Message ID: 853
Entry time: Mon Jul 9 20:28:09 2018
|
Author: |
Daisuke, Freddy, Louis, Valérie |
ExpNbr: |
e738 |
Type: |
RUN |
Category: |
General |
Status: |
Fixed |
Target-Source: |
Cryo-LH2 |
Subject: |
RUNS 318 to 320 |
|
|
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running.
We killed Narval.
It was impossible to initialize or start run correctly.We did Several kna, kall.
Bugs on the run control server (ps -edf |grep narval or start_acq showed several on-going processes. We removed them). Then the CATS1 crate was not initialized correctly, it remained Offline.
see ProblemDAQcrateCATS1RCAt20h.png ProblemDAQcrateCATS1iolan.png
We rebooted (software mode on Iolan) CATS1 VXI crate, then init..;breakup...init then tried to start but stopped because because we noted merger problems.
See ProblemMergerCATSbranch.png
Then we needed to reinitialize a third time the Narval run control bto recover a correct Run control operation.
Fred S. came to check that we worked well... and that everything was working well. |
|
|
|
|
|
|