MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 11     Entry time: Thu Jun 1 09:32:38 2017
Author: Adrien Matta 
ExpNbr: e748 
Type: MUST2 
Category: Hardware 
Status: Fixed 
Target-Source:  
Subject: MUST2 cabling scheme 
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.

Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.

Telescope 5 to 8 are on the large distribution box and the second HV card. This correspond to the port side flange.

CAEN SY1527 setting has been changed accordingly.

ELOG Home Page