RUN 382 |
|
|
12C + liquid H. Before the run, the beam stopped for 2 hours due to the gate valve of E9 shut out the beam. This is because the manually operate turbo pump was turned off by itself due to unknown reason. Sébastien came to close the valve of this turbo pump and evacuate E9 using another turbo pump only. The vacuum of E9 is about 4e-5 mbar as of 9 am.The interlock is set at 9e-5 mbar.
09h27 start
10h30 increased primary beam intensity slightly. Before 80 kpps on plastic, after 95 kpps. Leakage current of CATs 0.10/0.08 micro A to 0.12/0.10 micro A.
11h35 stop. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|