MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Entry  Sat Jun 23 19:23:19 2018, Nori, e755, OFFLINE, General, Fixed, Cryo-LH2, 40Ca(p,d) analysis 7x
    Reply  Sat Jun 23 20:07:49 2018, Nori, e755, OFFLINE, General, Fixed, Cryo-LH2, 40Ca(p,d) analysis 
Message ID: 619     Entry time: Sat Jun 23 19:23:19 2018     Reply to this: 621
Author: Nori 
ExpNbr: e755 
Type: OFFLINE 
Category: General 
Status: Fixed 
Target-Source: Cryo-LH2 
Subject: 40Ca(p,d) analysis 
Analysis of run0072 (two hours accumulation).

Attachment 1:
Reconstructed beam image. The ring should correspond to the cell's frame.

Attachment 2:
Definition of cuts. The central region of the target was selected and then named "targ".

Attachment 3:
Particle identification. Deuterons are well separated.

Attachment 4:
Elab-theta plot. The target and deuteron cuts were applied. Kinematics curves of the (p,d) reactions are seen.

Attachment 5:
Elab-theta again. Calculated kinematics curves were superimposed.
An energy correction factor of 0.8 has to be introduced to reproduce the curves (probably due to the incomplete energy calibration).
In addition to the ground-state transition, excited states with spectroscopic factors larger than 0.4 are also shown. See PRC 48, 95 (1993) for the details.

Attachment 6:
Angular distribution of 40Ca(d,p)39Ca(1/2+) from the reference. A similar oscillating pattern was observed in the Elab-theta plot.

EDIT: the deviation from the kinematics was due to an incorrect beam energy.
Attachment 1: run72_targ_log.png  34 kB  Uploaded Sat Jun 23 20:26:11 2018  | Hide | Hide all
run72_targ_log.png
Attachment 2: run72_targ_cuts.png  32 kB  Uploaded Sat Jun 23 20:26:15 2018  | Hide | Hide all
run72_targ_cuts.png
Attachment 3: run72_pid.png  99 kB  Uploaded Sat Jun 23 20:26:18 2018  | Hide | Hide all
run72_pid.png
Attachment 4: run72_etheta_dtarg.png  43 kB  Uploaded Sat Jun 23 20:26:35 2018  | Hide | Hide all
run72_etheta_dtarg.png
Attachment 5: run72_etheta_dtarg_kinema_adj.png  51 kB  Uploaded Sat Jun 23 20:26:48 2018  | Hide | Hide all
run72_etheta_dtarg_kinema_adj.png
Attachment 6: Screen_Shot_2018-06-23_at_14.08.37.png  39 kB  Uploaded Sat Jun 23 20:27:23 2018  | Hide | Hide all
Screen_Shot_2018-06-23_at_14.08.37.png
Attachment 7: Screen_Shot_2018-06-23_at_14.08.54.png  171 kB  Uploaded Sat Jun 23 21:00:49 2018  | Hide | Hide all
Screen_Shot_2018-06-23_at_14.08.54.png

ELOG Home Page