MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2  Not logged in MUST2
Message ID: 91     Entry time: Fri Jun 30 16:55:04 2017
Author: Valérie Lapoux 
ExpNbr: e748 
Type: DAQ 
Category: General 
Status: Fixed 
Target-Source:  
Subject: Run control for global DAQ with NUMEXO 
The run start/stop sequence for the global DAQ including the NUMEXO:

I. ssh e748chio@ganp976
pw (same as for the experiment)
II. start_acq e748chio
-->the RC window of the e748chio is opened
III. START (on the RC e748chio)
IV. START (on the RC e748)
V. STOP (on the RC e748)
VI. STOP (on the RC e748chio)
==================================================================================
Attachment 1: RunControlAll748ModeMonitoring.png  76 kB  Uploaded Fri Jun 30 18:01:01 2017  | Hide | Hide all
RunControlAll748ModeMonitoring.png
Attachment 2: NarvalRunControlAllE748.png  74 kB  Uploaded Fri Jun 30 18:53:05 2017  | Hide | Hide all
NarvalRunControlAllE748.png

ELOG Home Page