MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 52     Entry time: Wed Jun 21 09:05:26 2017
Author: Adrien Matta, Phil Adsley 
ExpNbr: e748 
Type: MUST2 
Category: General 
Status: Fixed 
Target-Source:  
Subject: MUST2 Dead Time 
We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in coincidence with the DT output of the GMT (entry 1), giving a direct reading of the dead time.

Note on MUST2 dead time:
- Without zero suppression the dead time caused by MUVI is 2ms. So this give a 40% DT at 180 counts per second.
- With zero suppression, the DT fall down to 240us (80us cash in to interrupt the CPU and, 80us to process the signal from MUVI to CAS and 80us to send the parameter back to the back plane). So this give a 5-7% DT with 180 counts per second.
- The ADC works in parallel of MUVI, so the DT are not cumulative.

ELOG Home Page