Fixed, e738, Tue Jul 10 07:16:16 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 326 9x
|
Run 326 start: 6h59
Beam: 9C
|
Fixed, e738, Thu Jul 12 07:05:53 2018, Shumpei, Freddy, Megumi, Valérie, RUN, General, Cryo-LH2, RUN 357 7x
|
[U][B]RUN 357[/B][/U]
start: 6h39
|
Fixed, e738, Thu Jul 12 02:12:20 2018, Shumpei, Freddy, RUN, General, Cryo-LH2, RUN 355 7x
|
[U][B]RUN 355[/B][/U]
start: 2h04
|
Fixed, e738, Thu Jul 12 05:03:49 2018, Shumpei, Freddy, RUN, General, Cryo-LH2, RUN 356 7x
|
[U][B]RUN 356[/B][/U]
start: 4h24
|
Fixed, e748, Sat Jul 8 08:39:37 2017, Shumpei, Daisuke, OFFLINE, General, CD2, 12Be(d,t)?  
|
/home/e748/analysis/nptool/Outputs/Analysis/runtest.root (run_0331_0.root?) was analyzed.
DSSD energy vs theta_lab plot for triton is attatched.
The gates to select triton are also shown.
|
Fixed, e748, Sun Jul 9 10:27:09 2017, Shumpei, Daisuke, OFFLINE, General, CD2, 12Be(d,t) 
|
More statistics for (d,t) channel.
Same gate as before () but MM1&MM4 are used. |
Fixed, e748, Sun Jul 9 10:29:20 2017, Shumpei, Daisuke, OFFLINE, General, CD2, 12Be(d,t) 
|
More statistics for (d,t) channel.
Same gate as before (Message ID: 273 Entry time: Sat Jul 8 08:39:37 2017) but MM1&MM4 are used.
Figures are with 12Be(d,t) kinematics for all events and (events per bin)>6.
|
Fixed, e748, Sun Jul 9 11:56:31 2017, Shumpei, Daisuke, OFFLINE, General, CD2, 12Be(d,t)
|
[quote="Shumpei, Daisuke"]More statistics for (d,t) channel.
Same gate as before (Message ID: 273 Entry time: Sat Jul 8 08:39:37 2017) but MM1&MM4 are used.
Figures are with 12Be(d,t) kinematics for all events and (events per bin)>6.
|
Fixed, e748, Sun Jul 9 13:42:26 2017, Shumpei, Daisuke, OFFLINE, General, CD2, 10Be(d,t) & 10Be(d,3He)?  
|
Same analysis for (d,t) channel but 10 Be beam. run368-374.4 (-1 day data)
Separation for Z=3&4 with CHIO(analog) + plastic is difficult so Z=4 gate may include Z=3&4.
Figures are with 10Be(d,t)9Be and 10Be(d,3He)9Li kinematics for all events and (events per bin)>4. |
Fixed, e748, Sun Jul 9 16:44:58 2017, Shumpei, Daisuke, OFFLINE, General, CD2, Elastic scattering MM6&7
|
Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope (CsI veto and beam position gate on target) is shown.
For MM6 (left), a locus for punch-through is seen maybe because CsI veto gate is not so good.
|
Fixed, e748, Fri Jul 7 00:42:50 2017, Shumpei, MUST2, Software, CD2, Calibration for CsI
|
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Method;
Gate DSSD (300 um) energy = 2 MeV. This corresponds to
|
Fixed, e748, Fri Jul 7 00:43:51 2017, Shumpei, MUST2, Software, CD2, Calibration for CsI
|
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Method;
Gate DSSD (300 um) energy = 2 MeV. This corresponds to
|
Fixed, e755, Sat Jun 30 15:07:43 2018, Shumpei, OFFLINE, General, Cryo-LH2, 37Ca (p,d) 36Ca 
|
37Ca (p,d) 36Ca reaction is analyzed (run 191-195).
Gate condition;
|
Fixed, e738, Sun Jul 8 07:19:45 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C   
|
Used data : Run 0284 & 0285 (about 4 hours data)
CsI energy calibration parameters are from previous experiment, optimized for deuteron
|
Fixed, e738, Tue Jul 10 01:26:21 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C updated 6x
|
Used data run run0284-0302 (almost all for 10C beam)
CsI calibration parameters are the same as E755 exp (deuteron optimized),
|
Fixed, e738, Tue Jul 10 05:23:19 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 9C beam setting  
|
Used data: run0312 (about 80 minutes data taking).
Analysis for (p,d) channel and invariant mass
|
Fixed, e738, Tue Jul 10 05:25:42 2018, Shumpei, BEAM, General, Cryo-LH2, triton contamination in the 9C beam setting  
|
In MUST2 dE-E plot, strong locus for triton E ~ 40 MeV exists.
Kinematics for triton bellow 45 MeV matches the kinematics of triton 40MeV beam proton elastic scattering.
If coincidence of proton required, still exists for some region (proton forward scattering with enough energy to pass through DSSD).
|
Fixed, e738, Thu Jul 12 04:40:32 2018, Shumpei, CATS, General, Cryo-LH2, Analysis with only one of the CATSs   
|
Analyzed data : run 0331
Used reaction : 7Be(p,d)6Be (ground state and 2+ state 1.6 MeV are mainly populated).
|
Fixed, e738, Thu Jul 12 07:43:25 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis of 9C beam setting  
|
Used data : run0312-0355
For (p,t) reaction, the value of the mass for N=1 isotone is taken from proposal, so it can be shifted.
|
Fixed, e738, Fri Jul 13 23:22:26 2018, Shumpei, OFFLINE, General, Cryo-LH2, 12C beam analysis
|
Used data run0376 (about 1 hour)
Only target position and recoil pid (deuteron or triton) is gated.
|
|