MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Entry  Wed May 30 00:17:02 2018, Valérie, Louis, e744, RUN, General, Fixed, CH2, Run #2114 8x
    Reply  Wed May 30 01:15:58 2018, Valérie, Louis, e744, RUN, General, Fixed, CH2, Run #2115 6x
Message ID: 557     Entry time: Wed May 30 00:17:02 2018     Reply to this: 558
Author: Valérie, Louis 
ExpNbr: e744 
Type: RUN 
Category: General 
Status: Fixed 
Target-Source: CH2 
Subject: Run #2114 
RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Evening shift team: Louis Valérie (Online)

Beam intensity around 10**5 pps decreasing to 80-70k pps around 1h30 then coming again to 95k pps at 1h40
Between 2h48 and 2h50 beam was decresaing down to few 1000/s on CATS, due to some alarms on the beam line, slowly increasing again after 2h52.
cf current of T4 around 13-14 µA Strong increase around 13 µA (due to the stabilization of the beam rate at 10**5 pps !)

------------------------------------------------------------------------------------------------------------------------------------------
NB: The E_TOF plots for MM1 and MM3 seem to count less than the MM2 and MM4 plots, nearly factor 10 below for MM1, and factor 5 below for MM3.
But the raw spectra for StrXT of MM1 and MM3 have quite the same statistics (see integral values) maybe some software problems.
Check how the TOF parameter is done in the offline (from XT or YT +thresholds and pattern conditions).
The same behaviour was seen in the previous runs.
Attachment 1: Run2114_initScalers.png  92 kB  Uploaded Wed May 30 01:21:43 2018  | Hide | Hide all
Run2114_initScalers.png
Attachment 2: Run2114_MMimpactAT1h42.png  54 kB  Uploaded Wed May 30 03:00:51 2018  | Hide | Hide all
Run2114_MMimpactAT1h42.png
Attachment 3: Run2114_EXLCsIcorrelPPT_QTfag.png  67 kB  Uploaded Wed May 30 03:01:04 2018  | Hide | Hide all
Run2114_EXLCsIcorrelPPT_QTfag.png
Attachment 4: Run2114_TimingRefFAGppt.png  40 kB  Uploaded Wed May 30 03:01:15 2018  | Hide | Hide all
Run2114_TimingRefFAGppt.png
Attachment 5: Run2114_MMStrXT.png  71 kB  Uploaded Wed May 30 03:03:59 2018  | Hide | Hide all
Run2114_MMStrXT.png
Attachment 6: Run2114_MMStrYT.png  70 kB  Uploaded Wed May 30 03:04:50 2018  | Hide | Hide all
Run2114_MMStrYT.png
Attachment 7: Run2114_ETOFmm1toMM4.png  49 kB  Uploaded Wed May 30 03:06:35 2018  | Hide | Hide all
Run2114_ETOFmm1toMM4.png
Attachment 8: Run2114_scalersEndRun.png  88 kB  Uploaded Wed May 30 04:01:36 2018  | Hide | Hide all
Run2114_scalersEndRun.png

ELOG Home Page