Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Pinned | e738 |
Fri Jul 6 09:40:04 2018 |
daisuke | OTHER | General | N/A | kinematics plots |
|
Attachment 1: pt_kinema_30deg_1050um.pdf
|
|
Attachment 2: pt_kinema_30deg_2250um.pdf
|
|
Attachment 3: pt_kinema_30deg_750um_7be.pdf
|
|
Fixed | e738 |
Fri Jul 6 17:14:50 2018 |
daisuke | ONLINE | Software | N/A | Online analysis code: e755.detector |
The file e755.detector was updated to include the following parameters to ModularLeaf.
CAVIAR_1_16
CAVIAR_17_32
CAVIAR_33_48
CAVIAR_49_64
CAVIAR_65_80
CAVIAR_81_96 |
Attachment 1: screenshot_2018-07-06_17h14m09s.png
|
|
Attachment 2: screenshot_2018-07-06_17h14m25s.png
|
|
Attachment 3: screenshot_2018-07-06_17h16m43s.png
|
|
Fixed | e738 |
Fri Jul 6 18:43:39 2018 |
Nori | ONLINE | Software | N/A | Online analysis code: e755.detector |
The modular label file has to be modified.
lpcgrit:/home/e748/analysis/nptool/Projects/e755 $ cat ModularLabel_new.txt
GATCONFMASTER
GATCONFSLAVE
DATATRIG_CATS
TGV_CONFDEC
AGAVA_LTAGH
AGAVA_LTAGL_UP
AGAVA_LTAGL
PLASTIC_Q
T_CATS1_HFdiv
T_CATS1_HF
T_CATS2_HF
T_CATS2_CATS1
T_MM_CATS1
T_MM_CATS2
T_CATS1_Plast
T_CATS2_Plast
T_CATS1_CAVIAR
T_CATS2_CAVIAR
E_D4
E1_D6
E2_D6
T_D4_HF
T1_D6_HF
T2_D6_HF
T_E1D6_CAVIAR
T_CATS_HF_LISE
T_D6_CATS
SCALER_DT
SCALER_CATS1
SCALER_CATS2
SCALER_CAVIAR
SCALER_PLASTIC
SCALER_100Hz
ADC2_VOIE_0
ADC2_VOIE_1
ADC2_VOIE_2
ADC2_VOIE_3
ADC2_VOIE_4
ADC2_VOIE_5
CAVIAR_1_16
CAVIAR_17_32
CAVIAR_33_48
CAVIAR_49_64
CAVIAR_65_80
CAVIAR_81_96
This file is symlinked to /home/e748/analysis/nptool/Projects/e755/conversion/ModularLabel.txt.
We confirmed Caviar data is accessible (see Attachment). |
Attachment 1: Capture_du_2018-07-06_18-46-31.png
|
|
Fixed | e738 |
Sat Jul 7 08:16:50 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT |
|
Attachment 1: screenshot_2018-07-07_08h15m39s.png
|
|
Attachment 2: screenshot_2018-07-07_08h15m54s.png
|
|
Attachment 3: screenshot_2018-07-07_08h16m04s.png
|
|
Attachment 4: screenshot_2018-07-07_08h16m13s.png
|
|
Pinned | e738 |
Sat Jul 7 08:26:27 2018 |
Nori | BEAM | General | N/A | Beam production procedure |
|
Attachment 1: e738beamproduction.pdf
|
|
Pinned | e738 |
Sat Jul 7 08:29:53 2018 |
daisuke | OTHER | Social | N/A | Shift table |
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
Attachment 1: 2018-05-08_lise_must2_crypta_schedule_-_Shift_(July_7_to_15).pdf
|
|
Fixed | e738 |
Sat Jul 7 14:33:45 2018 |
shumpei takeshi megumi | TARGET | Hardware | Cryo-LH2 | Liquid H2 status |
We start liquifying H2 at 14:09 and seems to be filled at 14:29. |
Attachment 1: liquefying0707.png
|
|
Fixed | e738 |
Sat Jul 7 19:47:21 2018 |
daisuke | MUST2 | Hardware | N/A | MUST2 BT/HT |
|
Attachment 1: screenshot_2018-07-07_19h46m29s.png
|
|
Attachment 2: screenshot_2018-07-07_19h46m19s.png
|
|
Attachment 3: screenshot_2018-07-07_19h46m00s.png
|
|
Attachment 4: screenshot_2018-07-07_19h45m41s.png
|
|
Attachment 5: screenshot_2018-07-07_19h45m13s.png
|
|
Fixed | e738 |
Sun Jul 8 00:45:44 2018 |
takeshi | RUN | General | N/A | run summary |
The runsummary for this E738 experiment is available at the same place as previous e755 experiment.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919 |
Fixed | e738 |
Sun Jul 8 01:24:16 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 284 |
start: 1h15
stop: 3h11
beam: 10C at about 90000 pps |
Attachment 1: scaler_2018-07-08_01h25m36s.png
|
|
Attachment 2: visu_2018-07-08_01h26m12s.png
|
|
Attachment 3: scaler_2018-07-08_03h10m42s.png
|
|
Fixed | e738 |
Sun Jul 8 03:13:35 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 285 |
start: 03h12
stop: 05h10
Beam about 1*10^5 pps |
Attachment 1: scaler_2018-07-08_03h13m06s.png
|
|
Attachment 2: visu_2018-07-08_03h19m50s.png
|
|
Attachment 3: visu_2018-07-08_03h19m13s.png
|
|
Attachment 4: visu_2018-07-08_03h19m27s.png
|
|
Attachment 5: visu_2018-07-08_03h20m19s.png
|
|
Fixed | e738 |
Sun Jul 8 05:09:11 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 286 |
start: 05h11
stop: 07h00 |
Attachment 1: scaler_2018-07-08_05h11m32s.png
|
|
Attachment 2: visu_2018-07-08_05h18m15s.png
|
|
Attachment 3: visu_2018-07-08_05h18m21s.png
|
|
Attachment 4: visu_2018-07-08_05h18m25s.png
|
|
Attachment 5: visu_2018-07-08_05h19m10s.png
|
|
Attachment 6: visu_2018-07-08_05h15m24s.png
|
|
Attachment 7: visu_2018-07-08_05h18m08s.png
|
|
Attachment 8: visu_2018-07-08_05h18m53s.png
|
|
Attachment 9: visu_2018-07-08_05h19m01s.png
|
|
Attachment 10: visu_2018-07-08_05h15m14s.png
|
|
Attachment 11: visu_2018-07-08_05h15m19s.png
|
|
Attachment 12: visu_2018-07-08_05h18m39s.png
|
|
Attachment 13: visu_2018-07-08_05h18m46s.png
|
|
Fixed | e738 |
Sun Jul 8 07:00:46 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 287 |
start: 07h01
stop: 08h55 |
Attachment 1: scaler_2018-07-08_07h01m51s.png
|
|
Attachment 2: visu_2018-07-08_07h06m42s.png
|
|
Attachment 3: visu_2018-07-08_07h06m49s.png
|
|
Attachment 4: visu_2018-07-08_07h07m03s.png
|
|
Attachment 5: visu_2018-07-08_07h07m43s.png
|
|
Attachment 6: visu_2018-07-08_07h07m49s.png
|
|
Attachment 7: visu_2018-07-08_07h07m54s.png
|
|
Attachment 8: visu_2018-07-08_07h08m00s.png
|
|
Fixed | e738 |
Sun Jul 8 07:19:45 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 10C(p,d)9C and 10C(p,t)8C |
Used data : Run 0284 & 0285 (about 4 hours data)
CsI energy calibration parameters are from previous experiment, optimized for deuteron
10C(p,d)9C
gate:
1. target gate by CATS1&2
2. deuteron gate by MUST2 dE-E
3. fragment gate by CHIO and plastic for Z=6,5,4
Ground state of 9C (bound) and first excited state of 9C (2.2 MeV, decay to 8B + p) are seen.
10C(p,t)8C
1. target gate by CATS1&2
2. triton gate by MUST2 dE-E
Not clear as (p,d) but sign of ground state is seen.
Kinematics is shifted for each telescope, probably because energy calibration and the position of the telescopes can be shifted.
Coincidence of alpha and (or) multi-proton can be helpful. |
Attachment 1: pd_fig1.pdf
|
|
Attachment 2: pd_fig2.pdf
|
|
Attachment 3: pt_fig1.pdf
|
|
Attachment 4: pt_fig2.pdf
|
|
Ongoing | e738 |
Sun Jul 8 08:53:44 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target |
|
Attachment 1: cell0807.png
|
|
Attachment 2: heatshield0807.png
|
|
Attachment 3: tempepature0807.png
|
|
Fixed | e738 |
Sun Jul 8 09:14:18 2018 |
takeshi, Didier, Valérie | RUN | General | Cryo-LH2 | RUNS 288-290 |
RUN 288
10C + liq H2
start 08h56 stop 10h56
Run 289 start 10h56 stop 12h52
Run 290 start 13h18 stop 13h36
|
Attachment 1: scaler_2018-07-08_08h59m10s.png
|
|
Attachment 2: visu_2018-07-08_09h10m02s.png
|
|
Attachment 3: visu_2018-07-08_09h12m01s.png
|
|
Attachment 4: visu_2018-07-08_09h12m07s.png
|
|
Attachment 5: visu_2018-07-08_09h12m13s.png
|
|
Attachment 6: visu_2018-07-08_09h12m20s.png
|
|
Attachment 7: visu_2018-07-08_09h13m26s.png
|
|
Attachment 8: visu_2018-07-08_09h13m29s.png
|
|
Attachment 9: visu_2018-07-08_09h13m34s.png
|
|
Attachment 10: visu_2018-07-08_09h13m42s.png
|
|
Attachment 11: visu_2018-07-08_09h13m48s.png
|
|
Fixed | e738 |
Sun Jul 8 14:23:43 2018 |
Valérie | RUN | General | Cryo-LH2 | RUN Summary and MUST2, DAQ conditions |
MUST2
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
Pedestals see snapshots DASmust2T1pedestalsThr.png ;
for Telescope with siLi T7 and T8 DASmust2T8SiLipedestalsThr.png
Run directory /data/e748X/e755/acquisition/run/
7th and 8th July
- GMT triggers
Conditions for HV below (see snapshots)
---------------------------------------------------------------------------------------
-r--r--r-- 1 e748 Exxx 77M 7 juil. 08:27 run_0270.dat.07-07-18_08h24m32s
-r--r--r-- 1 e748 Exxx 1,6M 7 juil. 08:41 run_0271.dat.07-07-18_08h36m25s
-r--r--r-- 1 e748 Exxx 500M 7 juil. 19:43 run_0272.dat.07-07-18_08h40m30s
-r--r--r-- 1 e748 Exxx 463M 7 juil. 20:34 run_0273.dat.07-07-18_20h28m28s
-r--r--r-- 1 e748 Exxx 28M 7 juil. 20:56 run_0274.dat.07-07-18_20h34m01s
-r--r--r-- 1 e748 Exxx 861M 7 juil. 21:08 run_0275.dat.07-07-18_20h55m55s
-r--r--r-- 1 e748 Exxx 31M 7 juil. 21:34 run_0276.dat.07-07-18_21h07m28s
-r--r--r-- 1 e748 Exxx 1,8G 7 juil. 21:57 run_0277.dat.07-07-18_21h33m11s
-r--r--r-- 1 e748 Exxx 1,5G 7 juil. 22:18 run_0278.dat.07-07-18_21h57m47s
-r--r--r-- 1 e748 Exxx 47M 7 juil. 22:23 run_0279.dat.07-07-18_22h18m03s
-r--r--r-- 1 e748 Exxx 1,7G 7 juil. 23:50 run_0280.dat.07-07-18_23h12m33s
-r--r--r-- 1 e748 Exxx 51M 8 juil. 00:11 run_0281.dat.07-07-18_23h56m51s
-r--r--r-- 1 e748 Exxx 102M 8 juil. 00:53 run_0282.dat.08-07-18_00h23m55s
-r--r--r-- 1 e748 Exxx 153M 8 juil. 01:07 run_0283.dat.08-07-18_00h52m54s
-r--r--r-- 1 e748 Exxx 2,9G 8 juil. 03:11 run_0284.dat.08-07-18_01h06m43s
-r--r--r-- 1 e748 Exxx 2,7G 8 juil. 05:10 run_0285.dat.08-07-18_03h10m48s
-r--r--r-- 1 e748 Exxx 2,9G 8 juil. 07:00 run_0286.dat.08-07-18_05h09m33s
-r--r--r-- 1 e748 Exxx 3,1G 8 juil. 08:55 run_0287.dat.08-07-18_06h59m42s
-r--r--r-- 1 e748 Exxx 3,2G 8 juil. 10:56 run_0288.dat.08-07-18_08h55m20s
-r--r--r-- 1 e748 Exxx 3,0G 8 juil. 12:52 run_0289.dat.08-07-18_10h56m21s
-r--r--r-- 1 e748 Exxx 409M 8 juil. 13:36 run_0290.dat.08-07-18_13h18m13s
run_0291.dat.08-07-18_13h47m40s
------------------------------------------------------------------------------------- |
Attachment 1: HV_T1toT4Run291.png
|
|
Attachment 2: HV_T5toT8andCatsRun291.png
|
|
Attachment 3: TriggerGMTexp738.png
|
|
Attachment 4: RCCnarvalOnRun291.png
|
|
Attachment 5: DASmust2T4Thres400keV.png
|
|
Attachment 6: DASmust2T1pedestalsThr.png
|
|
Attachment 7: DASmust2T8SiLipedestalsThr.png
|
|
Attachment 8: run291_MM1toT8strxT.png
|
|
Attachment 9: run291_MM1toT4EstrXY.png
|
|
Attachment 10: run291MM5toMM8StryEcal.png
|
|
Attachment 11: run291MM1toMM6CsIEcal.png
|
|
Attachment 12: run291MM1toMM6CsIEraw.png
|
|
Fixed | e738 |
Sun Jul 8 14:57:40 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 291 overview |
Beam 10C between 9.10**4 and 10**5/s
dead time between 7 and 12%
Run 291 start 13h47 stop 15h51
e748 Exxx 3,2G 8 juil. 15:51 run_0291.dat.08-07-18_13h47m40s
CATS 630 V (I~ 0.10 ľA); CATS2 650V (0.08 ľA)
MUST2 DSSD HV and currents
T1 80 V ; 4.2 ľA || T2 80 V ; 0.9 ľA || T3 70 V ~ 0.5 ľA || T4 60 V ; ~ 0.4 ľA
T5 80 V ; 5.3 ľA || T6 80 V ; 0.6 ľA || T7 80 V ~ 0.6 ľA || T8 80 V ; ~ 3.4 ľA |
Attachment 1: run291_scalersAt15h.png
|
|
Attachment 2: run291_TriggerGMT.png
|
|
Attachment 3: run291_TcatsHF.png
|
|
Attachment 4: run291_TcatsPlast.png
|
|
Attachment 5: run291_BeamTracks.png
|
|
Attachment 6: run291_MMimpact.png
|
|
Attachment 7: run291CatsStrQraw.png
|
|
Attachment 8: run291CatsStrQcal.png
|
|
Attachment 9: run291QplastT.png
|
|
Attachment 10: run292DCnumexoEraw.png
|
|
Attachment 11: run291correlIDCnumexoXY.png
|
|
Attachment 12: run291CorrelICde1tcatsHF.png
|
|
Attachment 13: run291CorrelICqEplastDE.png
|
|
Attachment 14: run291correlIC0degPID.png
|
|
Fixed | e738 |
Sun Jul 8 16:03:06 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 292 -still 10C |
Beam 10C around 1. and 1.1 10**5/s
dead time between 6 and 12%
Run 292 start 15h51 stop 16h19 to change CATS HV.
e748 Exxx 733M 8 juil. 16:19 run_0292.dat.08-07-18_15h50m56s
during Run 292 and before CATS1 HV = 630V; CATS2 650V. |
Attachment 1: run292ScalersAt16h02.png
|
|
Fixed | e738 |
Sun Jul 8 16:28:56 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 293 |
From Run 293 CATS1 HV = 640V I ~ 0.16 ľA ; CATS2 660V I ~ 0.10 ľA
Run 293 start 16h22; stop at 17h30
e748 Exxx 1,9G 8 juil. 17:30 run_0293.dat.08-07-18_16h19m54s
Beam 10C around 1. and 1.1 10**5/s
dead time between 6 and 12% |
Attachment 1: run293ScalersAt16h31.png
|
|