E748 Runs (around 3h30 for 1Go)
Run 323_2 started at 2h22 stop 5h56
r--r--r-- 1 e748 Exxx 1000M 5 juil. 05:56 run_0323.dat.04-07-17_19h25m59s.2
Run 323_3 started at 5h56 stop a
rw-r--r-- 1 e748 Exxx 400M 5 juil. 07:23 run_0323.dat.04-07-17_19h25m59s.3
--------------------------------------------------------------------------------------------
CHIO runs (around 1h10 for 4Go)
run 322_6 started at 2h20 stop at 3h30
-r--r--r-- 1 e748chio Exxx 4,0G 5 juil. 03:30 run_0322.dat.04-07-17_19h26m13s.6
run322_7 started at 3h30 stop at 4h41
-r--r--r-- 1 e748chio Exxx 4,0G 5 juil. 04:41 run_0322.dat.04-07-17_19h26m13s.7
run322_8 started at 4h41 stop at 05:52
-r--r--r-- 1 e748chio Exxx 4,0G 5 juil. 05:52 run_0322.dat.04-07-17_19h26m13s.8
run322_9 started at 5h52 stop at
-r--r--r-- 1 e748chio Exxx 4,0G 5 juil. 07:03 run_0322.dat.04-07-17_19h26m13s.9
-----------------------------------------------------------------------------------------
Reaction target CD2 position 3, 2.5 mg/cm2 same as before.
5h. The LISE rotating production target is ok ( 2257 tr/min)
All MUST2 HV ok but we should check the current of SiLi1/T5, it has increased.
5 July at 5h00:
SiLi1/T5 400V I ~ 24 ľA || SiLi2/T5 700V I ~ 1.8 ľA
SiLi1/T8 700V I ~ 2.9 ľA || SiLi2/T5 650V I ~ 4.8 ľA
---------------------------------------------
Dead time checked with the pulser on scalers: between 1 and 3%. |