Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Pinned | e738 |
Fri Jul 6 09:40:04 2018 |
daisuke | OTHER | General | N/A | kinematics plots | |
  |
Fixed | e738 |
Fri Jul 6 17:14:50 2018 |
daisuke | ONLINE | Software | N/A | Online analysis code: e755.detector | The file e755.detector was updated to include
the following parameters to ModularLeaf.
|
  |
Fixed | e738 |
Fri Jul 6 18:43:39 2018 |
Nori | ONLINE | Software | N/A | Online analysis code: e755.detector | The modular label file has to be modified.
lpcgrit:/home/e748/analysis/nptool/Projects/e755 |
|
Fixed | e738 |
Sat Jul 7 08:16:50 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
   |
Pinned | e738 |
Sat Jul 7 08:26:27 2018 |
Nori | BEAM | General | N/A | Beam production procedure | |
|
Pinned | e738 |
Sat Jul 7 08:29:53 2018 |
daisuke | OTHER | Social | N/A | Shift table | https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
|
Fixed | e738 |
Sat Jul 7 14:33:45 2018 |
shumpei takeshi megumi | TARGET | Hardware | Cryo-LH2 | Liquid H2 status | We start liquifying H2 at 14:09 and seems
to be filled at 14:29. |
|
Fixed | e738 |
Sat Jul 7 19:47:21 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT | |
    |
Fixed | e738 |
Sun Jul 8 00:45:44 2018 |
takeshi | RUN | General | N/A | run summary | The runsummary for this E738 experiment is
available at the same place as previous e755
experiment.
|
|
Fixed | e738 |
Sun Jul 8 01:24:16 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 284 | start: 1h15
stop: 3h11
|
  |
Fixed | e738 |
Sun Jul 8 03:13:35 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 285 | start: 03h12
stop: 05h10
|
    |
Fixed | e738 |
Sun Jul 8 05:09:11 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 286 | start: 05h11
stop: 07h00 |
13x |
Fixed | e738 |
Sun Jul 8 07:00:46 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 287 | start: 07h01
stop: 08h55 |
8x |
Fixed | e738 |
Sun Jul 8 07:19:45 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 10C(p,d)9C and 10C(p,t)8C | Used data : Run 0284 & 0285 (about 4 hours
data)
CsI energy calibration parameters are from |
   |
Ongoing | e738 |
Sun Jul 8 08:53:44 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
  |
Fixed | e738 |
Sun Jul 8 09:14:18 2018 |
takeshi, Didier, Valérie | RUN | General | Cryo-LH2 | RUNS 288-290 | RUN 288
10C + liq H2
start 08h56 stop 10h56
|
11x |
Fixed | e738 |
Sun Jul 8 14:23:43 2018 |
Valérie | RUN | General | Cryo-LH2 | RUN Summary and MUST2, DAQ conditions | MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
|
12x |
Fixed | e738 |
Sun Jul 8 14:57:40 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 291 overview | Beam 10C between 9.10**4 and 10**5/s
dead time between 7 and 12%
Run 291 start 13h47 stop 15h51
|
14x |
Fixed | e738 |
Sun Jul 8 16:03:06 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 292 -still 10C | Beam 10C around 1. and 1.1 10**5/s
dead time between 6 and 12%
Run 292 start 15h51 stop 16h19 to change |
|
Fixed | e738 |
Sun Jul 8 16:28:56 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 293 | From Run 293 CATS1 HV = 640V I ~ 0.16 ľA
; CATS2 660V I ~ 0.10 ľA
Run 293 start 16h22; stop at 17h30
|
|