MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 144     Entry time: Mon Jul 3 20:42:14 2017
Author: Valérie L 
ExpNbr: e748 
Type: RUN 
Category: General 
Status: Fixed 
Target-Source: CD2 
Subject: Conditions for data runs, Run 223 
Triggers for the experiments :MM1...MM8,
CATS1 div, Cats2div Plast div
All divisions on triggers are set at 100.
CATS1 HV= 700V (I~1ľA) ; CATS2 700V HV
-----------------------------------------------------------------
PRODUCTION TARGET
rotating target Be 2000 ľm; 31.9deg ; 2110 tr/min

Brho1 (RMN) = 2.6687 T.m
Wedge inserted --> Brho2 (RMN) = 2.3868 T.m
DAP = 238 A

Beam purity ~99%
Yields of 12Be on D4 1.3 10**4 / 1 eľA
-----------------------------------------------------------------
We are ready for the data runs till the end of run 222 at 20h39.
the PCP was called by the LISE team to increase the beam current at 2 eľA.
Beam sent at 20h54 for run 223
-----------------------------------------------------------------
Run 223 (checked with Ganil Tape OK) 3rd JULY START 20h53 ; STOP at 21h16
rw-r--r-- 1 e748 Exxx 307494912 3 juil. 21:16 run_0223.dat.03-07-17_20h53m39s run with 2 eľA
The run 223 is stopped to increase beam current at 3 ľA.
-->21h25 3 eľA
-----------------------------------------------------------------

Detector conditions
CHIO 393 mbar
Attachment 1: TriggRun223AllMust2CatsPlast.png  37 kB  Uploaded Mon Jul 3 21:43:45 2017  | Hide | Hide all
TriggRun223AllMust2CatsPlast.png

ELOG Home Page