MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 476     Entry time: Fri May 25 08:37:04 2018
Author: Adrien Matta 
ExpNbr: e744 
Type: MUST2 
Category: Hardware 
Status: Fixed 
Target-Source: N/A 
Subject: MUST2 cooling 
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
Alcohol level checked, look OK.

ELOG Home Page