MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 435     Entry time: Wed May 23 20:52:01 2018
Author: Iulian Valerian 
ExpNbr: e744 
Type: RUN 
Category: General 
Status: Ongoing 
Target-Source:  
Subject: run #429 and #430 and config gmt 
Changed VAL from 2 us to 2.5 us

run #429 exl ppt triggers

run #430 exl ppt triggers. Changed val on gmtslave also

The correlation between MUST and PPT (run430_E_PPT_vs_T_PPT.pdf) is due to the beta decay of 138La (internal contamination in the LaBr crystal). PPT detects the beta energy with 100% eff, while the gamma rays - emitted in the beta decay process- interacted in MUST detectors. The EXL bidim shows only random events (no internal contamination).
Attachment 1: config_gmt.png  24 kB  Uploaded Thu May 24 00:31:51 2018  | Hide | Hide all
config_gmt.png
Attachment 2: config_gmtslave.png  25 kB  Uploaded Thu May 24 00:40:06 2018  | Hide | Hide all
config_gmtslave.png
Attachment 3: run430_E_PPT_vs_T_PPT.pdf  24 kB  Uploaded Thu May 24 17:33:56 2018  | Hide | Hide all
run430_E_PPT_vs_T_PPT.pdf
Attachment 4: run430_E_PPT_proj.pdf  17 kB  Uploaded Thu May 24 17:34:11 2018  | Hide | Hide all
run430_E_PPT_proj.pdf
Attachment 5: run430_E_EXL_vs_T_EXLor.pdf  19 kB  Uploaded Thu May 24 17:34:23 2018  | Hide | Hide all
run430_E_EXL_vs_T_EXLor.pdf

ELOG Home Page