MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 40     Entry time: Sat Jun 17 10:22:43 2017
Author: Adrien Matta 
ExpNbr: e748 
Type: EXL 
Category: Hardware 
Status: Fixed 
Target-Source:  
Subject: EXL ADC gate 
EXL ADC is now setup with individual gate on the ADC.

We also put the threshold higher to reduce the rate and managed to work on timing.

We still think we need to delay the trigger output from the Mesytec module so the GMT is not triggered too soon.

However its appears that the trigger arrive 40-60us before the signal. Not sure if the AI output of the ADC is working properly, need to check this with Fred.


After checking the signal on the scope out of the MSC16 everything is in time.

ELOG Home Page