MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
|
MUST2 |
Not logged in |
|
|
Message ID: 33
Entry time: Mon Jun 12 22:48:45 2017
|
Author: |
Valérie Lapoux |
ExpNbr: |
e748 |
Type: |
MUST2 |
Category: |
General |
Status: |
Fixed |
Target-Source: |
|
Subject: |
Tests of the DAQ with the Alpha Source |
|
|
12Th June. 3-peak Alpha source rotated towards the telescopes MM1 to MM4 (square wall of 4 telescopes).
MUVI configurations are fixed on the DAS. See pictures below. Thresholds : 402 keV.
We have DAS error messages for telescopes T2 and T7 with problems of data transmission, "I2C errors" = logic signals problems, maybe due to
bad cable connection inside the reaction chamber.
This problem should be fixed on 13th June looking at the cables in the chamber.
GMT trigger configuration: see picture, all telescopes T1 T3 T4 T5, T6 and T8.
T2 and T7 not included in the trigger inputs.
FAG window : 500 ns; Validation width 5.0 µs.
We can see the three peaks on the telescopes T1 T3 and T4 which are in the trigger (spectra taken during 30 minutes for checking).
T6 (in the trigger also) is placed at 90 deg and it can detect also some alphas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|