MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 865     Entry time: Tue Jul 10 07:16:16 2018
Author: Shumpei, Valérie 
ExpNbr: e738 
Type: RUN 
Category: General 
Status: Fixed 
Target-Source: Cryo-LH2 
Subject: RUN 326 
Run 326 start: 6h59

Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4
Dead time between 8 and 15%
CATS2 X19 strip not running since Run 322
Total beam I 1.3 to 1.5 10**5 pps in CATS1, CATS2.
CATS2 700V 0.14 ľA.
I ~ 1.8uA to 2.0 ľA primary beam
We asked PCP to reduce to 1.7 ľA in order to avoid CATS1 tripping.
But CATS1 is continuously tripping even when we decrease the HV from 670 V to 660V then to 650V.
2 minutes ok see scalers at 7h18.
At 7h20 we try CATS1 HV 640V. Tripping.
At 8h02 we try again to put ON HV on CATS1. 640V ok, with I ~ 0.04 ľA (low value) for beam around 10**5 on CATS2.
It is running... (see un326_BeamTracksAt8h09.png )
With low efficiency, but at least we can check the beam trajectories. See Run326_BeamTracksAt8h09.png
Trip at 8h13.
Attachment 1: Run326_scalersAt7h03.png  36 kB  Uploaded Tue Jul 10 08:20:56 2018  | Hide | Hide all
Run326_scalersAt7h03.png
Attachment 2: Run326_scalersAt7h18.png  38 kB  Uploaded Tue Jul 10 08:21:03 2018  | Hide | Hide all
Run326_scalersAt7h18.png
Attachment 3: Run326_HVforCATStripCats1.png  44 kB  Uploaded Tue Jul 10 08:25:03 2018  | Hide | Hide all
Run326_HVforCATStripCats1.png
Attachment 4: Run326_CATSQraw.png  46 kB  Uploaded Tue Jul 10 08:41:43 2018  | Hide | Hide all
Run326_CATSQraw.png
Attachment 5: Run326_EdeIC_TOFCats2.png  17 kB  Uploaded Tue Jul 10 08:41:43 2018  | Hide | Hide all
Run326_EdeIC_TOFCats2.png
Attachment 6: Run326_ICDE1Tcats2caviar.png  37 kB  Uploaded Tue Jul 10 08:41:43 2018  | Hide | Hide all
Run326_ICDE1Tcats2caviar.png
Attachment 7: Run326_Tcats2.png  22 kB  Uploaded Tue Jul 10 08:41:43 2018  | Hide | Hide all
Run326_Tcats2.png
Attachment 8: Run326_scalersAt8h03.png  40 kB  Uploaded Tue Jul 10 09:09:44 2018  | Hide | Hide all
Run326_scalersAt8h03.png
Attachment 9: Run326_BeamTracksAt8h09.png  79 kB  Uploaded Tue Jul 10 09:09:51 2018  | Hide | Hide all
Run326_BeamTracksAt8h09.png

ELOG Home Page