [quote="e744 : Valerian"]We can see that the
DSSSDs on T1(CsI) T3(CsI) T4(CsI) and T5(SiLi)
are in good shape (cf :[URL=https://elog.lpc-caen.in2p3.fr/MUST2/333]Bidim |
|
Ongoing | e744 |
Wed Mar 28 16:35:01 2018 |
e744 : Valerian | MUST2 | Hardware | 3-alpha | Choosing the DSSSDs | [quote="e744 : Valerian"][quote="e744 : Valerian"]We
can see that the DSSSDs on T1(CsI) T3(CsI)
T4(CsI) and T5(SiLi) are in good shape (cf |
  |
Fixed | e744 |
Tue Apr 3 10:44:38 2018 |
e744 : Valérian | MUST2 | Hardware | | Update on Must2 telescopes | For the next day, the plan is to check the
DSSD's connections of T6 & T7 followed by
an alpha run, if the problem seen on T6 are |
|
Ongoing | e744 |
Tue Apr 3 15:30:49 2018 |
e744 : Valérian | MUST2 | Hardware | | Cabling of T6 & T7 | After checking the cable of T6 & T7 it seems
that there were in fact an inversion during
experiment e748. T6 is the bottom one, and |
|
Ongoing | e744 |
Wed Apr 4 17:49:05 2018 |
e744 : Valérian | EXL-PPT | Hardware | | Update on EXL | The EXL detector has been mounted, it is very
close to the target ~4cm and doesn't do any
shadow on the M2 telescopes. But it isn't |
6x |
Fixed | e744 |
Tue Apr 10 17:43:28 2018 |
Adrien Matta and FyFy | MUST2 | Hardware | N/A | login to CAEN SY1527 HV/BT mainframe | To control the CAEN SY1527 HV/BT mainframe
use the following command from a terminal:
|
|
Fixed | e744 |
Tue Apr 17 09:07:55 2018 |
Adrien Matta | DAQ | General | N/A | DAQ issue summary | Previously on e744:
After a chat with Charles Houarner we decided |
|
Fixed | e744 |
Tue Apr 17 09:18:00 2018 |
Cherry MX team | MUST2 | Hardware | N/A | T5 is back and running strong | T5 telescope appears to be fully functional
again. It shows both Energy and Time with
excellent resolution. |
|
Ongoing | e744 |
Tue Apr 17 17:36:37 2018 |
Cherry Mx Team | MUST2 | Software | N/A | GRU SUCKS | Pretty much today's summary in the title.
[URL=https://i.pinimg.com/originals/a8/d4/12/a8d41206e8bd9c189397fb4907656981.jpg]https://i.pinimg.com/originals/a8/d4/12/a8d41206e8bd9c189397fb4907656981.jpg[/URL] |
|
Fixed | e744 |
Mon Apr 23 11:33:53 2018 |
e744 Valerian | OTHER | Hardware | N/A | Inspection signals | Inspection signals between D6 and LISE Acquisition
room are connected as follow :
|
|
Pending | e744 |
Tue Apr 24 14:18:22 2018 |
Valerian Freddy and Adrien aka Cherry Mx Team | MUST2 | Hardware | N/A | Current telescope-pcb layout | Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
|
|
Fixed | e744 |
Tue Apr 24 15:42:03 2018 |
e744 Valérie L. | DAQ | General | | GMT chronogramme | Crate ganlx1 GMT master FAG 100ns ; VAL 2
µs ; CT 6 µs
Crate ganlx14 GMT slave FAG 100ns ; VAL 2 |
 |
Fixed | e744 |
Tue Apr 24 15:51:04 2018 |
e744 Valérie L. | MUST2 | General | | MUST2 configuration /parameters |
TAC range for all telescopes: 600ns
Thresholds: 402 keV |
|
Fixed | e744 |
Tue Apr 24 16:22:08 2018 |
e744 Valérie L. | RUN | Software | | Narval Merger Parameters | |
|
Fixed | e744 |
Wed Apr 25 15:59:51 2018 |
Valérian | EXL-PPT | Software | N/A | Mesytech setup | To use the remote settings of the Mesytech
modules :
[CODE]
|
|
Fixed | e744 |
Wed Apr 25 20:47:59 2018 |
e744 Valérie | MUST2 | General | | MUST2 mate Temperature on the DAS interface | tests
The plot:ConfigDASMuvi1Tel4mufeeX.png shows
the situation on the Mufee card when the |
 |
Ongoing | e744 |
Thu Apr 26 19:37:24 2018 |
Valerian and Freddy | MUST2 | Hardware | N/A | Debug of Must2 telescopes | Today we found different problems, no time
on T4 and no signal on T5 and T6 CsI tripping.
After changing cables and a lot of tests |
 |
Ongoing | e744 |
Sat Apr 28 10:17:22 2018 |
Valerian and Iulian | MUST2 | Hardware | 3-alpha | Status of MUST2 telescopes 27/04/18 | Yesterday night we tested T1, T2, T3, T4,
T5, and T6.
|
|
Ongoing | e744 |
Sat Apr 28 13:27:26 2018 |
Valerian and Iulian | MUST2 | Hardware | 3-alpha | multiples runs with two alpha source on T1 T2 T3 T4 and T5 | For the following runs we will use two 3 alpha
sources :
|
|
Ongoing | e744 |
Sat Apr 28 13:36:52 2018 |
Valerian and Iulian | OTHER | Software | N/A | Problem with DAS configuration | There is an issue with the GMT slave. When
you click Online and then apply write hardware,
if the message : [U]register error on GMTSlave[/U] |
|
Pending | |
Sat Apr 28 21:12:55 2018 |
iulian | MUST2 | General | 3-alpha | Run 182 end ; problem with cooling | RUN 182 start @13h
Stoped @ 21H
|
|
Fixed | e744 |
Sun Apr 29 20:37:58 2018 |
Francois | CATS | General | | Chronogram | |
|
Fixed | e744 |
Mon Apr 30 20:38:21 2018 |
iulian | RUN | General | 3-alpha | 6run 186 3a source 60 co source | [U][B]run #186[/B][/U]
start@11h 30/04
|
|
Fixed | e744 |
Mon Apr 30 20:42:34 2018 |
iulian | RUN | General | 60Co | run 188 60 co source | [U][B]run #188[/B][/U] [I]60co source EXL+PPT
trigger[/I]
|
|
Fixed | e744 |
Tue May 1 10:47:41 2018 |
iulian & valerian | RUN | General | 60Co | run 189 60 Co source | [U][B]run #189[/B][/U] [I]60co source EXL+PPT
trigger[/I]
Changed the way of codding PPT. for this |
|
Fixed | e744 |
Wed May 2 18:11:59 2018 |
Iulian Marlenne Louis | RUN | General | 3-alpha | 3 alpha test | Run191 start 18h stop 18h10
Run ok, saved config DAS with good polarity
on the thresholds CSI & piedestal allignement |
|
Ongoing | e744 |
Thu May 3 08:50:17 2018 |
François | VACUUM | General | | stop vacuum | turbo pumps stopped at 8H45
problem with the cooling system of the M2C |
|
Fixed | e744 |
Thu May 3 15:04:03 2018 |
Iulian Marlenne | MUST2 | Hardware | N/A | X and Y possitions on the detector | Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
|
|
Fixed | e744 |
Thu May 3 15:20:16 2018 |
Iulian Marlenne | MUST2 | Hardware | N/A | X and Y possitions on the detector | Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
|
|
Ongoing | e744 |
Thu May 3 19:11:14 2018 |
Valerian Marlene and Francois | MUST2 | General | 3-alpha | run 3 alpha T5 | [U][B]run #196[/B][/U]
3 alpha source and pedestals supressed
Trigger T5 only |
|
Fixed | e744 |
Fri May 4 11:20:50 2018 |
Valerian | MUST2 | General | 3-alpha | T5 : 0° telescope | After increasing the voltage on T5 DSSD from
80V to 100V the resolution increased from
~40keV sigma to 20keV sigma.
|
 |
Fixed | e744 |
Fri May 4 23:58:07 2018 |
iulian | RUN | General | 3-alpha | Run #203 alfa source & 60co source | [U][B]run #203[/B][/U]
alpha source & 60co source
|
   |
Ongoing | e744 |
Sat May 5 11:14:33 2018 |
Iulian & Valerian | RUN | General | 3-alpha | run #204 alpha source | [U][B]run #204[/B][/U]
alpha source
start @11h15 05/05
|
    |
Fixed | e744 |
Sun May 6 17:52:21 2018 |
Valerian | RUN | General | 3-alpha | Run #205 T1 T2 T3 & T4 | [U][B]run #205[/B][/U]
T1 T2 T3 & T4 T5 still in trigger but no
HT/BT
|
|
Ongoing | e744 |
Sun May 6 17:55:05 2018 |
Valerian | OTHER | General | 3-alpha | Update on the cooling system problem | After waiting for 1-2 hours. I started the
BT again on T5 no tripping BT anymore. While
writing hardware with DAS T5 responded well.
|
6x |
Fixed | e744 |
Mon May 7 10:42:58 2018 |
Valerian | OTHER | General | 60Co | Update on the cooling system and run gamma (signal problem on PPT) | Today, both cooling system are working fine
and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 |
   |
Fixed | e744 |
Thu May 10 14:38:41 2018 |
iulian | EXL-PPT | Hardware | N/A | Mesytech settings | Tried unsuccessfully to change the gain on
EXL energies.
Looking at the inspection lines noticed that |
|
Fixed | e744 |
Thu May 10 15:06:44 2018 |
iulian & valerian | EXL-PPT | General | 60Co | Started run #211 & #212 #213 60Co source efficiency run | [U][B]Run #211[/B][/U] BAD Run no BT
60Co source efficiency run EXL & PPT trigger.
Gains and thresholds set
|
 |
Pinned | e744 |
Fri May 11 14:00:48 2018 |
iulian | EXL-PPT | Hardware | N/A | Mesytech settings | [quote="iulian"]Tried unsuccessfully to change
the gain on EXL energies.
Looking at the inspection lines noticed that |
|
Fixed | e744 |
Sat May 12 08:54:42 2018 |
iulian | MUST2 | General | 3-alpha | Run #114 T1-T5 trigger 3alpha source calib run | [U][B]Run #214[/B][/U]
Trigger T1-T5 & gamma
3 alpha run
|
 |
Ongoing | e744 |
Sat May 12 20:09:09 2018 |
iulian | MUST2 | General | 3-alpha | Run #115 3 alfa run Calibration T1-T5 trigger | [U][B]Run #215[/B][/U]
Trigger T1-T5
3 alpha run
|
   |
Ongoing | e744 |
Sun May 13 12:09:55 2018 |
iulian | MUST2 | General | 3-alpha | Run #116 3 alfa run Calibration T1-T5 trigger | [U][B]Run #115[/B][/U]
3 alfa run Calibration T1-T5 trigger
start 12h10
|
|
Pending | e744 |
Sun May 13 13:32:44 2018 |
iulian | ONLINE | Software | N/A | start_online ilegal instruction fault | From time to time the start_online code gives
an ilegal instruction error and crash...
Once the ctrl-c pressed it shows:
|
|
Ongoing | e744 |
Sun May 13 19:36:09 2018 |
Valérian + François | MUST2 | General | 3-alpha | Run #116 #117 3 alpha run Calibration T1-T5 trigger | [U][B]run #116[/B][/U]
start @12h07 13/05/18
stop @19h45 13/05/18
|
 |
Fixed | e748 |
Mon May 14 10:49:47 2018 |
François | DAQ | Software | | TDC problem | Problem :
TDC labels are 0. After the compilation of
action list the labels seem to appear (if |
|
Ongoing | e744 |
Mon May 14 12:57:44 2018 |
Francois | TARGET | General | | target preparation |
Cibles Georges
|
|
Fixed | e744 |
Mon May 14 13:52:25 2018 |
François | BEAM | General | | Profileur |
|
|
Ongoing | e744 |
Tue May 15 09:58:52 2018 |
Valérian | RUN | General | 3-alpha | run #118 3 alpha | [U][B]run #118[/B][/U]
Trigger T1 T2 T3 T4 & T5
EXL + BT not biased but still in trigger
|
|
Fixed | e744 |
Tue May 15 19:42:40 2018 |
Valérian | EXL-PPT | General | 60Co | Calibration of EXL from e748 data | The EXL calibration program is ready. Join
is the result with previous data from e748. |
|
Ongoing | e744 |
Tue May 15 21:32:46 2018 |
Iulian Valerian | EXL-PPT | General | 60Co | run #300 60 Co source EXL & PPT trigger | [U][B]Run #300[/B][/U]
PPT EXL trigger 60Co
|
|
Ongoing | e744 |
Wed May 16 09:49:26 2018 |
Francois & Ruxandra & Armel | BEAM | Hardware | | E1D6 and E2D6 detectors | After struggling with the noise, we achieved
~ 50 keV resolution.
|
|
Fixed | e744 |
Wed May 16 11:30:21 2018 |
iulian | EXL-PPT | General | 60Co | run 302 60Co source | [U][B]Run #302[/B][/U]
60 Co source PPT & EXL trigger
|
|
Fixed | e744 |
Wed May 16 16:27:29 2018 |
e744, lama, beyhan | OTHER | Hardware | | TACS from LISE to the exp DAQ | The following TACs signals from LISE have
been cabled and send to the experimental
acquisition (->D6)
|
|
Fixed | e744 |
Wed May 16 17:03:18 2018 |
Ruxandra | EXL-PPT | Software | | calibration | Calibration coefficients for the PPT detector
using the 60Co and 40K lines: E=0.5514*ch
- 83.322. Internal radioactivity at 1444 |
|
Fixed | e744 |
Wed May 16 17:14:20 2018 |
e744, lama, beyhan | OTHER | Hardware | | setting of signals from LISE to exp. DAQ | We put the following signals from LISE on
DAQ :
|
|
Fixed | e744 |
Wed May 16 18:01:47 2018 |
Iulian Valerian | MUST2 | Software | N/A | First successful Calimero run on T1 voie X run 316 | First successful Calimero run on T1 voie X
run 316 |
|
Fixed | e744 |
Wed May 16 19:06:39 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #318 Calimero T1-T4 strips X | [U][B]Run #318[/B][/U]
Calimero T1-T4 X |
  |
Fixed | e744 |
Wed May 16 20:26:48 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #319 calimero T1-T4 Y strips | [U][B]run #319[/B][/U]
calimero T1-T4 Y strips |
|
Fixed | e744 |
Wed May 16 20:36:40 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #320 Calimero T5 X | [U][B]run #320[/B][/U]
Calimero T5 X |
|
Fixed | e744 |
Wed May 16 20:42:43 2018 |
Iulian Valerian | MUST2 | Software | N/A | Run #321 Calimero T5 Y strips | [U][B]Run #321[/B][/U]
Calimero T5 Y strips |
|
Ongoing | e744 |
Wed May 16 21:27:55 2018 |
Iulian Valerian | MUST2 | Software | N/A | Run #322 Calimero T1-T4 X strips | Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too |
|
Ongoing | e744 |
Wed May 16 21:45:47 2018 |
iulian | MUST2 | Software | N/A | Run #323 Calimero T1-T4 strips X | [U][B] Run #323[/B][/U]
Calimero T1-T4 strips X |
|
Ongoing | e744 |
Wed May 16 22:03:13 2018 |
iulian | EXL-PPT | Software | 60Co | run #324 60Co | [U][B]run #324[/B][/U]
60Co
|
 |
Pinned | e744 |
Thu May 17 12:04:45 2018 |
iulian | EXL-PPT | Hardware | 60Co | EXL delay of ADC Codding window | EXL timing delays for Mesitech module 2 &
1
|
|
Ongoing | e744 |
Thu May 17 18:29:16 2018 |
iulian | MUST2 | General | 3-alpha | Run #333 Last alfa run before experiment | Run #333
3a source
T1-T5 trigger
|
|
Ongoing | e744 |
Thu May 17 19:15:21 2018 |
Iulian | EXL-PPT | General | 60Co | Run #334 Last 60 co run for eficacity before experiment | [U][B]Run #334[/B][/U]
start 19h15 |
|
Fixed | e744 |
Fri May 18 10:47:37 2018 |
Ruxandra | EXL-PPT | Hardware | 60Co | Co60 caliibration | Thu May 17 . run 339
60Co calibration
start @19h26 17/05/18
|
|
Fixed | e744 |
Fri May 18 13:28:24 2018 |
Ruxandra | EXL-PPT | Software | 60Co | new calibration | The new calibration coefficients for the PPT
detector (run 339): E=0.526*ch+32.57 |
|
Fixed | |
Fri May 18 15:17:19 2018 |
Megumi and Louis | OTHER | Hardware | | TAC range setting and time calibration | 1 mm-cats 1us
2 mm-hf 200ns
3 mm-exl 1us
|
|
Fixed | e744 |
Fri May 18 17:38:21 2018 |
Francois and Pedja | OTHER | Hardware | | translator nim to ecl | There was a problem with the scalers, not
all of them were working. After several tests,
we changed the electronic module, from Lecroy |
|
Ongoing | e744 |
Sat May 19 15:32:51 2018 |
Iulian Valerian | EXL-PPT | General | N/A | Started run #346 Room background PPT EXL | [U][B]run #346[/B][/U]
Room background PPT EXL
|
|
Fixed | e744 |
Sun May 20 18:53:44 2018 |
iulian Jaromir Cristina | EXL-PPT | General | N/A | Run #347 Background run EXL & PPT triggers | [U][B]Run #347[/B][/U]
Background run EXL & PPT triggers
start @18h53 20/05
|
  |
Ongoing | e744 |
Sun May 20 19:11:57 2018 |
ruxandra cristina giuseppe jaromir | EXL-PPT | Hardware | 60Co | EXL-addback and light leak considerations | in the middle of the considerations - pdf
file
|
|
Pinned | e744 |
Mon May 21 11:26:55 2018 |
iulian cristina | OTHER | Hardware | N/A | error stop run/ run still going | After stopping run 347, the narval looks like
everything was stopped (blue ready), but
I still had FAGs, VALs, and the leds on the |
 |
Fixed | e744 |
Mon May 21 11:42:16 2018 |
iulian cristina | MUST2 | Software | N/A | run 348 test comunication with Must. Pulser T1 channel 11 | |
|
Fixed | e744 |
Tue May 22 10:44:30 2018 |
iulian Fairouz Valerie | MUST2 | Software | N/A | Run #353 Calimero T1-T4 strips X | Started run #353
Calimero T1-T4 strips X
Time Calibrator 320 ns ; period 20 ns |
|
Fixed | e744 |
Tue May 22 11:37:50 2018 |
Valérie | MUST2 | Software | N/A | calimero config GECO |
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns |
   |
Fixed | e744 |
Tue May 22 11:59:06 2018 |
Valérie | MUST2 | Software | N/A | Calimero config GECO | |
8x |
Fixed | e744 |
Tue May 22 12:09:27 2018 |
iulian Fairouz Valerie | MUST2 | Software | N/A | Run #354 Calimero T1-T4 strips X | Started run #353
Calimero T1-T4 strips X
Time Calibrator 640 ns ; period 20 ns |
    |
Fixed | e744 |
Tue May 22 12:10:27 2018 |
iulian Fairouz Valerie | MUST2 | Software | N/A | Run #355 Calimero T1-T4 strips Y | Started run #353
Calimero T1-T4 strips Y
Time Calibrator 640 ns ; period 20 ns |
|
Fixed | e744 |
Tue May 22 13:40:03 2018 |
Fairouz Valerie | MUST2 | Software | N/A | Run #356 Calimero T1-T4 strips Y | Run #356
Time Calibrator Calimero stripYT T1to T4
640ns period 20ns |
|
Pinned | e744 |
Tue May 22 18:33:32 2018 |
Nicolas, Adrien | OTHER | Software | | How to run Online and Convert raw data files | [U][B]1. How to run Basic_online or Online
code[/B][/U]
[LIST]
|
|
Fixed | e744 |
Tue May 22 19:36:50 2018 |
Fairouz, Valérie | MUST2 | Software | N/A | Run #359 Calimero T1-T4 strips X | Run #359
amplitude of the gene is now set to 10 MeV
Time Calibrator Calimero stripsX T1to T4 |
8x |
Pending | e744 |
Tue May 22 19:40:26 2018 |
Francois | BEAM | General | | Planning of the experiment | |
|
Fixed | e744 |
Tue May 22 19:40:48 2018 |
Valérie | MUST2 | General | N/A | snapshots for steps in Calimero calibration | |
11x |
Fixed | e744 |
Tue May 22 20:06:15 2018 |
Fairouz, Valerie, edited by Iulian Megumi | MUST2 | Software | N/A | Run #360 Calimero T1-T4 strips Y | Started run #360
calimero stripsYT T1 to T4 640 ns; period
20 ns
|
|
Fixed | e744 |
Tue May 22 21:43:31 2018 |
iulian & megumi | MUST2 | Software | N/A | run 361 | [U][B]run 361[/B][/U]
start 20h38
stop 21h41 |
|
Fixed | e744 |
Tue May 22 21:57:51 2018 |
iulian & megumi | MUST2 | Software | N/A | Run #362 Calimero T1-T4 strips X again with solution | Changed the Thresholds on T4. No longer double
peaks...
I guess there is some noise on the T4 and |
 |
Fixed | e744 |
Tue May 22 22:33:09 2018 |
e744 | MUST2 | Software | N/A | Run #363 Calimero T1-T4 strips X again with threshold at 50% (same as 40%) | [U][B]Run #363[/B][/U]
NB: Thresholds are the ones on the pulser
amplitude to inject the signal (Calimero |
|
Fixed | e744 |
Tue May 22 22:50:47 2018 |
e744 | MUST2 | Software | N/A | Run #365 Calimero strips Y T1-T4 100% Threshold | [U][B]Run #365[/B][/U]
Calimero strips Y T1-T4
100% threshold on T4
|
|
Pinned | e744 |
Tue May 22 23:42:02 2018 |
iulian & megumi | EXL-PPT | Software | N/A | Run #366 NARVAL FATAL ERROR | RUN #366
EXL PPT triggers
Falat error from NARAVL
|
|
Fixed | e744 |
Wed May 23 00:30:34 2018 |
e744 | EXL-PPT | General | N/A | RUN #402, EXL PPT trigger | RUN #402
start exl ppt run for checking coincidence
exl ch 17 put in to adc2 ch 32 |
|
Fixed | e744 |
Wed May 23 10:52:28 2018 |
Valérie | EXL-PPT | General | N/A | RUN #405, EXL PPT trigger | RUN #405
start exl ppt run for checking coincidence
|
   |
Fixed | e744 |
Wed May 23 10:57:13 2018 |
megumi | DAQ | General | | Photo of the circuit | photo of the circuit area |
15x |
Fixed | e744 |
Wed May 23 13:15:47 2018 |
megumi | DAQ | General | N/A | Time calibration for TDC (EXL) | Time calibrator setting
Range 5.12 us
Period 160 ns
|
|
Pinned | e744 |
Wed May 23 15:10:15 2018 |
iulian | OTHER | General | N/A | Procedure to start stop RUNS | |
 |
Fixed | e744 |
Wed May 23 15:40:58 2018 |
Charles Houarner Valérie | MUST2 | Software | N/A | TESTS MUVI internal pulser T1-T4 strips X | To check the signals and trigger on T4 we
used the internal pulser on T4,
from the SYNCHROTEST pulser at 150 Hz.
|
    |
Fixed | e744 |
Wed May 23 15:42:04 2018 |
Louis, Valérie | MUST2 | General | N/A | CALIMERO run 409 - XT - T1 to T4 | Started run #409
GMT triggers: GecoCalimeroMuviGMT.png
HT on cf : HTtelescopesMustsWed23May.png
|
    |
Pinned | e744 |
Wed May 23 17:23:34 2018 |
Freddy | MUST2 | General | | Pedestals and alpha calibration analysis | Calibration coefficients for MUST2 telescopes
were extracted from run_0118 (acquired during
night from 13th to 14th of May). They are |
|
Fixed | e744 |
Wed May 23 18:20:59 2018 |
e744 | MUST2 | General | N/A | Test Calimero Run 425 | Started run #425 Calimero NEW XT T1toT4
ampl Pulser 12MEV; thr for T4 1 MeV
problem on data taking |
|
Ongoing | e744 |
Wed May 23 20:52:01 2018 |
Iulian Valerian | RUN | General | | run #429 and #430 and config gmt | Changed VAL from 2 us to 2.5 us
run #429 exl ppt triggers
|
    |
Fixed | e744 |
Wed May 23 23:37:14 2018 |
Valérie L. | MUST2 | General | N/A | MUVI configuration DAS | Configurations files of the MUVI 1 MufeeX
and Y.
On MufeeX and Y configuration:
|
13x |
Fixed | e744 |
Thu May 24 01:02:19 2018 |
Valerian | OTHER | General | N/A | run #431 | [U][B]run #431[/B][/U]
Trigger LISE
Beam in D4
|
|
Fixed | e744 |
Thu May 24 01:10:30 2018 |
iuliqn | RUN | General | | run 433 Lise trigger | Should be ql foil in front of the si detector.... |
|
Fixed | e744 |
Thu May 24 01:11:26 2018 |
Iulian Valerian | RUN | General | N/A | run 434 Lise trigger | Cats inserted
efficiency is around ~99% |
 |
Fixed | e744 |
Thu May 24 01:53:28 2018 |
iulian | RUN | General | N/A | run 438 Lise trigger | run 438 D4 in
run 439 d6 in.
|
 |
Ongoing | e744 |
Thu May 24 02:30:52 2018 |
iulian | RUN | General | N/A | RUN 440 14N no target trigger Must & cats %100 | RUN 440
14N beam \
no target
|
|
Fixed | e744 |
Thu May 24 03:21:37 2018 |
iulian | OTHER | Hardware | N/A | Position measurements Must2/PPT/EXL | |
|
Fixed | e744 |
Thu May 24 03:57:34 2018 |
iulian | RUN | General | N/A | run 442 Lise trigger d6 | |
|
Fixed | e744 |
Thu May 24 04:20:34 2018 |
iulian | RUN | General | N/A | run 443 T1-t5 triggers | run 443
T1-T5 triggers
|
   |
Pinned | e744 |
Thu May 24 05:44:56 2018 |
iulian | RUN | General | N/A | Important::analysis of the run 443/ things to do | [I][B]No stop on t5, but TAC MM_CATS ok..
So two possibilities:
1) Stop Cable not connected on Muvi2
|
   |
Ongoing | e744 |
Thu May 24 05:59:44 2018 |
iulian | MUST2 | General | N/A | run 444 t1-t4 trigger no target 14n beam | run 444
t1-t4 trigger
no target
|
    |
Ongoing | e744 |
Thu May 24 06:30:27 2018 |
iulian | RUN | General | N/A | run 445 t1-t4 trigger no target 14n beam no CATS | |
  |
Pending | e744 |
Thu May 24 06:53:12 2018 |
e748 | RUN | General | N/A | run #446 CATS trigger | |
|
Fixed | e744 |
Thu May 24 12:01:54 2018 |
Valérie for Calimero team - Valérian, Fairouz | MUST2 | General | | Bug server Calimero Run #447-449 | Calimero on ganp161
Telscopes T1 to T4 thresholds for T1 to T3
400 keV ; T4 : 1 MeV
|
12x |
Fixed | e744 |
Thu May 24 17:18:58 2018 |
Valérie for Calimero team : Valérian, Louis | MUST2 | General | N/A | CALIMERO Tests Runs 451 to 452 (done in D6) | Test runs for telescopes T1 to t4
Nb: The applied threshold is now 1 MeV but
it seems to be not the case when we look |
  |
Fixed | e744 |
Thu May 24 17:23:57 2018 |
Valérie for Calimero team: Valérian, Louis | MUST2 | General | N/A | CALIMERO Runs 453-457 OK | Calimero on ganp1074 in D6
Time Calibrator Range: 640 ns; Period 20
ns Amplitude of pulser (test generator) 9MeV |
16x |
Fixed | e744 |
Thu May 24 19:05:41 2018 |
e744 team (shift Valérie) | RUN | General | N/A | Runs 458 and 459 | Run 458
focalisation on D4 LISE
100Hz on Si Lise triggers: Cats1div (3 10**4) |
  |
Fixed | e744 |
Thu May 24 19:20:40 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | N/A | Run 460-Spiral 14N test | Run 460
Triggers Must2 Telescopes T1 to T5
( MM1 to MM5)
|
  |
Fixed | e744 |
Thu May 24 19:32:31 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | N/A | Run 461-Spiral 14N test | Run 461
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
|
 |
Fixed | e744 |
Thu May 24 19:34:40 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | tuning Wien-Spiral 14N test | Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
|
|
Fixed | e744 |
Thu May 24 20:18:00 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | tuning Wien-Spiral 14N test | Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
|
   |
Fixed | e744 |
Thu May 24 20:19:19 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | Beam centering on MM5-Spiral 14N test | Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
|
  |
Fixed | e744 |
Thu May 24 20:21:57 2018 |
e744 Must2 + Lise teams | RUN | General | N/A | Run 462 Beam centering on MM5-Spiral 14N test | Run 462 focalisation on target 24May at 20h15pm
storage
Triggers Must2 Telescopes T1 to T5
|
   |
Fixed | e744 |
Thu May 24 20:31:30 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | N/A | Run 463 Beam Spiral 14N test | Run 463 focalisation on Must2 24May at 20h30pm
storage
Triggers Must2 Telescopes T1 to T5
|
  |
Fixed | e744 |
Thu May 24 21:05:05 2018 |
Valerian Iulian and Francois | TARGET | Hardware | | 14N - 187um target placement | For resonant elastic scattering of 14N(pp)14N
the 187um target is placed. |
|
Fixed | e744 |
Thu May 24 21:05:19 2018 |
e744 Must2 + Lise teams (edit: Valérie) | MUST2 | Hardware | N/A | change of STOP MUST2 | The STOP of MUST2 with CATS is now directly
the CATS "delayed signal".
No coincidence with FAG.
|
|
Pinned | e744 |
Thu May 24 21:13:29 2018 |
Valerian | TARGET | General | N/A | List of target present in M2C | The list of target present in M2C chamber
are the following :
|
|
Fixed | e744 |
Thu May 24 21:28:45 2018 |
e744 Must2 + Lise teams (edit: Valérie) | RUN | General | CH2 | Run 464 Beam Spiral 14N test | Run 464 focalisation on Must2 24May at 21h25m
storage
Triggers Must2 Telescopes T1 to T5
|
    |
Fixed | e744 |
Thu May 24 22:38:44 2018 |
e744 Must2+lise teams | RUN | General | CH2 | Run Beam Spiral 14N centered | Shift teams: François, Iulan, Freddy, Fairouz,
Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, |
7x |
Fixed | e744 |
Thu May 24 22:45:36 2018 |
e744 Must2+lise teams | RUN | General | CH2 | Run 1001 Beam Spiral 14N centered | Run 1001, cible n°6: 183 um
start @ 21h55; Stop @ 22h36
Shift teams: François, Iulan, Freddy, Fairouz, |
 |
Pinned | e744 |
Thu May 24 23:20:40 2018 |
e744 Must2 + Lise teams | RUN | General | CH2 | run 1002 | [I][B]run 1002:[/B][/I] 14N beam, CH2 187
um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
|
|
Fixed | e744 |
Fri May 25 00:09:03 2018 |
Cristina | RUN | General | CH2 | run 1003 (target no 6 -CH2 180 um) | run 1003
14N
|
6x |
Fixed | e744 |
Fri May 25 00:41:19 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1004 (target no 6 -CH2 180 um) |
Run 1004
the thresholds of MUST detector changed to |
7x |
Fixed | e744 |
Fri May 25 01:05:05 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1005 (target no 6 -CH2 180 um) |
Run 1005
|
   |
Fixed | e744 |
Fri May 25 02:35:13 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1006 (target no 6 -CH2 180 um) |
Run 1006
|
   |
Ongoing | e744 |
Fri May 25 02:57:44 2018 |
Valerian and Iulian | OFFLINE | General | CH2 | Simulation Azure 1H(14N,p) and measurement | We can know conclude without any doubt that
we were able to measure resonances from 1H(14N,p)14N.
The resolution with a rough analysis and |
    |
Pinned | e744 |
Fri May 25 04:02:29 2018 |
Valerian Iulian Pedja and Cristina | OTHER | General | N/A | General power cut of ganil | Due to some water leaks, CSS1 CSS2 and CIME
as the vacuum system of GANIL are down...
Time loss could be considerable... They talked |
|
Fixed | e744 |
Fri May 25 08:37:04 2018 |
Adrien Matta | MUST2 | Hardware | N/A | MUST2 cooling | Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both
coolers at -5C.
|
|
Pending | e744 |
Fri May 25 13:08:44 2018 |
e748 | OTHER | Software | N/A | CSH is broken | Someone change the .cshrc file this morning
this morning at 11h30. None of the alias
worked anymore. |
|
Pinned | e744 |
Fri May 25 14:10:34 2018 |
Freddy, Louis, Lama | OFFLINE | General | | MM - dE_TOF diagnostic with/without CsI_E | Attached are some plot of dE-TOF PID for run
1004 after the threshold change ( 1 MeV -->
500 keV).
|
 |
Ongoing | e744 |
Fri May 25 15:10:23 2018 |
François | CATS | Hardware | | delay on CATS | CATS delay 500 ns was changed to 300 ns, in
order to get the stop signal on MUST2 TAC
well within the range of the TAC. |
|
Ongoing | e744 |
Fri May 25 15:19:38 2018 |
Cristina | OFFLINE | General | | isomers present in the 14N runs |
Attached are some pictures of the energy_vs_time
spectra for EXL and PPT detectors recorded |
 |
Fixed | e744 |
Fri May 25 15:29:51 2018 |
François | OTHER | Hardware | | tac FAG_HF | A delay of 500 ns was put to the start signal
= FAG of the FAG_HF_validated TAC
and a range of 500 ns selected |
|
Fixed | e744 |
Fri May 25 15:41:50 2018 |
e744- Valérie | DAQ | General | N/A | DAS configurations for E744-Summary | List of the saved files of the DAS configuration
used on May-24h and May-25th:
[Note that:
|
11x |
Ongoing | e744 |
Fri May 25 16:49:53 2018 |
e748 | MUST2 | General | CH2 | Raw dE-TOF bidim for the 5 telescopes zith the 14N beam | Pedestal seems not to be aligned for T4 |
|
Fixed | e744 |
Fri May 25 17:42:21 2018 |
shumpei | MUST2 | Software | N/A | CsI energy calibration for MUST2 telescopes | Calibration parameter for MUST2 CsI crystals
are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all |
6x |
Fixed | e744 |
Fri May 25 17:51:45 2018 |
e744 Iulan Valérie | RUN | General | CH2 | Run 1008 starting runs with 14N | [U][B]BAD RUN FOR 14N[/B][/U]
Run 1008 BAD RUN 0 Events
|
  |
Fixed | e744 |
Fri May 25 18:15:41 2018 |
Pierre | MUST2 | General | CD2 | new dEE PID using Shumpei calibration | |
|
Fixed | e744 |
Fri May 25 21:34:19 2018 |
e744 Iulan, Fairouz, Valerie | DAQ | Hardware | CH2 | Problem of FAG validation +change of ADC parameter for TAC signal | The Time signal MM_PPT is now in the parameter
MCP_HF of the ADC.
The problem was on the FAG signal validation |
|
Fixed | e744 |
Fri May 25 21:37:45 2018 |
iulian nicolas valérie | RUN | General | N/A | run 1012 all triggers 14O beam in D4 | |
 |
Fixed | e744 |
Fri May 25 22:03:12 2018 |
e744 Must2+LISE teams | RUN | General | CH2 | RUNS 2000, 2001 | Beam 14O
Run 2000 start with all triggers, including
LISE trigger, during 1 minute for tests.
|
6x |
Fixed | e744 |
Fri May 25 22:46:26 2018 |
e744 Must2+LISE teams, edit Valérie | RUN | General | CH2 | RUN 2004 |
Run 2004 Date : 25/05/2018 22:45:58 25/05/2018
23:17:39
|
6x |
Ongoing | e744 |
Fri May 25 23:15:57 2018 |
Valerian | OFFLINE | General | CH2 | Oxygen 15 excitation function | After a quick analysis, we can conclude that
MUST2 is working for resonant elastic scattering.
We find a resolution of 125 keV which will |
|
Fixed | e744 |
Fri May 25 23:26:23 2018 |
e744 Must2+LISE teams, edit Valérie | RUN | General | CH2 | START NARVAL, new version | the NARVAL version is now reinstalled by Fred
Saillant.
see plot ResolProblemNarvalEndofRun25may23h.png
|
|
Fixed | e744 |
Fri May 25 23:33:27 2018 |
iulian | OTHER | Hardware | CH2 | changes after run 2004 | Target was changed to target number 5 (CH2
100 um GOODFELLOW)
The T_EXL1718 ok
|
|
Fixed | e744 |
Sat May 26 00:24:50 2018 |
e744 valérie | DAQ | General | CH2 | change of trigger and division | TRIGGER entry for CATS, presently IN8, seems
to be not running. We put it on IN7(Gatconf
=64).
|
|
Fixed | e744 |
Sat May 26 00:38:38 2018 |
e744 all night shift teams, (edit) Valérie | RUN | General | CH2 | Run 2010 | RUN 2010
Date : 26/05/2018 00:37:44
Target n°5 CH2 100 µm
|
20x |
Fixed | e744 |
Sat May 26 01:41:19 2018 |
e744 night shift team, edit valérie | DAQ | General | CH2 | summary GMT, DAS config since run2005 | Triggers: all except LISE
IN1 to IN5 : MM1 to MM5;
|
   |
Fixed | e744 |
Sat May 26 02:39:18 2018 |
Mihai, Pedja | RUN | General | CH2 | Run 2011, Target n°5 | RUN 2011
Date : 26/05/2018
Beam used: 14O
|
9x |
Ongoing | e744 |
Sat May 26 03:23:46 2018 |
Valerian | OFFLINE | General | CH2 | 15O excitation function as a function of ThetaLab | |
|
Fixed | e744 |
Sat May 26 04:24:16 2018 |
Mihai, Pedja | RUN | General | CH2 | Run 2012, Target n°5 | RUN 2012
Date : 26/05/2018
Beam used: 14O
|
|
Ongoing | e744 |
Sat May 26 05:02:42 2018 |
Valerian | TARGET | General | CH2 | Problem with the target for run 2004 and 2010 | The target seems identical between the two
runs... We will have to investigate to understand
what is going on.
|
 |
Fixed | e744 |
Sat May 26 05:16:12 2018 |
Iulian Valerian, pedja, mihai | TARGET | General | CH2 | Target change | Target No 4 is placed in-beam 5h15. |
|
Fixed | e744 |
Sat May 26 05:23:12 2018 |
Mihai, Pedja | RUN | General | CH2 | Run 2013, Target n°4 | RUN 2013
Date : 26/05/2018
Beam used: 14O
|
 |
Fixed | e744 |
Sat May 26 05:51:00 2018 |
Mihai, Pedja | RUN | General | CH2 | Run 2014, Target n°4 | [U][B]RUN 2014[/B][/U]
Date : 26/05/2018
Beam used: 14O
|
9x |
Fixed | e744 |
Sat May 26 06:05:13 2018 |
Iulian Valerian Pedjia | TARGET | General | CH2 | Target issue No5 | In the attached figure it could be seen that
with the target No5 (run 2010) lower energy
resonances were visible (lower part of the |
|
Ongoing | e744 |
Sat May 26 07:03:12 2018 |
Valerian and Iulian and Francois | OFFLINE | General | CH2 | First picture for 15F from runs 2010-2013 | Target -> Thick target (Sandwich target ??)
The predictions are different....
|
 |
| |
Sat May 26 07:20:03 2018 |
| | | | | |
|
Ongoing | e744 |
Sat May 26 07:32:17 2018 |
Valerian, pedja, mihai | RUN | General | CH2 | Run 2015 after vacuum problem of Css1 target 4 | [U][B]Run 2015[/B][/U]
26/05/18
start @7h29
|
|
Fixed | e744 |
Sat May 26 09:33:48 2018 |
Giuseppe, Dieter | RUN | General | CH2 | run 2015 | Missing strips:
x
MM1 1
|
  |
Fixed | e744 |
Sat May 26 10:03:37 2018 |
Giuseppe, Dieter | RUN | General | | run 2016& 2017 |
Problems with the ACQ (merger), they were |
|
Ongoing | e744 |
Sat May 26 10:06:06 2018 |
Giuseppe, Dieter | RUN | General | CH2 | Run 2018 | Run 2018
Start @ 09:56 26/05/2018
Stop @ 10:51 |
  |
Fixed | e744 |
Sat May 26 11:19:37 2018 |
Giuseppe, Dieter | RUN | General | CH2 | interruption due to to waterleak ibn CSS1 | 10:50 h Water leak at CSS1
cryo pumps have to be regenerated
continuation until the expert intervention |
|
Fixed | e744 |
Sat May 26 11:42:03 2018 |
Giuseppe, Dieter | RUN | General | CH2 | run 2019 | Run 2019
|
 |
Pending | e744 |
Sat May 26 13:22:08 2018 |
Francois | BEAM | General | | problem with CSS1 | There is a leakage of water in cavity north
of cyclotron CSS1. I discussed with Alain
Savale.
|
|
Fixed | e744 |
Sat May 26 14:03:27 2018 |
Giuseppe, Dieter, J. Eric | RUN | General | CH2 | Run 2020 | run 2020
|
9x |
Fixed | e744 |
Sat May 26 16:31:53 2018 |
Jaromir, Giuseppe | EXL-PPT | Software | N/A | EXL calibration, light leak | Selector.C can be used to adjust energy bad
reconstruction in the EXL detectors due to
energy leak (see the PDF attached for more |
    |
Ongoing | e744 |
Sat May 26 20:20:55 2018 |
Valerian | OFFLINE | General | CH2 | 15F observations for target 4 (100um) | Analysis offline permits us to conclude that
the current target has the good size to observe
our resonances. |
  |
Ongoing | e744 |
Sat May 26 20:23:52 2018 |
Cristina Iulian | OFFLINE | General | | PPT gamma spectrum | Attached is the gamma spectrum from PPT detector
with a condition on prompt (T_MM_PPT), proton
detected in MUST and multiplicity event equal |
|
Pending | e744 |
Sun May 27 15:36:31 2018 |
François | BEAM | Social | | News updated | 19H
They succeeded to get 90 % transmission with
CSS1 but the energy at the exit was changed |
|
Fixed | e744 |
Sun May 27 20:47:02 2018 |
e744- Valérie | DAQ | Hardware | N/A | Info to reboot the crates in case of problem | In case of problems in the run control, if
it is not possible to reinstall the crates
in the "Ready" mode status,
|
 |
Ongoing | e744 |
Mon May 28 02:07:41 2018 |
Valerian | OFFLINE | General | CH2 | New improved resolution for 14N et 15F | After correcting position for the Must2 detectors
by taking into account the real hit position
on the target that was (0,15cm,0) and not |
 |
Fixed | e744 |
Mon May 28 11:00:07 2018 |
Valerian and Iulian and Phil | RUN | General | | two protons | |
|
Fixed | e744 |
Mon May 28 12:22:42 2018 |
Francois & Marlete | OFFLINE | General | | superposition exp / theory for 15O and 15F | |
 |
Pending | e744 |
Mon May 28 16:14:29 2018 |
François & Valérie | MUST2 | General | N/A | Cooling system | Monday 28th 16h10: we refill the cooling
system for MUST2. The level should be ok
for the rest of the experiment.
|
|
Fixed | e744 |
Mon May 28 16:32:38 2018 |
E744- Valérie | DAQ | General | N/A | DAS configuration files-References | |
15x |
Fixed | e744 |
Mon May 28 18:27:45 2018 |
E744- Valérie | DAQ | General | N/A | High Voltages and intensities on MUST2 | Check regularly the HT on the MUST2.
NB: without beam the current on Telescope
4 is high, between 9 and 11 µA. see snapshot.
|
|
Ongoing | e744 |
Mon May 28 20:28:50 2018 |
Valerian and Simon | OFFLINE | General | CH2 | Explanation for the 0 degree low energy proton | The 0 degree energy proton are coming from
the beam hitting the aluminum target. If
you do a cut on the beam projection on T5 |
|
Fixed | e744 |
Mon May 28 20:33:39 2018 |
E744- evening shift LISE+e744 teams (edit Iulan, Valérie) | RUN | General | CH2 | BEAM AGAIN RUN 2100 Tuning | See plot of the Must2 impacts, Wien filter
set at +/-0.8kV
Beam on CATS 1.2 10**5 pps
|
|
Fixed | e744 |
Mon May 28 20:38:21 2018 |
E744- evening shift LISE+MUST2 teams (edit Valérie) | RUN | General | CH2 | RUN 2101 DATA target 4 | [U][B]run #2101[/B][/U]
start @20h27
stop @22h20
|
12x |
Fixed | e744 |
Mon May 28 22:11:52 2018 |
e748- Louis | EXL-PPT | Hardware | CH2 | EXL4 trigger excess | During run 2101, Frequency of the EXL4 channel
at 478Hz compared to values around 30Hz for
other channels |
|
Fixed | e744 |
Mon May 28 22:27:14 2018 |
Simon et Louis | RUN | General | CH2 | RUN 2102 DATA target 4 | run #2102
start @22h20
stop @23h30
|
 |
Ongoing | e744 |
Mon May 28 23:14:26 2018 |
Valerian and Iulian and Phil | OFFLINE | General | CH2 | New hint of the 5/2- resonance | We see a new hint of a resonance |
|
Fixed | e744 |
Mon May 28 23:52:19 2018 |
Simon and Louis (start), Franck (stop) | RUN | General | Carbon | RUN 2103 DATA target 1 Carbon | run #2103
start @23h49
stop @1h51
|
 |
Ongoing | e744 |
Tue May 29 00:17:18 2018 |
Night shifter | BEAM | General | Carbon | Beam intensity variation | Beam shut down at 00h03. Increase the intensity
progressively up to now 00h18.
At 0:28: primary intensity dropped down to |
|
Fixed | e744 |
Tue May 29 01:08:22 2018 |
e748 | BEAM | General | Carbon | Beam intensity | At 0:46 primary beam intensity reaches 5 uA
-> 1.5e5 pps on CATS. |
|
Ongoing | e744 |
Tue May 29 01:25:07 2018 |
Phil, Valerian, Franck | EXL-PPT | General | N/A | LaBr3 Background for reference | For reference, we include a picture of the
LaBr3 background found by some random Google
searching until we found a nice happy looking |
|
Ongoing | e744 |
Tue May 29 01:33:58 2018 |
Phil, Valerian, Franck | EXL-PPT | General | | Gamma-ray spectra from PPT | Attached are plots of gamma-ray energy spectra
from PPT.
|
  |
Fixed | e744 |
Tue May 29 02:01:58 2018 |
Franck, Valerian, Phil | RUN | General | Carbon | Run 2104 - Target 1 Carbon | Run 2104
Beam: 14O
Start @ 2:00 29 May 2018
|
 |
Fixed | e744 |
Tue May 29 02:38:21 2018 |
Franck, Valerian, Phil | ONLINE | General | Carbon | Spectra and HV Start Run 2104 | |
11x |
Fixed | e744 |
Tue May 29 04:08:52 2018 |
Franck, Valerian, Phil | RUN | General | Carbon | Run 2105 - Target 1 Carbon | Run 2105
Beam 14O
|
 |
Ongoing | e744 |
Tue May 29 05:07:33 2018 |
Valerian | OFFLINE | General | CH2 | Fusion evaporation background and physics data | Comparison between the fusion evaporation
background and the data for the telescope
5 ~0degree angles and rough subtraction of |
 |
Ongoing | e744 |
Tue May 29 05:24:34 2018 |
Valerian | EXL-PPT | General | CH2 | Comparison of background and physics data for gamma ray detectors | Gamma ray spectrum for both targets seem extremely
close. Subtraction is then made but no gamma
show. More statistic is needed |
 |
Ongoing | e744 |
Tue May 29 06:09:58 2018 |
Franck, Phil | RUN | General | Carbon | Run 2106 - Target 1 Carbon | Run 2106
Beam 14O (CATS: 1.4e5 pps)
|
 |
Ongoing | e744 |
Tue May 29 07:39:53 2018 |
Franck, Phil | RUN | General | Carbon | Run 2107 - Restart after Reboot of VXI - Same problem | Low FAG rate: 30 /s
Low ORD rates: 0-10 /s, 15 /s on MM5 |
|
Ongoing | e744 |
Tue May 29 08:09:02 2018 |
e748 | RUN | General | Carbon | RUN 2108 - Target1 Carbon | [B][U]Run 2019[/U][/B]
Acq recovered
|
11x |
Ongoing | e744 |
Tue May 29 08:59:18 2018 |
Freddy, Iulian, Pierre | RUN | General | CH2 | Run 2109 - Target 4 CH2 - Tuning run | [U][B]Run 2109[/B][/U]
Beam: 14O (1.5*10^5 pps)
|
|
Pinned | e744 |
Tue May 29 09:30:42 2018 |
Freddy, Iulian, Pierre | RUN | General | CH2 | Run 2110 - Target 4 CH2 | Run 2110
Beam: 14O (1.5*10^5 pps)
|
 |
Pinned | e744 |
Tue May 29 09:54:01 2018 |
Freddy, Iulian, Pierre | RUN | General | CH2 | Run 2111 - Target 4 CH2 | Run 2111
Beam: 14O (1.5*10^5 pps)
|
8x |
Fixed | e744 |
Tue May 29 10:42:00 2018 |
Francois | BEAM | General | | effective beam time | In total, there were:
1.4 UT of 14O, average 2x10^5 pps
|
|
Fixed | e744 |
Tue May 29 12:06:05 2018 |
iulian maurycy | OFFLINE | General | CH2 | Carbon substraction | The scale factor for Carbon subtraction is
1.224. This means: RealCountsHidrogen=Counts
CH2 - 1.224 * CountsCarbon
|
|
Ongoing | e744 |
Tue May 29 15:53:17 2018 |
Iulian Maurycy | OFFLINE | General | CH2 | Angular distribution per telescope 1-4 | Angular distribution per telescope 1-4 |
|
Ongoing | e744 |
Tue May 29 16:23:56 2018 |
Valerian Iulian Maurycy | OFFLINE | General | CH2 | Hint of a 2p peaks | |
|
Fixed | e744 |
Tue May 29 17:14:41 2018 |
François, Freddy, Valérie | BEAM | General | | Beam back in D6 | At 17pm Tuesday 29th we have beam coming back
in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is |
 |
Ongoing | e744 |
Tue May 29 18:49:21 2018 |
Valerian | OFFLINE | General | CH2 | Comparison of gamma prompt spectrum for EXL and PPT | Quick note, there is less data seen in EXL
prompt. This should be investigated |
 |
Fixed | e744 |
Tue May 29 19:03:38 2018 |
Valérie (edit) | RUN | General | CH2 | Run #2112 BEAM BACK | run #2112
Beam back given by the machine.
Beam+ Lise team: Omar K and Pierre Delahaye, |
14x |
Fixed | e744 |
Tue May 29 21:41:55 2018 |
Valérie | RUN | General | CH2 | Run #2113 | [B]RUN #2113 start @ 21h37; stop 0h14 @ [/B]
target n°4. CH2 104 µm
|
9x |
Fixed | e744 |
Wed May 30 00:17:02 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2114 | [B]RUN #2114 30 mai 2018 start @ 0h15; stop
@ 2h58[/B]
BEAM STOP DUE to the shut down of the deviation |
8x |
Fixed | e744 |
Wed May 30 01:15:58 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2115 | [B]Since 2h58 : WAITING FOR THE BEAM TO START
THE RUN[/B]
|
6x |
Ongoing | e744 |
Wed May 30 01:30:34 2018 |
Valerian | OFFLINE | General | CH2 | Checking the T4 | After checking every telescope, it seems that
the calibration of T4 is very off, I think
that for now, it might be a good thing to |
|
Ongoing | e744 |
Wed May 30 03:09:09 2018 |
Valérie, Louis | RUN | General | CH2 | BEAM LINE PROBLEMS, alarm "water leakage" | The beam was stopped at 4h56, due to the
alarm of "water leakage" on equipments, indicated
in the D6 area.
|
|
Fixed | e744 |
Wed May 30 07:06:58 2018 |
François, Louis, Valérie | RUN | General | CH2 | Run 2116 | Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69.
STOP at 8h33 (beam rate decreasing at the |
  |
Fixed | e744 |
Wed May 30 08:34:51 2018 |
Valérie | RUN | General | CH2 | Run 2117- low or no beam | Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45:
BEAM STOP.
|
|
Ongoing | e744 |
Wed May 30 09:24:28 2018 |
Valérie, Adrien, Freddy | RUN | General | CH2 | Run 2118 | Wednesday 30th May.
Run 2118 started at 9h23 ;
Stop at: 11h25
|
    |
Ongoing | e744 |
Wed May 30 11:17:00 2018 |
Valerian maurycy and Olivier | OFFLINE | General | CH2 | Condition on time T5 | One should add the condition Si_TX < 150 for
T5, problem from Ta? |
|
Ongoing | e744 |
Wed May 30 11:22:16 2018 |
Valerian maurycy and Olivier | OFFLINE | General | CH2 | Checking the cuts | cut_DeE :
- T1 OK
|
|
Fixed | e744 |
Wed May 30 11:42:41 2018 |
Freddy, Adrien | RUN | General | CH2 | Run 2119 - Target 4 CH2 | [U][B]Run 2119[/B][/U]
Start: 11h25m53s
|
    |
Fixed | e744 |
Wed May 30 13:25:57 2018 |
Phil, Freddy | RUN | General | CH2 | Run 2020 - target number 4 | Run 2020
Start: 13h24m
|
 |
Ongoing | e744 |
Wed May 30 13:48:02 2018 |
Phil | DAQ | General | N/A | Pulser values | Here's a list of pulser values taken from
the last few runs as a reference for what
rate the "100-Hz" pulser is actually seeing.
|
|
Pending | e744 |
Wed May 30 15:26:40 2018 |
Francois Marlete | BEAM | General | | problem with beam | 14H00 : The primary beam was misaligned, they
are still working on it. No 14O beam. |
|
Ongoing | e744 |
Thu May 31 16:42:30 2018 |
iulian | EXL-PPT | General | 60Co | Run 3000 60Co source PPT & EXL triggers | Run 3000
60Co source
PPT & EXL triggers
|
   |
Ongoing | e744 |
Thu May 31 17:45:21 2018 |
iulian | MUST2 | General | 3-alpha | run #3001 alpha source T1-T5 | run #3001
alpha source T1-T5 |
 |
Fixed | |
Fri Jun 1 11:11:13 2018 |
e748 | EXL-PPT | General | 60Co | run #3002 ppt trigger | run #3002 ppt trigger
start 11h11 |
|
Fixed | e744 |
Fri Jun 1 12:06:47 2018 |
Valerian | EXL-PPT | General | 60Co | run #3002 Calib PPT | run #3002
start @11h09
stop @12h04 |
 |
Fixed | e744 |
Fri Jun 1 13:12:16 2018 |
Valérian | EXL-PPT | General | 60Co | run #3003 Calib EXL | run #3003
start @12h06
stop @13h08 |
 |
Fixed | e744 |
Fri Jun 1 19:19:20 2018 |
Valerian | MUST2 | General | N/A | Calimero end | For the end of e744 the calimero runs are
the following ones :
|
|
Fixed | e744 |
Fri Jun 1 19:29:17 2018 |
Valérian | EXL-PPT | General | 60Co | EXL efficiency | To test EXL efficiency I start a long run
with the source in front of it.
run 3014
|
|
Fixed | e744 |
Mon Jun 4 18:45:15 2018 |
shumpei | MUST2 | Hardware | N/A | No data for two CsIs of MUST2 | During E744 experiment, two CsI crystals (number
1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I |
 |
Fixed | e755 |
Thu Jun 7 09:46:47 2018 |
Louis | MUST2 | Hardware | 3-alpha | MUST2 test | The 8 MUST2 telescopes have been installed
and pluged in final configuration. Energy
signal have been tested with 2 3-alphas sources, |
   |
Fixed | e755 |
Thu Jun 7 12:19:18 2018 |
Louis | MUST2 | Hardware | N/A | MUST2 configuration, X1Y1 and PCB numbers | Pictures showing the MUST2 configuration.
X and Y positions and PCB numbers are as |
 |
Fixed | e755 |
Thu Jun 7 13:54:59 2018 |
Louis | MUST2 | Hardware | N/A | MUST2 Time | MUST2 time have been tested for T1 to T8 for
X and Y. FAG has been delayed with 150ns
and 500ns and sent as stop in MUVI 1 and |
   |
Fixed | e755 |
Thu Jun 7 17:12:38 2018 |
Louis | MUST2 | Hardware | 3-alpha | Calib Alpha | Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
|
   |
Fixed | e755 |
Sun Jun 10 19:51:52 2018 |
Louis | MUST2 | Hardware | 3-alpha | Calibration run | Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
|
   |
Fixed | e755 |
Mon Jun 11 12:50:56 2018 |
Louis | MUST2 | Hardware | 3-alpha | Impact matrix | Impact matrix for Telescope 1 to 8 from the
run 3029 calibrated |
8x |
Fixed | e755 |
Mon Jun 11 13:28:21 2018 |
Louis | ONLINE | Hardware | 3-alpha | Energy resolution MUST2 | Energy resolution of the 8 MUST2 telescopes
from central pic of run 3029 calibrated with
3 alpha source.
|
|
Fixed | e755 |
Wed Jun 13 11:40:18 2018 |
Adrien Valérian Louis | MUST2 | Hardware | 3-alpha | RUN Source 4 Alpha | run 1: 4 alpha source, without heat shield,
1 bar air inside the target cell.
|
   |
Fixed | e755 |
Wed Jun 13 18:20:02 2018 |
linda, Daisuke, Louis | MUST2 | Hardware | 3-alpha | Run test with heat shield | Run 9: heat shield added with two MYLAR foil
of 2um, vacuum has been made inside target
cell. 4 alpha source |
   |
Fixed | e755 |
Thu Jun 14 19:03:06 2018 |
shumpei | OFFLINE | Hardware | N/A | 8MeV alpha source T5&T6 | 8MeV alpha source image on the target was
reconstructed from T5&T6 hit position and
target position information.
|
|
Ongoing | e755 |
Sun Jun 17 11:12:57 2018 |
takeshi | TARGET | Hardware | N/A | current cooling status of the cryogenic target | This is the temperature log of the cryogenic
hydrogen target during the cooling test done
last night.
|
|
Fixed | e755 |
Sun Jun 17 11:25:31 2018 |
takeshi | TARGET | Hardware | N/A | current cooling status of the cryogenic target | This is the temperature log (temperaturelog.png)
of the cryogenic hydrogen target during the
cooling test done last night.
|
  |
Fixed | e755 |
Wed Jun 20 16:45:00 2018 |
Cherry Mx Team | TARGET | Hardware | 3-alpha | Cryo target is filled | We dont see any alpha in detector 1-6m but
we see them in detector 7-8.
|
|
Fixed | e755 |
Thu Jun 21 07:16:51 2018 |
daisuke | RUN | General | 3-alpha | RUN0039 three alpha source calibration MUST2 | alpha source run over night. |
   |
Fixed | e755 |
Thu Jun 21 08:30:48 2018 |
shumpei, daisuke | RUN | General | 3-alpha | RUN0040 8 MeV source run with liquid hydrogen | RUN 0040. started 7:23 am
8 MeV source was set upstream at 0 degrees |
   |
Fixed | e755 |
Thu Jun 21 09:16:01 2018 |
Kitamura | TARGET | Hardware | N/A | Vapor pressure | Vapor pressures of isobutane and CF4. The
paramateres of the Antoine equation were
taken from the following NIST
|
 |
Fixed | e755 |
Thu Jun 21 16:08:32 2018 |
Valerian | MUST2 | Hardware | N/A | Run 3045 : Calimero T1-4 X | [U][B]run 3045 :[/B][/U]
start @ 15h35
stop @ 15h59
|
|
Pinned | e755 |
Thu Jun 21 17:07:14 2018 |
Valerian | MUST2 | General | N/A | run 3046 : Calimero T1-4Y | [U]run 3046 :[/U] Calimero T1-4Y
start @ 16h28
stop @ 16h53 |
|
Fixed | e755 |
Thu Jun 21 18:52:42 2018 |
takeshi | TARGET | Hardware | N/A | target temperature | Here I attached the temperature graph which
is daisuke discussed at the meeting.
Both the heat shield (blue line) and the |
  |
Fixed | e755 |
Fri Jun 22 03:11:51 2018 |
takeshi | VACUUM | Hardware | N/A | the vacuum pressure and the target temperature | We suspect the impurity of the vacuum causes
the rebound behavior of the target temperature.
Here is the data of the vacuum level v.s. |
 |
Fixed | e755 |
Fri Jun 22 11:14:01 2018 |
Valerian Pierre Adrien Fred Fairouz | MUST2 | General | N/A | run 3061 Calimero T5-8X | [U][B]run 3061[/B][/U] Calimero T5-8X |
|
Fixed | e755 |
Fri Jun 22 13:06:29 2018 |
daisuke | MECH | Hardware | N/A | Alpha source ladder instruction | Instruction to translate and rotate the ladder
for the alpha sources (by Vincent). |
|
Fixed | e755 |
Fri Jun 22 13:22:19 2018 |
daisuke | BEAM | Social | N/A | Beam time schedule | |
|
Fixed | e755 |
Fri Jun 22 13:45:22 2018 |
takeshi | TARGET | Hardware | N/A | target temperature status | I would report the temperature log of the
target up to now.
We started cooling the target at 2:21 last |
  |
Fixed | e755 |
Fri Jun 22 16:57:27 2018 |
daisuke | OTHER | Social | N/A | Who is in GANIL? | https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=0 |
|
Fixed | e755 |
Fri Jun 22 21:29:05 2018 |
Pierre Fairouz Adrien Valerian | CATS | General | N/A | Mask reconstruction | Mask reconstruction after adding the correction
shift for CATS.
CATS1X = +1.2
|
 |
Fixed | e755 |
Fri Jun 22 22:12:43 2018 |
daisuke | MECH | Hardware | N/A | positions, geometry and dimensions | |
|
Fixed | e755 |
Fri Jun 22 22:14:30 2018 |
daisuke | MECH | Hardware | N/A | How to open the gate valve | |
|
Pinned | e755 |
Fri Jun 22 22:15:45 2018 |
daisuke | MECH | Hardware | N/A | Geometrical survey report | |
  |
Fixed | e755 |
Sat Jun 23 00:39:33 2018 |
takeshi | TARGET | Hardware | N/A | target temperature | Here is the target temperature up to now.
The black lines are today, and bule lines
are reference.
|
  |
Fixed | e755 |
Sat Jun 23 00:47:19 2018 |
Pierre Valerian | CATS | General | N/A | NEW GOOD mask reconstruction | New shift for CATS after fixing Z position
of CATS detectors.
|
 |
Fixed | e755 |
Sat Jun 23 01:55:34 2018 |
Louis | BEAM | General | CH2 | Beam tunning | Beam was tunned around 1am to center the beam
on the target. On the picture, up is after
tunning and down is before tunning |
|
Fixed | e755 |
Sat Jun 23 02:28:03 2018 |
daisuke, louis, jean-charles | RUN | Software | N/A | RUN 63 (40Ca + liq. H) scalers and histograms | |
10x |
Fixed | e755 |
Sat Jun 23 04:16:03 2018 |
Louis | OFFLINE | General | CH2 | deltaE E | here a plot of energy loss in DSSD in function
of energy in CsI. One can distinguish proton
and alpha. Energy calibration of the CsI |
|
Fixed | e755 |
Sat Jun 23 06:10:01 2018 |
shumpei | OFFLINE | Software | CH2 | 40Ca(p,d)39 reaction | Quick off-line analysis for 40Ca(p,d)39 reaction
is shown.
Used gate - target image and dE-E cut for |
   |
| e755 |
Sat Jun 23 06:16:25 2018 |
Louis | OFFLINE | | | | |
|
Fixed | e755 |
Sat Jun 23 14:07:40 2018 |
Valerian Fairouz | RUN | General | N/A | Problem from Narval | Narval actors went crazy see joined images
run 75 must be trash as it created 18 files |
|
Fixed | e755 |
Sat Jun 23 17:07:35 2018 |
daisuke | RUN | Social | Cryo-LH2 | Run summary 40Ca(p,t) |
total 698 min or 11.6 hours (RUN 63 to 81)
|
|
Fixed | e755 |
Sat Jun 23 18:01:58 2018 |
Valerian Maurycy | OFFLINE | General | Cryo-LH2 | Kinematics Line | Using Run 63-64 we drew Kinematics Lines. |
   |
Ongoing | e755 |
Sat Jun 23 19:10:23 2018 |
Nori | OFFLINE | General | Cryo-LH2 | | |
|
Fixed | e755 |
Sat Jun 23 19:23:19 2018 |
Nori | OFFLINE | General | Cryo-LH2 | 40Ca(p,d) analysis | Analysis of run0072 (two hours accumulation).
Attachment 1:
|
7x |
Fixed | e755 |
Sat Jun 23 19:41:49 2018 |
Valerian | OFFLINE | General | Cryo-LH2 | De_E plot | |
|
Fixed | e755 |
Sat Jun 23 20:07:49 2018 |
Nori | OFFLINE | General | Cryo-LH2 | 40Ca(p,d) analysis | Order-of-magnitude estimate of the target
thickness.
|
|
Fixed | e755 |
Sat Jun 23 20:09:00 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Summary of Runs 83 and 84 | CATS beam 1.7 10**5 /s
Run 84 start @ 19h54 stop @ 20h16 on problem
with CO.
|
19x |
Fixed | e755 |
Sat Jun 23 20:56:15 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Run 85 | CATS beam 1.8 10**5 /s
Beam back at 20h46
Run 85 start @ 20h46 stop @21h02
|
 |
Fixed | e755 |
Sat Jun 23 21:17:03 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 86-Test measurement, (heating target) | CATS beam 1.8 10**5 /s
Target temperature increasing during the
run.
|
|
Fixed | e755 |
Sat Jun 23 21:51:04 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 87-Empty target measurement | CATS beam 1.8 10**5 /s
Run 87 start @ 21h42 stop @ 21h52
|
|
Fixed | e755 |
Sat Jun 23 21:52:01 2018 |
takeshi | TARGET | Hardware | N/A | evaporation of the H2 target | Here is the temperature log when we evaporate
the liquid H2 by heater.
The black line is what we call sensor A, |
|
Fixed | e755 |
Sat Jun 23 22:03:17 2018 |
takeshi | TARGET | Hardware | | temperasure log of the target | I would report the temperature log of the
liquid hydrogen target.
We consider it was liquid during the beam |
  |
Fixed | e755 |
Sat Jun 23 22:08:43 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 88-Empty target measurement | CATS beam 1.8 10**5 /s
Run 88 start @ 22h07
|
10x |
Fixed | e755 |
Sat Jun 23 22:42:33 2018 |
e755 - Louis, Valérie | MUST2 | Hardware | Cryo-LH2 | Status of MUST2 telescopes 23 june 18 | Temperatures on the Mufeex-Y cards:
Temperature set on the regulator -4°C.
|
    |
Fixed | e755 |
Sat Jun 23 22:47:21 2018 |
daisuke | TARGET | Hardware | N/A | Target images for Liq. H and empty target | Attachment 1: RUN 85 with liq.H
Attachment 2: RUN 88 with empty cell.
|
 |
Fixed | e755 |
Sat Jun 23 23:31:12 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Run 89-Empty target measurement | CATS beam 1.5 10**5 /s
Run 89 start @ 23h29
|
|
Fixed | e755 |
Sat Jun 23 23:38:32 2018 |
takeshi | RUN | Social | Cryo-LH2 | run summary for 40Ca beam | run 63-85, total 15.4 hours data was taken
start stop |
|
Fixed | e755 |
Sun Jun 24 09:48:46 2018 |
Francois | BEAM | General | | No beam | 9H10: D5 stopped at 9H10. We asked for the
beam.
|
|
Fixed | e755 |
Sun Jun 24 12:10:35 2018 |
takeshi | TARGET | Hardware | | target temperature during warming up | I would share the temperature log of the target
cell during warming it up.
The thick line is the heat shield and the |
|
Fixed | e755 |
Sun Jun 24 13:20:51 2018 |
takeshi | TARGET | Hardware | N/A | start target cooling | We started cooling the target cell at 13h03.
It would take 4 - 5 hours to cooling the
cell enough low for liquifying hydrogen.
|
|
Fixed | e755 |
Sun Jun 24 13:25:30 2018 |
Fred, valérian, daisuke | DAQ | Software | N/A | Scalers to be recorded | The U2M scaler data cannot be recorded to
the data in the current version of Narval.
So there were no scaler data during the measurement |
|
Fixed | e755 |
Sun Jun 24 16:11:38 2018 |
daisuke | ONLINE | Software | N/A | Automated screenshot | automated screenshot commands
shot: Capture the window selected by the |
 |
Fixed | e755 |
Sun Jun 24 19:51:09 2018 |
Faïrouz, daisuke | MUST2 | Software | N/A | MUST2 threshold from 1 MeV to 0.4 MeV | It was found that the energy threshold of
the strips was as high as 1 MeV. This threshold
setting was chosen for the calibration and |
 |
Fixed | e755 |
Sun Jun 24 21:12:25 2018 |
e755- Valérie | DAQ | Hardware | | GMT chronogrammes | Since Run 103
MASTER FAG 100 ns
SLAVE 100 ns |
 |
Fixed | e755 |
Sun Jun 24 21:36:24 2018 |
e755-Daisuke, Louis, Olivier, Pierre, Valérie | RUN | General | Cryo-empty | Summary of the evening runs 101-105 | run 101 Trigger Cats 2 div; div =1
Run 102
run 103
|
|
Fixed | e755 |
Sun Jun 24 22:13:29 2018 |
takeshi | TARGET | Hardware | N/A | temperature log of the target | We liquefied the hydrogen target around 22:00.
I would share the temperature log of the |
 |
Fixed | e755 |
Sun Jun 24 22:13:30 2018 |
valérie, daisuke | RUN | General | Cryo-empty | RUN 106 empty target run | Run 106 Trigger: MUST2 all
start @ 21h31; stop @21h44
e748 Exxx 168154021 24 juin 21:44 /data/e748X/e755/acquisition/run/run_0106.dat.24-06-18_21h31m26s |
6x |
Fixed | e755 |
Sun Jun 24 22:18:50 2018 |
Daisuke, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 107 | run 107 start@ 22h15; stop@ 22h37
e748 Exxx 689278077 24 juin 22:37 /data/e748X/e755/acquisition/run/run_0107.dat.24-06-18_22h15m16s |
  |
Fixed | e755 |
Sun Jun 24 22:25:53 2018 |
shumpei | MUST2 | Hardware | Cryo-empty | threshold for DSSDs of MUST2 | Threshold of DSSDs were changed (see entry
638).
Run 106 was analyzed and now the threshold |
|
Fixed | e755 |
Sun Jun 24 22:26:46 2018 |
Daisuke, Louis, Olivier, Valérie | MUST2 | General | Cryo-LH2 | HV on MUST2, currents, CATS | NB: SiLi1 T7 has tripped during the evening
(since Run 104)
It should be put on again (better to increase |
 |
Fixed | e755 |
Sun Jun 24 22:45:41 2018 |
Daisuke, Fairouz, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 108 | Run 108 24 june start @ 22h38 stop@ 22h54
e748 Exxx 10068143 24 juin 22:54 /data/e748X/e755/acquisition/run/run_0108.dat.24-06-18_22h38m15s
Triggers Cats 1 and Cats2 DIV= 3.10**4
|
 |
Fixed | e755 |
Sun Jun 24 23:07:45 2018 |
Daisuke, Fairouz, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 109 | Run 109 24 june start @ 22h54 stop@ 23h14
e748 Exxx 9723325 24 juin 23:14 /data/e748X/e755/acquisition/run/run_0109.dat.24-06-18_22h54m26s
Triggers Cats 1 and Cats2 DIV= 3.10**4
|
    |
Fixed | e755 |
Sun Jun 24 23:17:01 2018 |
Daisuke, Fairouz, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 110 | Run 110 24 june start @ 23h15 stop @ 23h56
e748 Exxx 1339167483 24 juin 23:56 /data/e748X/e755/acquisition/run/run_0110.dat.24-06-18_23h14m53s
|
|
Fixed | e755 |
Mon Jun 25 00:13:48 2018 |
Valérie +Lise team: Jean-Charles+Target: Takeshi | RUN | General | Cryo-LH2 | RUN 111 | Run 111 25th June start @ 0h stop @1h13
e748 Exxx 3590054877 25 juin 01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
|
16x |
Fixed | e755 |
Mon Jun 25 01:17:47 2018 |
Valérie +Lise team: Jean-Charles+Target: Takeshi | RUN | General | Cryo-LH2 | RUN 112 | Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin 02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
Target seems to be still ok and filled! |
6x |
Fixed | e755 |
Mon Jun 25 02:34:30 2018 |
Valérie +Target: Takeshi | RUN | General | Cryo-LH2 | RUN 113 | Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin 03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
|
11x |
Fixed | e755 |
Mon Jun 25 03:14:38 2018 |
e755- Valérie | MUST2 | Hardware | Cryo-LH2 | HV on MUST2, currents, CATS | HV and currents on DSSDs and SiLi at 3h20
Telescopes T
|
|
Fixed | e755 |
Mon Jun 25 03:58:22 2018 |
Valérie +Target: Takeshi | RUN | General | Cryo-LH2 | RUN 114 | Run 114 25th June start @ 3h57 stop @5h34
e748 Exxx 4015552641 25 juin 05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
|
9x |
Fixed | e755 |
Mon Jun 25 05:34:53 2018 |
Valérie +Target: Takeshi | RUN | General | Cryo-LH2 | RUNS 115, 115.1 and 116 | Run 115 25th June start @ 5h34 stop@6h57
e748 Exxx 4190541701 25 juin 06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
-------------------------------------------------------------------------------
|
    |
Fixed | e755 |
Mon Jun 25 07:41:54 2018 |
e755- Valérie | MUST2 | Hardware | Cryo-LH2 | SUMMARY-Missing strips MUST2 |
Telescopes MM1 to MM8, XY ET missing strips
----------------------------------------------------
|
 |
Fixed | e755 |
Mon Jun 25 08:38:34 2018 |
e755 Louis Francois Marlene | OFFLINE | General | Cryo-LH2 | 38Ca(p,d)37Ca | Here Kine;atics line for th 38Ca(p,d)37Ca
Channel from run 110 |
 |
Fixed | e755 |
Mon Jun 25 10:42:47 2018 |
daisuke | TARGET | Software | Cryo-empty | RUN 106 (38Ca with empty target) S/N | p, d, t ratio of events from the target frame
and from the target aperture (covered by
Havar 6.5 micron and Mylar 2 micron)
|
7x |
Fixed | e755 |
Mon Jun 25 11:12:40 2018 |
Marlene, Louis | RUN | General | Cryo-LH2 | Run 117, 38Ca, Target filled | Run 117 started @ 10h54
stopped @ 11h32 to enter in the room
|
6x |
Fixed | e755 |
Mon Jun 25 11:23:03 2018 |
daisuke | TARGET | Hardware | Cryo-LH2 | Liquid hydrogen target logger | |
|
Fixed | e755 |
Mon Jun 25 13:40:41 2018 |
Marlene, Louis | RUN | General | Cryo-LH2 | RUN 118 CAVIAR setting | run 118 started @ 13h13
stopped @ 13h43
|
|
Fixed | e755 |
Mon Jun 25 14:04:17 2018 |
Marlene, Louis | RUN | General | Cryo-LH2 | RUN 119 to 121 | Test for CAVIAR and CHIO:
run 119 with two 1/15 reductors 13h54 to |
|
Fixed | e755 |
Mon Jun 25 16:09:24 2018 |
Benoit Louis | RUN | General | Cryo-LH2 | Beam and CHIO tunning | During run 126:
Beam was tuned to be centered and homogeneous
in the target
|
  |
Fixed | e755 |
Mon Jun 25 17:23:49 2018 |
Cherry Mx Team | CATS | General | Cryo-LH2 | Confirmation of CATS reconsctruction | Gating on T1 to T4 and looking at the the
CATS reconstruction on Target we confirm
that;
|
|
Fixed | e755 |
Mon Jun 25 17:27:59 2018 |
Cherry Mx Team | CATS | General | Cryo-LH2 | Confirmation of CATS reconsctruction | Gating on T1 to T4 and looking at the the
CATS reconstruction on Target we confirm
that;
|
 |
Fixed | e755 |
Mon Jun 25 17:28:03 2018 |
Nori | TARGET | Hardware | Cryo-LH2 | Liquid hydrogen target logger | There was a sudden increase of the temperature
at 4pm. Fortunately the cell is still filled
with liquid. |
 |
Fixed | e755 |
Mon Jun 25 17:31:27 2018 |
daisuke, benoït | TARGET | Software | Cryo-LH2 | RUN 127 (Still filled with liquid? test with Wien filter) | Beam spot is now too small to see the cell
frames. Moved the beam spot down and up by
using the Wien filter. It is not conclusive, |
   |
Fixed | e755 |
Mon Jun 25 17:40:44 2018 |
daisuke, benoït | RUN | Software | Cryo-LH2 | RUN 128 (Still filled with liquid?) | |
10x |
Fixed | e755 |
Mon Jun 25 19:59:55 2018 |
marlène, freddy, benoït | MUST2 | Software | N/A | CsI disabled in MUVI/DAS | |
|
Fixed | e755 |
Mon Jun 25 20:01:07 2018 |
olivier, daisuke | DAQ | Hardware | N/A | Another deat time scaler | After RUN 128, we entered D6 to add another
deat time measuring pulses to U2M channel
9. This is supposed to correctly measure |
|
Fixed | e755 |
Mon Jun 25 20:10:21 2018 |
daisuke, benoît | RUN | General | Cryo-LH2 | RUN 130 | |
 |
Fixed | e755 |
Mon Jun 25 20:51:28 2018 |
daisuke, benoît | RUN | General | Cryo-LH2 | RUN 132 | Previous run (RUN 131), MUST2 threshold was
raised to 500 keV to see how the dead time
(DESC/ORDD) is improved (found not effective). |
9x |
Fixed | e755 |
Mon Jun 25 22:40:38 2018 |
daisuke, benoît | RUN | General | Cryo-LH2 | Run 133 | same as before |
6x |
Fixed | e755 |
Mon Jun 25 23:17:56 2018 |
Nori | MUST2 | General | Cryo-LH2 | DSSD multiplicity | Data analysis of run0128 (38Ca physics run).
The multiplicity distribution of DSSD x-strips
is shown in
|
  |
Fixed | e755 |
Tue Jun 26 00:09:40 2018 |
Pierre, Shumpei | RUN | General | Cryo-LH2 | RUN 134 | Start: 26/06 at 00h05
Stop: 00h40 for PCP to improve beam tuning
|
  |
Fixed | e755 |
Tue Jun 26 01:02:42 2018 |
Pierre, Shumpei | RUN | General | Cryo-LH2 | RUN 135 | start: 01h02
stop: 01h39
Trigger: MM+CATS DIV
|
 |
Fixed | e755 |
Tue Jun 26 01:46:56 2018 |
Pierre, Shumpei | RUN | General | Cryo-LH2 | RUN 136 | start: 01h41
stop: 03h37
|
  |
Fixed | e755 |
Tue Jun 26 03:40:15 2018 |
Pierre, Shumpei | RUN | General | Cryo-LH2 | RUN 137 | start: 03h38
stop: 05h30
|
  |
Fixed | e755 |
Tue Jun 26 05:32:35 2018 |
Pierre, Shumpei | RUN | General | Cryo-LH2 | RUN 138 | start: 05h31
stop: 07h23
|
 |
Fixed | e755 |
Tue Jun 26 05:40:52 2018 |
Pierre | OFFLINE | General | Cryo-LH2 | Kinematic lines and Ex for 38Ca(p,d) and 38Ca(p,t) | -> 38Ca(p,d) uses run 128
-> 38Ca(p,t) uses run from 128 up to 136
|
 |
Fixed | e755 |
Tue Jun 26 06:55:51 2018 |
shumpei | OFFLINE | Software | Cryo-LH2 | 38Ca (p,t) 36Ca | Run 111 - 134 (almost 1 day) data was analyzed.
38Ca (p,t) 36 Ca was reconstructed
only from Telescope 3. |
|
Fixed | e755 |
Tue Jun 26 07:24:59 2018 |
Pierre, Shumpei, Yorick, Valérie | RUN | General | Cryo-LH2 | RUN 139 | start: 07h23
stop: 8h52
748 Exxx 3003199093 26 juin 08:52 /data/e748X/e755/acquisition/run/run_0139.dat.26-06-18_07h22m11s
|
  |
Fixed | e755 |
Tue Jun 26 08:13:02 2018 |
e755-Valérie | RUN | General | Cryo-LH2 | data Run summary 25+26 june | RUNS since 25 june pm till 26th june 7am
r--r--r-- 1 e748 Exxx 626093289 25 juin |
|
Fixed | e755 |
Tue Jun 26 08:15:29 2018 |
e755 Valérie | MUST2 | General | Cryo-LH2 | MUST2 configuration summary | MUST2 summary 26th June 8am
MUST2 thresholds 402 keV
|
 |
Fixed | e755 |
Tue Jun 26 09:01:23 2018 |
Daisuke, Takeshi, Yorick, Valérie | RUN | General | Cryo-LH2 | RUN 140 | Run 140 start: 8h55 ; stop: 9h59
748 Exxx 3348489513 26 juin 09:59 /data/e748X/e755/acquisition/run/run_0140.dat.26-06-18_08h55m32s
The Csi Mate were put on the trigger again |
21x |
Fixed | e755 |
Tue Jun 26 09:28:10 2018 |
takeshi | TARGET | Hardware | N/A | temperature of the target | <p>Here is the temperature log of the target
up to now. The black lines are today, The
thicker line is the cell window this time, |
   |
Fixed | e755 |
Tue Jun 26 09:52:35 2018 |
e755 Valérie | RUN | General | Cryo-LH2 | Summary of MUST2 plots during RUN 140 |
The Csi Mate were put on the trigger again
"ENABLE" in the DAS. see snapshot DAS_MUVIenableMateCsI.png |
   |
Fixed | e755 |
Tue Jun 26 10:03:29 2018 |
Adrien, Freddy, Marlène, Yorick, Valérie, target team: Daisuke, Takeshi | RUN | General | Cryo-LH2 | RUN 141 | Run 141 26th june start@ 9h59 stop: 11h12
e748 Exxx 3449521865 26 juin 11:12 /data/e748X/e755/acquisition/run/run_0141.dat.26-06-18_09h59m57s
|
    |
Fixed | e755 |
Tue Jun 26 11:47:16 2018 |
NPTeam | OFFLINE | General | Cryo-LH2 | 38Ca(p,d)37Ca with zero deg gate | We did a gate on IC_E:PlasticQ on particle
with same Z as the beam.
|
|
Fixed | e755 |
Tue Jun 26 12:06:41 2018 |
Marlène, Yorick, Valérie | RUN | General | Cryo-LH2 | RUN 142 | Run 142 26th june start@ 11h15 ; stop @11h27
e748 Exxx 492791993 26 juin 11:27 /data/e748X/e755/acquisition/run/run_0142.dat.26-06-18_11h15m39s
|
 |
Fixed | e755 |
Tue Jun 26 12:18:08 2018 |
Marlène, Yorick, Valérie | RUN | General | Cryo-LH2 | RUN 143 | Run 143 -- 26th June start@ 11h30 ; stop
@ 11h39
e748 Exxx 306151179 26 juin 11:39 /data/e748X/e755/acquisition/run/run_0143.dat.26-06-18_11h30m28s
|
  |
Fixed | e755 |
Tue Jun 26 12:22:56 2018 |
Marlène, Yorick, Valérie | RUN | General | Cryo-LH2 | RUN 144 | Run 144 -- 26th June start@ 11h51 ; stop
@ 13h04
|
6x |
Fixed | e755 |
Tue Jun 26 13:37:44 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 145 | Run 145 -- 26th June start@ 13h07 ; stop @
13h53
e748 Exxx 2239017281 26 juin 13:53 /data/e748X/e755/acquisition/run/run_0145.dat.26-06-18_13h06m30s
|
  |
Fixed | e755 |
Tue Jun 26 13:41:02 2018 |
NPTeam | MUST2 | General | N/A | Change in strips firing | After changing in the MUST2 the range of pedestal
suppression (Ex < 8192 are rejected and Ey
> 8192 are rejected). we can clearly see |
 |
Fixed | e755 |
Tue Jun 26 14:29:36 2018 |
Daisuke, Louis, Olivier, Valérie | RUN | General | Cryo-LH2 | RUN 146 | Run 146 -- 26th June start@ 14h07 stop @14h26
e748 Exxx 844513015 26 juin 14:26 /data/e748X/e755/acquisition/run/run_0146.dat.26-06-18_14h07m32s
The run was stopped: no beam due to the |
|
Pinned | e755 |
Tue Jun 26 14:36:55 2018 |
NPteam | OFFLINE | General | | 36Ca(p,t)36Ca analysis with zero degree gate | Here is an update of the analysis results
for the 36Ca(p,t)36Ca channel.
|
 |
Fixed | e755 |
Tue Jun 26 14:39:52 2018 |
Charles H, Fred, Valérie | RUN | General | Cryo-LH2 | RUN 147 | Run 147 -- 26th June start@ 14h34
We make some checkings of DT during the beam |
6x |
Fixed | e755 |
Tue Jun 26 16:38:31 2018 |
daisuke, thomas | RUN | General | Cryo-LH2 | RUN 148 38Ca beam is back | |
20x |
Fixed | e755 |
Tue Jun 26 16:40:12 2018 |
Adrien | OFFLINE | Software | Cryo-LH2 | Offline analysis of p,t | Looking at the pt reaction and gating on z
= 20 (solid blue) and z=19 (hashed orange)
we see a total of three states. |
|
Fixed | e755 |
Tue Jun 26 18:28:45 2018 |
Nori | OFFLINE | General | Cryo-LH2 | 37K,36Ar(p,t) | Offline analysis of run0128-0146.
Cuts: tritons, target aperture, beam, and |
 |
Fixed | e755 |
Tue Jun 26 18:41:59 2018 |
e755 Valérie | RUN | General | Cryo-LH2 | DAS save Summary of MUST2 conditions -26 june | The DAS configuration was saved under e755.das
and .e755_Exp26juin18Mmthreshd.das at 18h40
on June 26th.
|
|
Pinned | e755 |
Tue Jun 26 18:43:35 2018 |
Valerian | DAQ | General | N/A | In case of a data acqusition crash | [CODE]If the acquisition crash :
In the acquisition terminal :
|
|
Fixed | e755 |
Tue Jun 26 20:33:17 2018 |
daisuke | TARGET | Hardware | Cryo-LH2 | Liquid hydrogen target logger | |
|
Fixed | e755 |
Wed Jun 27 01:14:54 2018 |
takeshi | RUN | General | N/A | online run summary | I made a run summary up to now in the google
spreadsheet.
You can see it on
|
|
Fixed | e755 |
Wed Jun 27 01:34:28 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | run153 | RUN 153
started @ 1h26 stopped at 3h20
|
12x |
Fixed | e755 |
Wed Jun 27 03:29:32 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | RUN 154 | RUN 154
started @ 3h21 stopped @ 5h16
|
  |
Fixed | e755 |
Wed Jun 27 04:12:57 2018 |
Freddy, Louis | OFFLINE | General | | Summary 38Ca(p,t) - Run 128 to 152 | Here are some plot summarizing the analysis
status on the 38Ca(p,t) channel.
|
   |
Fixed | e755 |
Wed Jun 27 04:46:00 2018 |
Freddy, Louis | OFFLINE | General | | Summary 36Ar(p,t) - Run 128 to 152 | Here are some plot summarizing the analysis
status on the 36Ar(p,t) similar method as
in the previous entry:
|
  |
Fixed | e755 |
Wed Jun 27 05:20:22 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | RUN 155 | RUN 155
started @ 5h16
stoppd at 7h19
|
  |
Fixed | e755 |
Wed Jun 27 05:57:49 2018 |
takeshi | TARGET | General | Cryo-LH2 | liquid hydrogen target temperature log | It seems stable.
We liquified H2 around 22:00 24th (10 hours
in the plot), so the target kept liquefying |
|
Fixed | e755 |
Wed Jun 27 07:23:41 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | RUN 156 | RUN 156
start at 7h17
|
|
Fixed | e755 |
Wed Jun 27 09:26:32 2018 |
daisuke | TARGET | Hardware | Cryo-LH2 | Liquid hydrogen target logger (end of 38Ca) | |
|
Fixed | e755 |
Wed Jun 27 09:49:37 2018 |
gib | RUN | General | Cryo-LH2 | RUN 155 | run 156 for ref. LH2 empty next |
  |
Fixed | e755 |
Wed Jun 27 10:08:41 2018 |
gib | RUN | General | Cryo-empty | RUN 157 : empty target | |
17x |
Fixed | e755 |
Wed Jun 27 10:15:36 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 38Ca + liq. H2 | Here is the summary of the measurement of
38Ca + liq H2 setting.
We obtain 49.45-hour data acquisition time, |
|
Fixed | e755 |
Wed Jun 27 11:38:09 2018 |
gib | OTHER | General | Cryo-empty | end of empty run. Now tuning for 36Ca | |
 |
Fixed | e755 |
Wed Jun 27 16:03:26 2018 |
Valerian | OFFLINE | General | Cryo-LH2 | Status on 38Ca pt | |
|
Ongoing | e738 |
Wed Jun 27 17:42:14 2018 |
daisuke | OTHER | General | N/A | Toward E738 | |
    |
Fixed | e755 |
Wed Jun 27 17:46:55 2018 |
e755 Daisuke, Olivier, Nori, Valérie | RUN | General | Cryo-empty | Run 158 Beam tuning for 36Ca | At 17h20 the beam was back in D6, ready for
tuning by the LISE team, Christelle, Jean-Charles
and Omar.
|
  |
Fixed | e755 |
Wed Jun 27 18:34:31 2018 |
NPTeam | OFFLINE | General | Cryo-LH2 | Update on the offline Analysis for 38Ca pt run 128-156 | |
 |
Fixed | e755 |
Wed Jun 27 18:42:09 2018 |
e755 Daisuke, Olivier, Valérie | RUN | General | Cryo-empty | RUN 159 New input in GMT trigger +scalers | Change of the GMT Trigger:
New entry IN12 corresponding to the CATS2
with no division.
|
   |
Fixed | e755 |
Wed Jun 27 19:26:13 2018 |
e755 Daisuke, Olivier, Pierre, Valérie | RUN | General | Cryo-empty | Run 160 -36Ca | TAC Cats2 HF delay of 30 ns is removed
Run 160 start@ 19h13 stop@ 19h23
|
|
Fixed | e755 |
Wed Jun 27 19:27:52 2018 |
e755 Daisuke, Olivier, Valérie | RUN | General | Cryo-empty | Run 161 -36Ca |
Run 161 start @ 19h25 stop@20h30
e748 Exxx 2411656699 27 juin 20:30 /data/e748X/e755/acquisition/run/run_0161.dat.27-06-18_19h25m55s
|
    |
Fixed | e755 |
Wed Jun 27 20:39:44 2018 |
e755 Daisuke, Olivier, Valérie | RUN | General | Cryo-empty | Run 162-38Ca | TUNING OF 38Ca to be ready during the night,
after the change of CO source at the machine
between 21h ans 2am (maybe).
|
 |
Fixed | e755 |
Wed Jun 27 21:13:40 2018 |
e755 Daisuke, Olivier, edited by Valérie | RUN | General | Cryo-empty | Conditions for the night runs | TUNING OF 38Ca to be ready during the night,
after the change of CO source at the machine
between 21h and 2am (maybe).
|
|
Fixed | e755 |
Wed Jun 27 21:25:41 2018 |
takeshi, shunpei | TARGET | Hardware | Cryo-LH2 | temperature log during liquefying | Here is the temperature log before and during
liquefying.
The temperature trend seems almost same as |
|
Fixed | e755 |
Wed Jun 27 22:11:20 2018 |
Pierre Louis | OFFLINE | General | Cryo-LH2 | Offline analysis of 38Ca(p,d)37Ca | Here are some plot summarizing the analysis
status on the 38Ca(p,d) channel.
|
 |
Fixed | e755 |
Thu Jun 28 00:59:55 2018 |
e755 Daisuke, Olivier, Pierre, Marlène, Valérie (: edit) | RUN | General | Cryo-empty | Run 162-38Ca | 38Ca Beam at ~ 2. 10**5 pps
F62 +/- 11 mm
SLITS FH31 +/-5mm (moment)
|
8x |
Fixed | e755 |
Thu Jun 28 01:22:43 2018 |
Nori | BEAM | General | N/A | Brho2 scan for 36Ca | We scanned Brho2 values so that the yield
for 36Ca is maximized (LISE run0282-0284,
F31 = +/-6 mm).
|
  |
Fixed | e755 |
Thu Jun 28 01:26:34 2018 |
daisuke | TARGET | Hardware | Cryo-LH2 | Liquid hydrogen target logger | |
6x |
Fixed | e755 |
Thu Jun 28 01:39:58 2018 |
Nori | BEAM | General | N/A | Discussion for 37Ca | Offline analysis of LISE run0281. F31 = +/-0.6
mm, without wedge.
The number of counts of 37Ca was 900/50 = |
 |
Fixed | e755 |
Thu Jun 28 08:20:54 2018 |
e755 | RUN | General | Cryo-LH2 | Summary Run 165-169 | [U][B]Run 165[/B][/U][LIST]
[*] start: 2h12
[*] start: 3h11
|
|
Fixed | e755 |
Thu Jun 28 08:29:08 2018 |
Louis | CATS | General | Cryo-LH2 | CATS-HF time shift during the night | noticed that the time between CATS and HF
shifted during the night.
run 164 to 169 |
6x |
Fixed | e755 |
Thu Jun 28 08:34:30 2018 |
Fredd, Louis, Daisuke | RUN | General | Cryo-LH2 | Run 170 | [U][B]Run 170[/B][/U][LIST]
[*] start: 8h07
[*] start:
|
    |
Fixed | e755 |
Thu Jun 28 10:38:58 2018 |
Freddy | MUST2 | General | N/A | T4 Comparison of calibration runs | Attached is a comparison of two calibrations
performed before the experiment (2 weeks
and one day before) for Telescope 4 (the |
 |
Fixed | e755 |
Thu Jun 28 11:08:54 2018 |
Freddy, Louis, Valerian | RUN | General | 3-alpha | Intermediate alpha calibration T1234 | Run 171
3alpha source in front of T1234
|
 |
Fixed | e755 |
Thu Jun 28 13:53:28 2018 |
Freddy, Louis, Valerian | RUN | General | 3-alpha | Pedestal run + Alpha calibration with T4 at 80V | [U][B]Run 172[/B][/U][LIST]
[*] Pedestal run on T1234
[/LIST]
|
|
Fixed | e755 |
Thu Jun 28 19:58:12 2018 |
shumpei | OTHER | General | N/A | Kinematics for the reactions | Kinematics for the reaction of E755 and E738
experiments are shown. |
|
Fixed | e755 |
Fri Jun 29 00:59:15 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Analysis of run 63 to 89 in 40Ca(p,t)38ca reaction | Here are some plot summarizing the analysis
status on the [B]40Ca(p,t)38Ca[/B] channel.
|
   |
Fixed | e755 |
Fri Jun 29 07:04:35 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | target temperature | |
|
Fixed | e755 |
Fri Jun 29 08:06:42 2018 |
e755 Valérie | RUN | General | Cryo-LH2 | Summary- Runs 175 to 184 | RUNS during night Friday 29th June From 3am
to 8am
RUNS 175 to 184 - cf Scalers, and TcatsHF |
29x |
Fixed | e755 |
Fri Jun 29 08:08:47 2018 |
e755 Valérie, target :Takeshi | RUN | General | Cryo-LH2 | Run 185 | Run 185 Friday 29th June start@ 8h stop@
All triggers Must2+cats1 and Cats 2 div.
Mean intensity of the beam between 1.5 to |
13x |
Fixed | e755 |
Fri Jun 29 09:08:50 2018 |
e755 Valérie | RUN | General | Cryo-LH2 | Plots of Must2 and Cats during run 185 | Run 185 Friday 29th June see entry 742
Mean intensity of the beam between 1.5 to |
14x |
Fixed | e755 |
Fri Jun 29 09:53:33 2018 |
e755 Valérie, target :Takeshi | RUN | General | Cryo-LH2 | Run 186 problem Numexo-Narval | Run 186 Friday 29th June start@ 9h48 stop@9h51
e748 Exxx 551 29 juin 09:50 run_0186.dat.29-06-18_09h48m46s
All triggers Must2+cats1 and Cats 2 div.
|
|
Fixed | e755 |
Fri Jun 29 10:03:06 2018 |
e755 Valérie, target :Takeshi | RUN | General | Cryo-LH2 | Run 187 | Run 187 Friday 29th June start@ 9h53 stop@10h05
e748 Exxx 95976431 29 juin 10:05 run_0187.dat.29-06-18_09h53m29s
All triggers Must2+cats1 and Cats 2 div.
|
|
Fixed | e755 |
Fri Jun 29 10:41:00 2018 |
e755 Olivier, Omar, Valérie, target : Nori, Takeshi | RUN | General | Cryo-LH2 | Run 188 | Run 188 Friday 29th June start@10h36 stop@10h40
e748 Exxx 18078991 29 juin 10:40 run_0188.dat.29-06-18_10h35m20s
|
|
Fixed | e755 |
Fri Jun 29 12:39:34 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Analysis 38Ar(p,t)36Ar run 128 to 156 | Here are some plot summarizing the analysis
status on the [B]36Ar(p,t)34Ar[/B] channel.
|
    |
Fixed | e755 |
Fri Jun 29 14:00:51 2018 |
takeshi | RUN | General | Cryo-LH2 | summary for 38Ca + liq. H2, updated | I would summarize the statistics of 38Ca +
liq H2 target measurement.
We have obtained the data of 49.5 hours until |
|
Fixed | e755 |
Fri Jun 29 17:43:46 2018 |
daisuke | TARGET | General | Cryo-LH2 | liquid hydrogen target logger | last update at 6 am on June 30 |
10x |
Fixed | e755 |
Sat Jun 30 01:55:35 2018 |
Daisuke Louis | RUN | General | Cryo-LH2 | RUN 191 FIRST PHYSICS RUN IN 37Ca | [B]RUN 191:[/B]
started at 1:20
|
21x |
Fixed | e755 |
Sat Jun 30 03:18:14 2018 |
louis, Daisuke | RUN | Software | Cryo-LH2 | Beam image after retracting CHIO | the beam seems more focused after retracting
CHIO upstream of M2C. Screenshot taken during
RUN 193. |
|
Fixed | e755 |
Sat Jun 30 04:54:55 2018 |
louis, daisuke | RUN | General | Cryo-LH2 | RUN 194 | Continue 37ca data taking. |
45x |
Fixed | e755 |
Sat Jun 30 08:24:07 2018 |
Freddy, Shumpei, Louis | RUN | General | Cryo-LH2 | Run 195 | [U][B]Run 195[/B][/U]
start: 8h08
|
    |
Fixed | e755 |
Sat Jun 30 09:17:25 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Offline analysis of 37Ca(p,d)36Ca reaction | Here are some plot summarizing the analysis
status on the [B]37Ca(p,d)36Ca[/B] channel.
Plots shows performance of the setup in optimal |
7x |
Fixed | e755 |
Sat Jun 30 11:25:59 2018 |
Freddy, Shumpei | BEAM | General | Cryo-LH2 | Beam profile on the target | The beam profile on the target for each isotope
is shown for all trigger and CATS trigger
(GATCONF > 500).
|
 |
Fixed | e755 |
Sat Jun 30 13:25:27 2018 |
Freddy, Shumpei | RUN | General | Cryo-LH2 | Run 196 | [U][B]Run 196[/B][/U]
start: 12h09
|
  |
Fixed | e755 |
Sat Jun 30 15:07:43 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | 37Ca (p,d) 36Ca | 37Ca (p,d) 36Ca reaction is analyzed (run
191-195).
|
 |
Fixed | e755 |
Sat Jun 30 16:04:11 2018 |
takeshi, Didier | RUN | General | Cryo-LH2 | run 197 | RUN 197
start: 15h39
stop : 17h38
|
   |
Fixed | e755 |
Sat Jun 30 17:45:17 2018 |
takeshi, Didier | RUN | General | Cryo-LH2 | run 198 | RUN 198
start: 17h40
|
   |
Fixed | e755 |
Sat Jun 30 18:09:53 2018 |
Nori | BEAM | General | N/A | Brho1 and Brho2 optimization for 37Ca | Summary of Brho1 and Brho2 optimizations for
the 37Ca beam.
|
  |
Fixed | e755 |
Sat Jun 30 20:08:27 2018 |
didier, takeshi, daisuke | RUN | General | Cryo-LH2 | RUN 199 37C + liq. H | |
28x |
Ongoing | e755 |
Sat Jun 30 20:12:33 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | target temperature | Latest update at 12:15 pm on July 1
Here are the temperature logs up to 7:00pm
30/6. |
   |
Fixed | e755 |
Sat Jun 30 23:47:45 2018 |
takeshi, daisuke, didier | BEAM | General | Cryo-LH2 | result of Wien filter tuning | Here is the summary of the tuning of the Wien
filter.
We tried to tune the correction magnet of |
   |
Fixed | e755 |
Sun Jul 1 01:48:23 2018 |
Adrien | RUN | General | Cryo-LH2 | Run 205 | Starting Run 205 at 1:45.
CATS 1 : 22kps
CATS 2 : 23kps
|
   |
Fixed | e755 |
Sun Jul 1 06:42:28 2018 |
e748 | OFFLINE | General | Cryo-LH2 | offline of run 192-206 | Here are te plot of analysis of all the available
statistic on 37Ca pd. |
|
Fixed | e755 |
Sun Jul 1 09:43:58 2018 |
Benoit, Franck | RUN | General | Cryo-LH2 | Run 209 | Sun 1 July 2018
Start 9:26
|
9x |
Fixed | e755 |
Sun Jul 1 09:48:44 2018 |
Benoit, Franck | RUN | General | Cryo-LH2 | Run 208 (ENTRY POSTPONED) | Sun 1 July
Start 7:17
|
7x |
Fixed | e755 |
Sun Jul 1 11:52:27 2018 |
Benoit, Franck | RUN | General | Cryo-LH2 | Run 210 | Sun 1 July 2018
Start 11:46
|
7x |
Fixed | e755 |
Sun Jul 1 17:11:55 2018 |
freddy, shumpei, daisuke | RUN | General | Cryo-LH2 | RUN 214 | from 17h01 to 18h39 (anoxia alert. PCP to
inspect). 40ca ~3.0 micro A. |
  |
Fixed | e755 |
Sun Jul 1 18:44:24 2018 |
freddy, shumpei, daisuke | RUN | General | N/A | RUN 215 | Alpha source run. no beam
18h41 started
19h22 ended |
  |
Fixed | e755 |
Sun Jul 1 19:22:32 2018 |
freddy, shumpei, daisuke | RUN | General | Cryo-LH2 | RUN 216 | 37Ca + liquid H
19h20 started
21h18 ended. |
    |
Fixed | e755 |
Sun Jul 1 21:21:18 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 217 | RUN 217
37Ca beam at 2.104pps
|
   |
Fixed | e755 |
Sun Jul 1 23:18:21 2018 |
freddy, louis, shumpei, daisuke | RUN | General | Cryo-LH2 | RUN 219 | 37ca + liq.H
22h50 started
1h00 ended |
7x |
Fixed | e755 |
Mon Jul 2 00:53:49 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Update offline analysis on 37Ca(p,d)36Ca | Update of offline Analysis of the [B]37Ca(p,d)36Ca[/B]
reaction:
|
  |
Fixed | e755 |
Mon Jul 2 01:01:15 2018 |
daisuke | TARGET | General | Cryo-LH2 | cryogenic target logger | |
  |
Fixed | e755 |
Mon Jul 2 01:05:12 2018 |
louis, daisuke | RUN | General | Cryo-LH2 | RUN 220 | 37ca + liq.H.
1h01 started
1h56 ended.Beam stopped due to the trouble |
   |
Ongoing | e738 |
Mon Jul 2 01:29:58 2018 |
daisuke | OTHER | General | N/A | Q values |
Reaction : 9C(1H,3H)7C Q -29.5098 MeV
Ex 0 MeV
|
 |
Fixed | e755 |
Mon Jul 2 01:58:07 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 221 | 37ca + liquid H (no beam at times)
1h56 started. no beam
2h03 beam came back with low intensity. Keep |
6x |
Fixed | e755 |
Mon Jul 2 04:02:15 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 222 | 37Ca + liq. H
4h00 started
5h57 ended. |
8x |
Fixed | e755 |
Mon Jul 2 06:01:35 2018 |
louis daisuke | RUN | General | Cryo-LH2 | RUN 223 | 37Ca + liquid H.
5h59 started.40Ca 3.3 micro A.
6h17 beam stop. A few issues including RF. |
7x |
Fixed | e755 |
Mon Jul 2 07:23:34 2018 |
Louis | OFFLINE | General | Cryo-LH2 | 36Ca and 37Ca(p,t)35Ca reaction | RUN 192 to 222
Beam time: 62h
|
   |
Fixed | e755 |
Mon Jul 2 07:37:50 2018 |
Louis | OFFLINE | General | Cryo-LH2 | Background | RUN: 86 to 89
Beam time: 2h30
Beam 40Ca with empty target
|
|
Fixed | e755 |
Mon Jul 2 08:02:52 2018 |
louis, daisuke, takeshi, didier | RUN | General | Cryo-LH2 | RUN 224 | 37ca + liquid H
8h00 started
10h01 stopped
|
  |
Fixed | e755 |
Mon Jul 2 10:12:29 2018 |
takeshi, didier | RUN | General | Cryo-LH2 | RUN225 | RUN 225
37Ca beam + liq. H2 target
10h02 started
|
6x |
Fixed | e755 |
Mon Jul 2 12:09:56 2018 |
takeshi, Didier, olivier | RUN | General | Cryo-LH2 | RUN 226 | RUN 226
37Ca + liq. H2
12h03 started
|
6x |
Fixed | e755 |
Mon Jul 2 14:37:44 2018 |
takeshi, didier, olivier | RUN | General | Cryo-LH2 | RUN 229 | RUN 229
Ca37 + liq. H2
Beam is back 14h30
|
|
Fixed | e755 |
Mon Jul 2 15:18:21 2018 |
takeshi, didier, olivier | RUN | General | Cryo-LH2 | RUN 230 | RUN 230
37Ca + liq. H2
15h11 started
|
7x |
Ongoing | e755 |
Mon Jul 2 16:16:40 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Fixed | e755 |
Mon Jul 2 16:50:10 2018 |
Pierre, Louis | RUN | General | Cryo-LH2 | Run 231 | start: 16h47
stop: 18h48
|
 |
Fixed | e755 |
Mon Jul 2 18:51:11 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 232 | start: 18h49
stop: 20h41
|
31x |
Fixed | e755 |
Mon Jul 2 20:44:46 2018 |
pierre, takeshi, louis, nori, daisuke | RUN | General | Cryo-LH2 | RUN 233 | 37ca + liquid H
20h43 started.
21h31 stop |
 |
Fixed | e755 |
Mon Jul 2 22:07:27 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 37Ca | Here is the run summary for the 37Ca beam
+ liq. H2 target setting.
We have obtained totally 65.7 hours data |
|
Fixed | e755 |
Mon Jul 2 23:09:55 2018 |
Pierre Louis | OFFLINE | General | Cryo-LH2 | 37Ca(p,d)36Ca | |
|
Fixed | e755 |
Mon Jul 2 23:29:32 2018 |
Louis Pierre | OTHER | Hardware | N/A | New division for CATS and plastic | Division for CATS and Plastic: 3x10^4
Plastic => Chanel 16 of GMT |
|
Fixed | e755 |
Tue Jul 3 10:47:01 2018 |
Louis | RUN | General | Cryo-LH2 | Run beam tuning | RUN 236:
started 10h46, stop at 11h09
|
|
Fixed | e755 |
Tue Jul 3 11:48:30 2018 |
Louis | RUN | General | Cryo-LH2 | Run 238 40Ca | RUN 238:
START 11h23 STOP 12h50
|
18x |
Fixed | e755 |
Tue Jul 3 13:37:19 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 239 | Run 239
start at 13h30, stop at 15h18
|
  |
Fixed | e755 |
Tue Jul 3 15:22:26 2018 |
Louis | RUN | General | Cryo-LH2 | RUN 240 | Run 240
start at 15h17, stop at
|
|
Fixed | e755 |
Tue Jul 3 17:54:44 2018 |
Louis | RUN | General | Cryo-LH2 | Run 241, 242 | RUN 241
start at 17h12, stop at 17h35
|
22x |
Fixed | e755 |
Tue Jul 3 17:55:01 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 40Ca + liq. H2 | We have obtained 6 hours data for the 40Ca
+ liq. hydogen setting today.
Note that we have already taken 15.6 hours |
|
Fixed | e755 |
Tue Jul 3 18:19:30 2018 |
daisuke | OTHER | General | N/A | Data saved after experiment | DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
|
7x |
Fixed | e755 |
Tue Jul 3 18:48:52 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here is the temperature log of the liquid
hydrogen target,
We kept it about 6 days. |
 |
Fixed | e755 |
Wed Jul 4 15:34:34 2018 |
Nori | BEAM | General | N/A | 37Ca PID at D6 | A particle identification plot of 37Ca from
LISE run 332. |
|
Pinned | e738 |
Wed Jul 4 17:10:28 2018 |
daisuke | DAQ | Software | N/A | Second VXI for CATS and syncrhonisation diagnosis | Second VXI crate was addedd for CATS. If the
synchronisation is not working, there will
be error messages in the display of the chassis |
8x |
Fixed | e738 |
Wed Jul 4 18:11:44 2018 |
louis, daisuke | RUN | General | 3-alpha | RUN 243 | MUST2 data taking with the 3 alpha source
(positioned downstream of the target to shoot
T1 to T8). |
   |
Fixed | e738 |
Wed Jul 4 18:43:29 2018 |
daisuke | RUN | General | 3-alpha | RUN 244 | 3 alpha source at 'off-beam-axis' position
(right center view from upstream). FAG ~40
Hz (mostly from T1-4) |
   |
Fixed | e738 |
Thu Jul 5 10:47:42 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e738 |
Thu Jul 5 10:49:40 2018 |
louis, serge, pierre, daisuke | RUN | General | 3-alpha | RUn 245 | 3 alpha source, off beam, low down position
. FAG 40 Hz. Likely due to beta rays (see
the attachment) |
    |
Fixed | e738 |
Thu Jul 5 11:08:04 2018 |
pierre, louis daisuke | RUN | General | N/A | RUN 249 | cats 1 pulser calibration. trigger cats1%1 |
 |
Fixed | e738 |
Thu Jul 5 14:12:18 2018 |
Louis | MUST2 | General | 3-alpha | RUN 253 calib alpha | |
    |
Pinned | e738 |
Thu Jul 5 18:33:54 2018 |
gilles,fred,J-C,daisuke | DAQ | Hardware | N/A | Caviar DAQ merged. | The VME crate of CAVIAR was integraded to
the DAQ controlled by the GMT master of MUST2.
|
    |
Fixed | e738 |
Thu Jul 5 19:22:18 2018 |
daisuke | RUN | General | 3-alpha | RUN 256 | 3 alpha measurement after merging CAVIAR vme
to the DAQ |
   |
Pinned | e738 |
Thu Jul 5 19:26:31 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
   |
Pinned | e738 |
Fri Jul 6 09:40:04 2018 |
daisuke | OTHER | General | N/A | kinematics plots | |
  |
Fixed | e738 |
Fri Jul 6 17:14:50 2018 |
daisuke | ONLINE | Software | N/A | Online analysis code: e755.detector | The file e755.detector was updated to include
the following parameters to ModularLeaf.
|
  |
Fixed | e738 |
Fri Jul 6 18:43:39 2018 |
Nori | ONLINE | Software | N/A | Online analysis code: e755.detector | The modular label file has to be modified.
lpcgrit:/home/e748/analysis/nptool/Projects/e755 |
|
Fixed | e738 |
Sat Jul 7 08:16:50 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
   |
Pinned | e738 |
Sat Jul 7 08:26:27 2018 |
Nori | BEAM | General | N/A | Beam production procedure | |
|
Pinned | e738 |
Sat Jul 7 08:29:53 2018 |
daisuke | OTHER | Social | N/A | Shift table | https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
|
Fixed | e738 |
Sat Jul 7 14:33:45 2018 |
shumpei takeshi megumi | TARGET | Hardware | Cryo-LH2 | Liquid H2 status | We start liquifying H2 at 14:09 and seems
to be filled at 14:29. |
|
Fixed | e738 |
Sat Jul 7 19:47:21 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
    |
Fixed | e738 |
Sun Jul 8 00:45:44 2018 |
takeshi | RUN | General | N/A | run summary | The runsummary for this E738 experiment is
available at the same place as previous e755
experiment.
|
|
Fixed | e738 |
Sun Jul 8 01:24:16 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 284 | start: 1h15
stop: 3h11
|
  |
Fixed | e738 |
Sun Jul 8 03:13:35 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 285 | start: 03h12
stop: 05h10
|
    |
Fixed | e738 |
Sun Jul 8 05:09:11 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 286 | start: 05h11
stop: 07h00 |
13x |
Fixed | e738 |
Sun Jul 8 07:00:46 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 287 | start: 07h01
stop: 08h55 |
8x |
Fixed | e738 |
Sun Jul 8 07:19:45 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 10C(p,d)9C and 10C(p,t)8C | Used data : Run 0284 & 0285 (about 4 hours
data)
CsI energy calibration parameters are from |
   |
Ongoing | e738 |
Sun Jul 8 08:53:44 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
  |
Fixed | e738 |
Sun Jul 8 09:14:18 2018 |
takeshi, Didier, Valérie | RUN | General | Cryo-LH2 | RUNS 288-290 | RUN 288
10C + liq H2
start 08h56 stop 10h56
|
11x |
Fixed | e738 |
Sun Jul 8 14:23:43 2018 |
Valérie | RUN | General | Cryo-LH2 | RUN Summary and MUST2, DAQ conditions | MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
|
12x |
Fixed | e738 |
Sun Jul 8 14:57:40 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 291 overview | Beam 10C between 9.10**4 and 10**5/s
dead time between 7 and 12%
Run 291 start 13h47 stop 15h51
|
14x |
Fixed | e738 |
Sun Jul 8 16:03:06 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 292 -still 10C | Beam 10C around 1. and 1.1 10**5/s
dead time between 6 and 12%
Run 292 start 15h51 stop 16h19 to change |
|
Fixed | e738 |
Sun Jul 8 16:28:56 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 293 | From Run 293 CATS1 HV = 640V I ~ 0.16 µA
; CATS2 660V I ~ 0.10 µA
Run 293 start 16h22; stop at 17h30
|
|
Fixed | e738 |
Sun Jul 8 17:36:47 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 294 | Run 294 start 17h31 stop 17h50 due to the
trip of CATS1.
748 Exxx 403M 8 juil. 17:50 run_0294.dat.08-07-18_17h31m47s
|
|
Fixed | e738 |
Sun Jul 8 17:59:12 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 295 | Run 295 start 17h52 stop at 19h52
Beam stop occurred during 19h39 and 19h42
(alarm at the machine)
|
26x |
Fixed | e738 |
Sun Jul 8 20:00:42 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 296 +(on-line) eff of CATS | Run 296 start 19h52 stop at 21h51
e748 Exxx 3,1G 8 juil. 21:51 run_0296.dat.08-07-18_19h52m46s
|
11x |
Pinned | e738 |
Sun Jul 8 21:05:50 2018 |
daisuke | OTHER | General | N/A | Phase space simulation: 10C(p,t)8C and 9C(p,d)8C | |
 |
Fixed | e738 |
Sun Jul 8 21:50:58 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 297 | Run 297 start 21h51 (8th July) stop at 0h
(9th July)
e748 Exxx 3,0G 9 juil. 00:00 run_0297.dat.08-07-18_21h50m55s
|
15x |
Fixed | e738 |
Mon Jul 9 00:03:24 2018 |
Benoit, Megumi, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 298 | Run 298 start 0h (9th July) stop at 02h02
e748 Exxx 2,9G 9 juil. 02:02 run_0298.dat.08-07-18_23h59m40s
Beam stop occurred from 01h06 to 01h09 (rotation |
    |
Fixed | e738 |
Mon Jul 9 00:25:30 2018 |
Nori | CATS | General | N/A | CATS tracking efficiency | We noticed that the tracking efficiency was
only 70% while the timing efficiencies were
around 95%.
|
8x |
Fixed | e738 |
Mon Jul 9 02:16:19 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 299 | Run 299 start 02h01 (9th July) stop at 04h03
e748 Exxx 2,9G 9 juil. 04:03 run_0299.dat.09-07-18_02h01m29s
|
  |
Fixed | e738 |
Mon Jul 9 04:22:21 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 300 | Run 300 start 04h02 (9th July) stop at 06h04
e748 Exxx 2,8G 9 juil. 06:05 run_0300.dat.09-07-18_04h02m08s
|
   |
Fixed | e738 |
Mon Jul 9 06:21:54 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 301 | Run 301 start 06h04 (9th July) stop at 7h51
|
 |
Fixed | e738 |
Mon Jul 9 07:55:05 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 302 | start: 07h53
stop: 08h19
|
   |
Fixed | e738 |
Mon Jul 9 08:00:11 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature log of the cyo H2
target during the 10C setting. |
 |
Fixed | e738 |
Mon Jul 9 08:55:13 2018 |
Pierre Daisuke | RUN | General | Empty | Run 303 | start: 08h27
stop: 08h50
|
|
Fixed | e738 |
Mon Jul 9 08:56:50 2018 |
Pierre Daisuke | RUN | General | Cryo-empty | Run 304 | start: 08h54
stop: 10h00
|
    |
Fixed | e738 |
Mon Jul 9 15:43:50 2018 |
Pierre Valérie | RUN | General | Cryo-empty | Run 309 | start: 15h36
stop: 16h10
|
 |
Fixed | e738 |
Mon Jul 9 17:18:55 2018 |
e748 | RUN | General | Cryo-empty | RUN 311 | Run 311
Beam/Detectors Tuning
|
13x |
Fixed | e738 |
Mon Jul 9 18:03:48 2018 |
Valérie Louis | RUN | General | Cryo-LH2 | RUN 312 | Run 312
First RUN of 9C on filled LH2 target
|
25x |
Fixed | e738 |
Mon Jul 9 19:16:13 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | RUN 313 to 316 | From RUN 313 to RUN 316:
Tuning dor the Drift Chamber:
|
|
Fixed | e738 |
Mon Jul 9 19:24:06 2018 |
Freddy Valérie Louis | RUN | General | Cryo-LH2 | RUN 317 | Run 317
start: 19h08 stop: 19h30
|
    |
Fixed | e738 |
Mon Jul 9 20:28:09 2018 |
Daisuke, Freddy, Louis, Valérie | RUN | General | Cryo-LH2 | RUNS 318 to 320 | From RUN 318 to RUN 320:
initial problem was that the stop process
was not correctly taken into account on Narval. |
  |
Fixed | e738 |
Mon Jul 9 20:33:00 2018 |
Daisuke Louis Valérie | RUN | General | Cryo-LH2 | RUN 321- ok again ! | Run 321 start 20:09
Total beam on CATS ~ 1.7 10**5 /s
Beam of 9C, 7Be, 8B and 6Li
|
20x |
Fixed | e738 |
Mon Jul 9 22:15:04 2018 |
DIdier Daisuke Nori Louis Valérie | RUN | General | Cryo-LH2 | RUN 322, strip CATS2 X 19 off | Run 322 start: 22h00 stop: 0h21
e748 Exxx 3,7G 10 juil. 00:21 run_0322.dat.09-07-18_21h58m34s
Beam: 9C
|
7x |
Ongoing | e738 |
Mon Jul 9 23:21:55 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature logs of the liquid
H2 target up to now.
I would share the log during the regeneration. |
  |
Fixed | e738 |
Mon Jul 9 23:25:10 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 10C beam | With 10C beam, we have obtained
31.7 hours of liq. H2 target and
1.2 hours of empty target.
|
|
Fixed | e738 |
Mon Jul 9 23:29:18 2018 |
Nori | CATS | General | Cryo-LH2 | CATS tracking efficiency | Analyzed run 312 (9C physics run). CATS calibration
files with lowered threshold values
(/home/e748/analysis/nptool/Projects/e755/Calibration/cats/CATS1_X.e738.npt, |
 |
Fixed | e738 |
Tue Jul 10 00:46:26 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 323 + Brho line settings | Run 323 start: 0h20 stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s
|
  |
Fixed | e738 |
Tue Jul 10 01:26:21 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 10C(p,d)9C and 10C(p,t)8C updated | Used data run run0284-0302 (almost all for
10C beam)
CsI calibration parameters are the same as |
6x |
Fixed | e738 |
Tue Jul 10 02:47:10 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 324 | Run 324 start: 2h45 stop 5h10
e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
|
24x |
Fixed | e738 |
Tue Jul 10 05:12:31 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 325 | Run 325 start: 5h10 stop 6h53 due to CATS1
-->tripping
e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
|
  |
Fixed | e738 |
Tue Jul 10 05:23:19 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 9C beam setting | Used data: run0312 (about 80 minutes data
taking).
Analysis for (p,d) channel and invariant |
  |
Fixed | e738 |
Tue Jul 10 05:25:42 2018 |
Shumpei | BEAM | General | Cryo-LH2 | triton contamination in the 9C beam setting | In MUST2 dE-E plot, strong locus for triton
E ~ 40 MeV exists.
Kinematics for triton bellow 45 MeV matches |
  |
Fixed | e738 |
Tue Jul 10 07:16:16 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 326 | Run 326 start: 6h59
Beam: 9C
|
9x |
Fixed | e738 |
Tue Jul 10 12:51:37 2018 |
marlène, olivier, J-C, daisuke | RUN | General | Cryo-LH2 | RUN 330 | 9C + liquid H. Data taking after replacing
CATS1.
12h03 started
|
28x |
Fixed | e738 |
Tue Jul 10 13:59:09 2018 |
jacques, daisuke, freddy | RUN | General | Cryo-LH2 | RUN 331 | 9C + liquid H
13h56 start. 12C 1.7 electric micro A.
16h51 stop |
6x |
Fixed | e738 |
Tue Jul 10 14:22:22 2018 |
Nori | BEAM | General | Cryo-LH2 | Beam image on target | Reconstructed beam images from run0330. |
  |
Fixed | e738 |
Tue Jul 10 15:17:21 2018 |
Nori | CATS | General | Cryo-LH2 | CATS tracking efficiency | Tracking efficiencies deduced from run 330
(after replacing CATS1).
|
|
Fixed | e738 |
Tue Jul 10 16:28:53 2018 |
daisuke | OTHER | Social | N/A | 6Li(p,d)5Li | The peak near 16 MeV was observed in a measurement
in the 1960s. The resonance is close to the
3He-d threshold. The narrow width indicates |
   |
Fixed | e738 |
Tue Jul 10 17:02:02 2018 |
jacques, daisuke, freddy, louis | RUN | General | Cryo-LH2 | RUN 332 | 12C primary: 1.7 uA
start: 16h52
stop: 17h52
|
  |
Fixed | e738 |
Tue Jul 10 18:23:01 2018 |
daisuke | OTHER | Social | N/A | mirror reaction of 7Be(p,d)6Be | |
 |
Fixed | e738 |
Tue Jul 10 21:26:48 2018 |
didier, daisuke | RUN | General | Cryo-LH2 | RUN 334 | 9C + liquid H. Probably nobody cares this
post right now, but the beam is back.
|
17x |
Fixed | e738 |
Tue Jul 10 23:14:31 2018 |
DD | RUN | General | Cryo-LH2 | RUN 335 | 9C + Liquid H run.
23h11 start. 1.7 electric micro A. Wien filter
1 kV.
|
|
Fixed | e738 |
Wed Jul 11 02:52:54 2018 |
Marlene | RUN | General | Cryo-LH2 | RUN336 | run336 start 1:07 / stop 2:48
fluctuations of beam intensity |
6x |
Fixed | e738 |
Wed Jul 11 02:55:44 2018 |
e748 | RUN | General | Cryo-LH2 | RUN 337 | RUN 337 start 2:49 /stop 4:09
Beam intensity CATS 200k pps |
  |
Ongoing | e738 |
Wed Jul 11 03:57:50 2018 |
e748 | OFFLINE | General | Cryo-LH2 | Conversion problem | Conversion of runs 335 gives the following
error (attached)
Size of raw file =3.5 Go
|
|
Fixed | e738 |
Wed Jul 11 04:16:04 2018 |
Nori | BEAM | General | Cryo-LH2 | Caviar status | Caviar is now operating at 700 V. TOF-CaviarX
position correlations are clearly seen (Attachment
1).
|
 |
Fixed | e738 |
Wed Jul 11 05:11:19 2018 |
e748 | RUN | General | Cryo-LH2 | RUN 338 | RUN 338
9C beam 200 k pps
start 4:09 /stop 5:10 |
|
Fixed | e738 |
Wed Jul 11 06:11:50 2018 |
e748 | RUN | General | Cryo-LH2 | RUN 339 | RUN 339
9C 210 k pps
start 5:11 / stop 6:08 (beam stopped) |
9x |
Fixed | e738 |
Wed Jul 11 06:17:19 2018 |
e748 | RUN | General | Cryo-LH2 | RUn 340 | RUn 340
start 6:10 / stop 7:43
|
|
Pending | e738 |
Wed Jul 11 06:29:00 2018 |
e748 | CATS | General | Cryo-LH2 | CATS2 status | CATS2 current fluctuates a lot and has increased
up to 0.26uA in run 340
In run 340 I observe that a second wire is |
 |
Fixed | e738 |
Wed Jul 11 07:49:12 2018 |
Marlène, Franck, Jacques, Daisuke | RUN | General | Cryo-LH2 | RUN 341 | RUn 341
start 7:44 /stop 9h29
|
  |
Fixed | e738 |
Wed Jul 11 08:18:00 2018 |
Nori | CATS | General | Cryo-LH2 | CATS efficiency | The tracking efficiency is diminishing probably
due to damaged CATS2. |
|
Ongoing | e738 |
Wed Jul 11 08:32:42 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Fixed | e738 |
Wed Jul 11 09:32:37 2018 |
Franck, Jacques, Daisuke | RUN | General | Cryo-LH2 | Run 342 | Wed 11 July 2018
Start @ 9:19
|
10x |
Fixed | e738 |
Wed Jul 11 12:02:14 2018 |
NPTeam | OFFLINE | General | Cryo-LH2 | Lauching parrallel analysis of multiple run | We made a parralel conversion script in the
conversion folder.
You can run up to 5 run in parallel using |
|
Fixed | e738 |
Wed Jul 11 12:04:29 2018 |
Franck, Jacques + CATS Team | CATS | General | N/A | Run 343 - CATS2 pulser calibration | Start 11:53
Stop 11:59
|
|
Fixed | e738 |
Wed Jul 11 13:24:34 2018 |
Daisuke,CATS team: Séb, Thom ; Franck, Pierre, Valérie | RUN | General | Cryo-LH2 | Runs 344-345 | Wed 11 July 2018
run 344 start 12h43 ; stop 13h03
e748 Exxx 900M 11 juil. 13:03 /data/e748X/e755/acquisition/run/run_0344.dat.11-07-18_12h43m33s
|
12x |
Fixed | e738 |
Wed Jul 11 14:51:13 2018 |
Daisuke, Franck, Shumpei, Valérie | RUN | General | Cryo-LH2 | Run 346 | Wed 11 July 2018
run 346 start 14h50; stop 15h14
748 Exxx 777M 11 juil. 15:14 /data/e748X/e755/acquisition/run/run_0346.dat.11-07-18_14h48m47s
|
|
Ongoing | e738 |
Wed Jul 11 15:41:33 2018 |
Franck, Jacques, Daisuke | RUN | General | Cryo-LH2 | Run 347 | Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV
|
   |
Fixed | e738 |
Wed Jul 11 16:51:50 2018 |
Nori | CATS | General | Cryo-LH2 | CATS efficiency | The tracking efficiency recovered after replacing
CATS2.
|
|
Ongoing | e738 |
Wed Jul 11 17:25:11 2018 |
Louis, Daisuke, Nori, Valérie | RUN | General | Cryo-LH2 | Run 348 | Run 348 Start 17h17
Beam: 9C at 2.3*10⁵pps in CATS1, 2uA |
   |
Fixed | e738 |
Wed Jul 11 18:31:23 2018 |
Jacques, Didier, Louis | RUN | General | Cryo-LH2 | Run 349 | Run 349
Start 18h22 Stop 18h47
|
6x |
Fixed | e738 |
Wed Jul 11 19:08:40 2018 |
Didier, Louis | RUN | General | Cryo-LH2 | RUN 350 | Run 350
Start 19h00 Stop 19h11
|
10x |
Fixed | e738 |
Wed Jul 11 19:17:20 2018 |
Didier, Louis | RUN | General | Cryo-LH2 | RUN 351 | Run 351
Start 19h14 Stop 19h53
|
    |
Fixed | e738 |
Wed Jul 11 20:00:01 2018 |
Didier, Valérie, Louis | RUN | General | Cryo-LH2 | RUN 352 | Run 352
Start 19h57 Stop 21h51
|
7x |
Fixed | e738 |
Wed Jul 11 21:55:23 2018 |
Daisuke, Didier, Valérie, Louis | RUN | General | Cryo-LH2 | RUN 353 | Run 353
Start 21h50 Stop
|
6x |
Fixed | e738 |
Wed Jul 11 23:36:27 2018 |
Didier, Louis, Freddy, Shumpei | RUN | General | Cryo-LH2 | RUN 354 | Run 354
Start 23h33 Stop 1h37
|
    |
Fixed | e738 |
Thu Jul 12 02:12:20 2018 |
Shumpei, Freddy | RUN | General | Cryo-LH2 | RUN 355 | [U][B]RUN 355[/B][/U]
start: 2h04
|
7x |
Fixed | e738 |
Thu Jul 12 04:40:32 2018 |
Shumpei | CATS | General | Cryo-LH2 | Analysis with only one of the CATSs | Analyzed data : run 0331
Used reaction : 7Be(p,d)6Be (ground state
and 2+ state 1.6 MeV are mainly populated).
|
   |
Fixed | e738 |
Thu Jul 12 05:03:49 2018 |
Shumpei, Freddy | RUN | General | Cryo-LH2 | RUN 356 | [U][B]RUN 356[/B][/U]
start: 4h24
|
7x |
Fixed | e738 |
Thu Jul 12 07:05:53 2018 |
Shumpei, Freddy, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 357 | [U][B]RUN 357[/B][/U]
start: 6h39
|
7x |
Fixed | e738 |
Thu Jul 12 07:43:25 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis of 9C beam setting | Used data : run0312-0355
For (p,t) reaction, the value of the mass |
  |
Fixed | e738 |
Thu Jul 12 08:16:21 2018 |
Daisuke, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 358 | [U][B]RUN 358[/B][/U]
start: 8h14 stop: 9h48
|
20x |
Fixed | e738 |
Thu Jul 12 09:52:07 2018 |
Daisuke, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 359 | RUN 359
start: 9h48 stop: 11h25
|
6x |
Fixed | e738 |
Thu Jul 12 11:28:46 2018 |
Daisuke, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 360 | RUN 360
e748 Exxx 3,4G 12 juil. 13:08 /data/e748X/e755/acquisition/run/run_0360.dat.12-07-18_11h24m44s
start: 11h25 stop: 13h08
|
10x |
Fixed | e738 |
Thu Jul 12 13:09:14 2018 |
Daisuke, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 361 | RUN 361
e748 Exxx 3,5G 12 juil. 15:01 /data/e748X/e755/acquisition/run/run_0361.dat.12-07-18_13h07m40s
start: 13h08 stop: 14h59
|
6x |
Ongoing | e738 |
Thu Jul 12 13:49:38 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Fixed | e738 |
Thu Jul 12 15:07:43 2018 |
Daisuke, Louis, Marlène, Megumi, Valérie | RUN | General | Cryo-LH2 | RUN 362-TRIGGER TESTS | RUN 362 WITH CHANGE OF TRIGGERS FOR TESTS
see below
e748 Exxx 1,7G 12 juil. 16:09 /data/e748X/e755/acquisition/run/run_0362.dat.12-07-18_15h08m50s
|
11x |
Fixed | e738 |
Thu Jul 12 15:27:56 2018 |
daiuske | MUST2 | General | N/A | MUST2*CATS coincidence trigger | Message from Adrien. |
 |
Fixed | e738 |
Thu Jul 12 16:22:43 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 363 | RUN 363
start: 16h09 stop: 18h10
|
10x |
Fixed | e738 |
Thu Jul 12 18:12:33 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 364 | RUN 364
start: 18h11 stop: 20h45
|
12x |
Pinned | e738 |
Thu Jul 12 18:47:32 2018 |
Nori | BEAM | General | N/A | Summary of Brho2 values |
Beam
Brho2 |
|
Fixed | e738 |
Thu Jul 12 20:47:32 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 365 | RUN 365
start: 20h46 stop: 22h43
|
10x |
Fixed | e738 |
Thu Jul 12 22:45:50 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 366 | RUN 366
start: 22h44 stop: 00h42
|
15x |
Fixed | e738 |
Fri Jul 13 00:45:45 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 367 | start: 00h44 |
|
Fixed | e738 |
Fri Jul 13 00:47:23 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 367 | RUN 367
start: 00h44
|
  |
Fixed | e738 |
Fri Jul 13 02:45:44 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 368 | RUN 368
start: 02h44
|
7x |
Fixed | e738 |
Fri Jul 13 04:09:10 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature of the target | We found the target temperature suddenly increased
at around 3:40 13th.
The online beam image is still indicating |
|
Fixed | e738 |
Fri Jul 13 04:48:19 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 369 | RUN 369
start: 04h47
|
7x |
Fixed | e738 |
Fri Jul 13 06:02:31 2018 |
takeshi, pierre | TARGET | General | Cryo-LH2 | target is half filled | We found the liquid hydrogen target is filled
only half during the run 368, around 4:10.
We will continue the measurement for now. |
 |
Fixed | e738 |
Fri Jul 13 09:03:11 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary 9C + H2 | Here is the run summary of the setting 9C
beam + liquid H2 target.
Up to now, we have obtained 78 hours data, |
|
Fixed | e738 |
Fri Jul 13 09:35:26 2018 |
Olivier, Serge, Jacques, J-C, thomas, shumpei, daisuke | RUN | General | Cryo-empty | RUN 370 | Empty target + 9C.
9h29 The beam is back. start 9h28 stop 11h21
e748 Exxx 2,1G 13 juil. 11:21 /data/e748X/e755/acquisition/run/run_0370.dat.13-07-18_09h28m21s |
 |
Fixed | e738 |
Fri Jul 13 13:41:48 2018 |
Daisuke, Jacques, Megumi, Olivier, Otsu, Takeshi, Valérie | RUN | General | Cryo-empty | RUNS 371-372 | Empty target + 9C.
Run 371 start 11h20 stop 13h20
e748 Exxx 2,1G 13 juil. 13:20 /data/e748X/e755/acquisition/run/run_0371.dat.13-07-18_11h20m03s
|
32x |
Fixed | e738 |
Fri Jul 13 16:41:49 2018 |
Antoine, Maurycy | OFFLINE | Social | Cryo-LH2 | Multiparticles from (p,t) up to 5 Light Charged Particles in Must ! | |
15x |
Fixed | e738 |
Fri Jul 13 18:07:04 2018 |
J-C, cristelle, nori, olivier, daisuke | RUN | General | Cryo-empty | RUN 373 | 12C 5+ beam. CATS2 trigger.
17h29 start
17h41 stop |
 |
Fixed | e738 |
Fri Jul 13 18:08:31 2018 |
J-C, cristelle, nori, olivier, daisuke | RUN | General | Cryo-empty | RUN 374 | 12C5+ beam. Trigger T1-8 + CATS1%30000 + CATS2%30000
+ Plastic%10000.
Target empty (under cooling).
|
6x |
Fixed | e738 |
Fri Jul 13 21:15:53 2018 |
J-C, nori, shumpei, takeshi, hide, didier, serge, daisuke | RUN | General | Cryo-empty | RUN 375: 12C pilot run | 12C beam + empty target after measurement
of 9C momentum distribution.
trigger t1-8 + cats 1 2 %30000 + plastic |
8x |
Fixed | e738 |
Fri Jul 13 22:00:59 2018 |
didier, nori, takeshi, shumpei, hide, daisuke | RUN | General | Cryo-LH2 | RUN 376: 12C first run | 12C + liquid H.
start 21h44
stop 22h43 |
22x |
Fixed | e738 |
Fri Jul 13 23:10:55 2018 |
e748 | RUN | General | Cryo-LH2 | run 377 | count rate in Cats : 100 kHz
Start time: 22:44
Stop: 00:42 |
13x |
Fixed | e738 |
Fri Jul 13 23:22:26 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | 12C beam analysis | Used data run0376 (about 1 hour)
Only target position and recoil pid (deuteron |
|
Fixed | e738 |
Sat Jul 14 00:32:55 2018 |
Shumpei | OFFLINE | General | Cryo-empty | empty target analysis for 9C beam setting | H2 filled: run0312-0355
empty: run0370-0372
|
   |
Fixed | e738 |
Sat Jul 14 01:24:51 2018 |
e748 | RUN | General | Cryo-LH2 | run 378 | count rate in Cats : 100 kHz
Start time: 00:42 |
  |
Fixed | e738 |
Sat Jul 14 02:46:34 2018 |
e748 | RUN | General | Cryo-LH2 | run 379 | count rate in Cats : 100 kHz
Start time: 02:41 |
 |
Fixed | e738 |
Sat Jul 14 05:00:37 2018 |
e748 | RUN | General | Cryo-LH2 | run 380 | count rate in Cats : 100 kHz
Start time: 04:38 |
 |
Fixed | e738 |
Sat Jul 14 06:49:03 2018 |
e748 | RUN | General | Cryo-LH2 | run 380 | count rate in Cats : 100 kHz
Start time: 06:39 |
    |
Fixed | e738 |
Sat Jul 14 09:57:36 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | target temperature during night | I would share the temperature log of the target
as it was liquefied 21:00 13th. |
|
Fixed | e738 |
Sat Jul 14 10:14:00 2018 |
marlène, jacques, daisuke | RUN | General | Cryo-LH2 | RUN 382 | 12C + liquid H. Before the run, the beam stopped
for 2 hours due to the gate valve of E9 shut
out the beam. This is because the manually |
9x |
Fixed | e738 |
Sat Jul 14 11:37:58 2018 |
marlène, daisuke | RUN | General | Cryo-LH2 | RUN 383 | 12C + liquid H.
11h33 start.
12h00 Asked PCP to increase the intensity. |
25x |
Fixed | e738 |
Sat Jul 14 14:01:55 2018 |
Daisuke, Jacques, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUNS 384-385 | 12C + liquid H.
RUN 384 start 13h58 stop 15h54
|
16x |
Fixed | e738 |
Sat Jul 14 18:18:33 2018 |
Daisuke, Jean-Charles, Megumi, Nori, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 386 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 2mm then +/-5 mm at the beginning
of the run
|
8x |
Fixed | e738 |
Sat Jul 14 18:36:38 2018 |
Daisuke, Jean-Charles, Megumi, Nori, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 387 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6µA TRIGGERS CATS2, PLASTIC div
|
|
Fixed | e738 |
Sat Jul 14 18:37:29 2018 |
Daisuke, Jean-Charles, Megumi, Nori, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 388 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6µA normal TRIGGERS MUST2 CATS div |
  |
Fixed | e738 |
Sat Jul 14 18:54:01 2018 |
Daisuke, Jean-Charles, Megumi, Nori, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 389 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 30 mm F43 opened
I ~ 1.6µA normal TRIGGERS MUST2 CATS div |
7x |
Fixed | e738 |
Sat Jul 14 19:01:22 2018 |
Daisuke, Jean-Charles, Megumi, Nori, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 390 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10
mm I~1.9 µA
|
7x |
Fixed | e738 |
Sat Jul 14 19:38:25 2018 |
Daisuke, Jean-Charles, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 391 TUNING 9C | 9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10
mm I~1.9 µA
|
 |
Fixed | e738 |
Sat Jul 14 20:16:50 2018 |
Daisuke, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 392 9C | 9C + liquid H.
RUN 392 start 19h46 stop 21h47
e748 Exxx 3,5G 14 juil. 21:49 /data/e748X/e755/acquisition/run/run_0392.dat.14-07-18_19h45m58s
|
21x |
Fixed | e738 |
Sat Jul 14 21:53:48 2018 |
Daisuke, Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 393 9C | 9C + liquid H.
RUN 393 start 21h48 stop 23h49
e748 Exxx 4,0G 14 juil. 23:49 /data/e748X/e755/acquisition/run/run_0393.dat.14-07-18_21h48m17s
|
9x |
Fixed | e738 |
Sun Jul 15 00:48:03 2018 |
takeshi | RUN | General | N/A | run summary | Here are the run summary of E738 experiment
up to 1:00 am 15th.
31.7 hours for 10C + H2
|
|
Fixed | e738 |
Sun Jul 15 00:49:52 2018 |
Megumi, Shumpei, Takeshi, Benoît, Valérie | RUN | General | Cryo-empty | RUN 394 9C | 9C + Empty target 15th JULY
RUN 394 start 0h43 stop 03h20
e748 Exxx 2,9G 15 juil. 2018 /data/e748X/e755/acquisition/run/run_0394.dat.15-07-18_00h43m25s
|
    |
Fixed | e738 |
Sun Jul 15 01:26:49 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature log of the target
before it was evaporated. |
 |
Fixed | e738 |
Sun Jul 15 01:35:09 2018 |
takeshi, Valérie | ONLINE | General | N/A | problem of the beam image on vigru | The beam image at the target is not clear
on online monitor.
We have confirmed that the target is correctly |
    |
Fixed | e738 |
Sun Jul 15 03:27:25 2018 |
Megumi, Benoît | RUN | General | Cryo-empty | RUN 395 9C | 9C + Empty target 15th JULY
RUN 395 start 03h20 stop 05h59
e748 Exxx 2,8G 15 juil. 06:01 /data/e748X/e755/acquisition/run/run_0395.dat.15-07-18_03h20m21s
|
    |
Fixed | e738 |
Sun Jul 15 06:17:04 2018 |
Megumi, Benoît | RUN | General | Cryo-empty | RUN 396 9C | 9C + Empty target 15th JULY
RUN 396 start 06h00 stop 7h59
|
8x |
Fixed | e738 |
Sun Jul 15 08:04:12 2018 |
daisuke | RUN | General | Cryo-empty | RUN 397 | 9C + empty.
08h00 start. 12C 1.8 micro A.
|
32x |
Fixed | e738 |
Sun Jul 15 10:04:13 2018 |
daisuke | RUN | General | Cryo-empty | RUN 398 | 9Cc + empty
10h01 start
|
|
Fixed | e738 |
Sun Jul 15 13:57:59 2018 |
daisuke | RUN | General | Cryo-empty | RUN 415 | 9C + empty run.
From 10 to 13h45, we had several issues with |
34x |
Fixed | e738 |
Sun Jul 15 19:05:20 2018 |
takeshi | RUN | General | N/A | run summary of E738 | Runsmmary of the E738 experiment.
31.7 hours for 10C + H2
1.2 hours for 10C + empty
|
|
Fixed | e738 |
Mon Jul 16 11:22:26 2018 |
thomas, daisuke | RUN | General | N/A | RUN 416 | CATS1 pulser calibration. trigger CATS1.
Attenuation 1/1, 1/2, 1/4, 1/5, 1/10 and
pedestal.v |
|
Fixed | e738 |
Mon Jul 16 11:23:55 2018 |
thomas, daisuke | RUN | General | N/A | RUN 417 | CATS2 pulser calibration. trigger CATS2.
Attenuation 1/1, 1/2, 1/4, 1/5, 1/10 and
pedestal. |
 |
Fixed | e738 |
Mon Jul 16 15:13:21 2018 |
daisuke | RUN | General | 3-alpha | RUN 419 | MUST2 3 alpha source at center
13h22 start
15h05 stop. |
  |
Fixed | e738 |
Mon Jul 16 16:13:00 2018 |
daisuke | RUN | General | 3-alpha | RUN 420 | MUST2 3 alpha shooting a bit left
15h10-16h08 |
   |
Fixed | e738 |
Mon Jul 16 16:44:43 2018 |
daisuke | RUN | General | 3-alpha | RUN 422 | MUST2 + 3 alpha shooting left |
|
Fixed | e738 |
Mon Jul 16 17:25:22 2018 |
daisuke | RUN | General | 3-alpha | RUN 422 | MUST2 + 3 alpha shooting right. |
  |
Fixed | e738 |
Mon Jul 16 18:46:34 2018 |
daisuke | RUN | General | 3-alpha | RUN 423 | MUST2 + 3 alpha shooting center. |
   |
Fixed | |
Tue Feb 26 12:16:10 2019 |
iulian freddy francois | MUST2 | Software | N/A | run 41 Calimero run MUVI 1 sector1X | [U][B]Run 41[/B][/U]
Calimero WORKS!! |
|