MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 487     Entry time: Fri May 25 21:34:19 2018
Author: e744 Iulan, Fairouz, Valerie 
ExpNbr: e744 
Type: DAQ 
Category: Hardware 
Status: Fixed 
Target-Source: CH2 
Subject: Problem of FAG validation +change of ADC parameter for TAC signal 
The Time signal MM_PPT is now in the parameter MCP_HF of the ADC.
The problem was on the FAG signal validation (bad output of the discriminator)

the TAC MM_PPT with start FAG and STOP ppt is now coded in the entry of ADC MCP_HF , add=9 (channel 10)
Previously it was add =3 (channel 4).

Problem of DAQ encountered in the evening (20 pm) no DAQ counting, no FAG from GMT: we first reboot on software (Terminal iolan: iolan must2 all; reboot).
but the DAQ was still blocked.
We phoned to the hardware astreinte (Charles H), he told us to reset the hardware.
The problem was solved by resetting the crates (reset button on the crates ganlx1 and ganlx14 in D6).
The DAQ restarted correctly.
Attachment 1: ProblemGMTtriggerVXI.png  147 kB  Uploaded Sat May 26 02:39:16 2018  | Hide | Hide all
ProblemGMTtriggerVXI.png

ELOG Home Page