Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e748 |
Sun Jul 2 05:45:18 2017 |
e748 | CATS | Software | N/A | Mask CATS 2 |
Run 75
shift surveyor
CATS_SHIFT[2][2]={{0.3,0.8},{0.7,0.2}} ie (X1,Y1)(X2,Y2) -> to be adjusted in more detail
TARGET_SHIFT[2]={-0.2,0.0}
List of inversion : X -> -X on CATS1 |
Attachment 1: Run75MaskCATS2.png
|
|
Fixed | e748 |
Sun Jul 2 05:56:12 2017 |
e748 | CATS | Software | N/A | Mask on target |
Run 74 Mask on target
With surveyor offsets and the inversion X -> -X on CATS1 (determined with run 75), 2 holes are observed. see figure Run74MaskTarget.png
Need to scan the mask with the beam.
Play with offset to fit with the hole which is at zero (we think at zero, has to be confirmed with a new run scanning all the target with beam) -> new set of offsets X1=+0.3mm Y1=+0.8mm X2=+0.3mm Y2=0mm
See figure Run74MaskTarget_Offsetmv.png |
Attachment 1: Run74MaskTarget.png
|
|
Attachment 2: Run74MaskTarget_Offsetmv.png
|
|
Fixed | e748 |
Sun Jul 2 08:06:53 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 77 global check |
Conditions of Run 77
2 July - start at 6h29 - stop at 8h38
e748 Exxx 126943232 2 juil. 08:38 run_0077.dat.02-07-17_06h29m23s
N.B: The run is stopped at 8h38 to check the bidim of correlations TPL_CATS1 coded in VXI MUST2 and VXI CHIO.
GMT Triggers all MUST2 T1 to T8
----------------------------------------------------------------------------------------------------
CD2 2.5 mg/cm2 POSITION 3
CATS rate ~ 10 K/s to 12K /s; SCaler Analyzer see plot below
Muvi1 and Muvi2 counting rates: plots below
The merge configuration is checked with the parameters CONFDEV GATCONF etc...see plot below at 8h00
---------------------------------------------------------------------------------------------------- |
Attachment 1: CheckMergeConf2july17at8h00.png
|
|
Attachment 2: RunControlOnlineNarvalRun77.png
|
|
Attachment 3: ScalerAnalyzerRun77At8h15.png
|
|
Attachment 4: ScalerMuvi1Run77.png
|
|
Attachment 5: ScalerMuvi2Run77.png
|
|
Attachment 6: GMTConfigRun77.png
|
|
Fixed | e748 |
Sun Jul 2 08:40:25 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 78 - 2 July - 18O beam |
Run #78 CD2 2.5 mg/cm2 position 3 - 18O beam
Same conditions as for Run 77
Triggers all MUST2, T1 to T8, GMT IN1 to IN8
RUN 78 2nd July START at 8h39, STOP 10h01
e748 Exxx 92405760 2 juil. 10:01 run_0078.dat.02-07-17_08h39m30s
STOP of the beam and of the run to enter in D6, to make some checking of electronics and of the timing. |
Attachment 1: Run78ConfdevDataTrig.png
|
|
Attachment 2: RUN78tPLcats1CORREL.png
|
|
Attachment 3: Run78CorrelWindowtimePlastCats1.png
|
|
Attachment 4: Run78TACplastCats.png
|
|
Attachment 5: Run78TrigMM2impact.png
|
|
Fixed | e748 |
Sun Jul 2 08:46:13 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | Summary of the TAC conditions |
JULY 2nd 8pm
Bidiv = 1 for CATS1 and 2
Bidiv = 1 for Plast and ChIo
TAC ranges
START STOP RANGE PARAMETER ADDRESS VXI MODULE
-------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------
CATS1_FAG CAVIAR (del 550ns) 1µs T_CATS1_CAV ADC VXI MUST2 add=19
CATS1_FAG CATS2_FAG (del 33ns) 200ns T_CATS1_2 ADC VXI MUST2 add=28
OU_MUVI CATS1_FAG 500ns T_MUVI_CATS1 ADC VXI MUST2 add=21
CATS2_FAG PLAST (val) 1µs T_PL_CATS2 ADC VXI MUST2 add=22
CATS1_FAG PLAST (no val) 1µs T_PL_CATS1 ADC VXI MUST2 add=23
-------------------------------------------------------------------------------------------
CATS1_FAG PLAST (no val) 1µs T_PLch_CATS1 ADC VXI CHIO add=19
PLAST val Gamer ChIo CHIO (no val) 2µs T_PL_CHIO ADC VXI CHIO add=3
-------------------------------------------------------------------------------------------
TAC EXL HF 100ns EXL_HF ADC VXI MUST2 add=18
------------------------------------------------------------------------------------------- |
Fixed | e748 |
Sun Jul 2 09:54:05 2017 |
Valérie Lapoux | DAQ | General | CD2 | Test of the TAC plast CATS ADC VXI Run78 |
|
Attachment 1: InspectLinesVXIMust2Run78LTtAiCatsFAG.png
|
|
Attachment 2: InspectVXIchioADCsignalTplchCATS1Run78.png
|
|
Fixed | e748 |
Sun Jul 2 10:31:48 2017 |
Valérie Lapoux | ONLINE | Hardware | CD2 | Change of the electronics for TAC Plast CATS1 |
Shift U (Béa +Vlx) entered in the room to check the electronics of Cats1 and of the TAC plast-Cats1
Now we have taken the output of one of the TAC : START=CATS1_FAG - STOP plast (no val)
We send it to a Linear Fifo from which it is duplicated for the ADC channels:
-ADC of VXI MUST2 parameter T_PL_CATS1 ; add 23
-ADC of VXI CHIO parameter T_PLch_CATS1; add 19
NB:
Now we put 50 Ohms everywhere in the logic Fifo for Cats1 Validated in the CATS electronics. |
Fixed | e748 |
Sun Jul 2 10:44:59 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 79 Beam of 18O |
run_0079.dat.02-07-17_10h37m20s
Triggers : all MUST2 telescopes 1 to 8.
The pulser is ON again in the DAQ and Scaler Analyzer. See plots.
The pulser is taken from the GAMER of the VXI CHIO.
For the correlations the situation is now improved (no multiple peaks in Tplast_CATS1)
but a lot of 0 in the TAC spectra. Low counting rates in the spectra between Plast and CATS, which are obtained
with the MUST2 triggers. We need to check the correlations between CATS and MUST2.
For all the runs the validations of the CATS was taken using the signal from the GAMER of VXI CATS, the sequenceur.
See below the configuration of "SEQUENCEUR". |
Attachment 1: ScalersAnalyzerRun79.png
|
|
Attachment 2: PulserONforRUn79GAMERchiO.png
|
|
Attachment 3: ScalerAnalyzerRun79OkPulser.png
|
|
Attachment 4: Run79CorrelPlastCATS1vxiChioAndMUST2.png
|
|
Attachment 5: Run79CorrelTPlastCats1.png
|
|
Attachment 6: DASconfigSequenceurCATS.png
|
|
Attachment 7: ADCvxiMust2configPAramTAC.png
|
|
Attachment 8: ConfigADCvxiChioRun79.png
|
|
Fixed | e748 |
Sun Jul 2 11:38:03 2017 |
Valérie Lapoux | RUN | General | CD2 | Runs 80-81 TESTS change of TAC and triggers |
For runs 80- 81:
for test purposes, we changed the coincidence mode for CATS: we put FAG instead of the Seq1 coming from the gamer.
Run 80 start 11h33; stop 11h40
e748 Exxx 15794176 2 juil. 11:40 run_0080.dat.02-07-17_11h33m07s
CD2 2.5 mg/cm2
change of the trigger conditions only CATS1 div =100
(all bidiv at 100)
-------------------------------------------------------------------------------------------
Run 81 start 11h42; stop 11h48 triggers IN1 to IN8, all Must2
e748 Exxx 4128768 2 juil. 11:48 run_0081.dat.02-07-17_11h42m27s
-------------------------------------------------------------------------------------------
CONDITIONS FOR TAC:
START STOP RANGE PARAMETER ADDRESS VXI MODULE
-------------------------------------------------------------------------------------------
CATS1_FAG CAVIAR (del 550ns) 1µs T_CATS1_CAV ADC VXI MUST2 add=19
CATS1_FAG CATS2_FAG (del 33ns) 200ns T_CATS1_2 ADC VXI MUST2 add=28
OU_MUVI CATS1_FAG 500ns T_MUVI_CATS1 ADC VXI MUST2 add=21
CATS2_FAG PLAST (val) 200ns T_PL_CATS2 ADC VXI MUST2 add=22
CATS1_FAG PLAST (no val) 200 ns T_PL_CATS1 ADC VXI MUST2 add=23
-------------------------------------------------------------------------------------------
CATS1_FAG PLAST (no val) 200ns T_PLch_CATS1 ADC VXI CHIO add=19
PLAST val Gamer ChIo CHIO (no val) 2µs T_PL_CHIO ADC VXI CHIO add=3
-------------------------------------------------------------------------------------------
TAC EXL HF 200 ns EXL_HF ADC VXI MUST2 add=18 |
Fixed | e748 |
Sun Jul 2 12:08:56 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 82 |
Run82 start at 12h00 stop at 12h09
e748 Exxx 6684672 2 juil. 12:09 run_0082.dat.02-07-17_12h00m43s
Before starting run 82, we enter in the D6 room to restaure the electronics for CATS as it was before
(back to the situation of SEQ1 for the coincidence in CATS electronics, as before run 80)
triggers all MUST2
CD2 target
counting 10-12 k/s on CATS
CATS 1 and 2 : HV 650V |
Fixed | e748 |
Sun Jul 2 12:16:57 2017 |
Valérie Lapoux | RUN | General | CD2 | Runs 83-84 only CATS1 trigger |
Run83 start at 12h11 stop at 12h16
e748 Exxx 21561344 2 juil. 12:16 run_0083.dat.02-07-17_12h11m16s
----------------------------------------------
Run83 start at 12h24 stop at
---------------------------------------------
trigger: ONLY Cats1 div (div=100)
CD2 target 2.5 mg/cm2
counting 10-12 k/s on CATS
CATS 1 and 2 : HV 650V
---------------------------------------------- |
Attachment 1: ScalersRun84Cats1trigg.png
|
|
Attachment 2: ConfigTRigCorrelMErgeRun84.png
|
|
Fixed | e748 |
Sun Jul 2 13:22:46 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 85+summary TAC |
Started run #85 at 13h21 stop at 13h31
e748 Exxx 5439488 2 juil. 13:31 run_0085.dat.02-07-17_13h21m57s
Triggers all MUST2
CD2 target 2.5 mg/cm2
18O beam
NOW (Run 85) Plast DEL 200ns instead of 500 ns (for previous runs)
signal for all the TAC with CATS
Range of TAC 1µs for T_PL_CATS2, T_PL_CATS1
(same for signal T_PLch_CATS1 duplicated from T_PL_CATS1 and coded in VXI CHIO)
START STOP RANGE PARAMETER ADDRESS VXI MODULE
-------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------
CATS1_FAG CAVIAR (del 550ns) 1µs T_CATS1_CAV ADC VXI MUST2 add=19
CATS1_FAG CATS2_FAG (del 33ns) 200ns T_CATS1_2 ADC VXI MUST2 add=28
OU_MUVI CATS1_FAG 500ns T_MUVI_CATS1 ADC VXI MUST2 add=21
CATS2_FAG PLAST (no val) 1µs T_PL_CATS2 ADC VXI MUST2 add=22
CATS1_FAG PLAST (no val) 1µs T_PL_CATS1 ADC VXI MUST2 add=23
!!!NOW PLAST is delayed with 200 ns (DGG) previously it was 500ns
-------------------------------------------------------------------------------------------
CATS1_FAG PLAST (no val) 1µs T_PLch_CATS1 ADC VXI CHIO add=19
PLAST val Gamer ChIo CHIO (no val) 2µs T_PL_CHIO ADC VXI CHIO add=3
-------------------------------------------------------------------------------------------
TAC EXL HF 100ns EXL_HF ADC VXI MUST2 add=18 |
Fixed | e748 |
Sun Jul 2 13:31:21 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 86 trigger CATS1 |
Run 86 start at 13h32 stop at 13h43
e748 Exxx 34340864 2 juil. 13:43 run_0086.dat.02-07-17_13h32m13s
TRIGGER CATS1 div =100 only
Summary of TAC plots |
Attachment 1: CorrelRun86mergeOKruncontrol.png
|
|
Attachment 2: Run86TacPlastCATStrigCats1.png
|
|
Fixed | e748 |
Sun Jul 2 13:49:20 2017 |
Valérie Lapoux | RUN | General | CD2 | Run 88 trigger CATS1 |
Run 88 start at 13h48
TRIGGER CATS1 div =100 only
18O beam CD2 target
|
Fixed | e748 |
Sun Jul 2 14:49:41 2017 |
Valérie Lapoux | ONLINE | Hardware | CD2 | TAC and signals for Plast-CATS1 |
Now we return to the situation of 2 TACs for the coding of the same time Plast-Cats1 in the 2 DAQs systems VXI_CHIO and VXI_MUST2.
TAC1 start CATS1val; STOP Plast (delayed by 200ns with DGG) range 1µs OUTPUT signal T_PL_CATS1 VXI_MUST2 ADC add=23
TAC1 start CATS1val; STOP Plast (delayed by 200ns with DGG) range 1µs OUTPUT signal T_PLch_CATS1 VXI_ChIo aADC_CHIO add=19 |
Fixed | e748 |
Sun Jul 2 14:54:39 2017 |
Valérie Lapoux | RUN | General | | Runs 90-92 Tuning of the cocktail beam in D4 |
Runs 90 to 92 Tuning of LISE
GMT Trigger IN13=Trig_LISE (D4)
e748 Exxx 15859712 2 juil. 14:51 run_0090.dat.02-07-17_14h47m41s
e748 Exxx 39714816 2 juil. 14:57 run_0091.dat.02-07-17_14h52m38s
e748 Exxx 4390912 2 juil. 15:04 run_0092.dat.02-07-17_14h59m19s |
Fixed | e748 |
Sun Jul 2 15:13:49 2017 |
Valérie Lapoux | RUN | General | | Runs 93-94 Tuning of the cocktail beam in D6 |
Runs 93-94 Tuning of LISE
GMT Trigger IN13=Trig_LISE (=D6)
e748 Exxx 25493504 2 juil. 15:11 run_0093.dat.02-07-17_15h07m01s
e748 Exxx 15269888 2 juil. 15:14 run_0094.dat.02-07-17_15h11m38s
|
Attachment 1: ScalerAnalyzerCaviar15h29.png
|
|
Fixed | e748 |
Sun Jul 2 17:25:22 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | ADC parameters-new ones for LISE +Pulser for Correlations |
New parameter for LISE in VXI_CHIO ADC_CHIO
parameter TED4HF address=4 channel 5 (cable label "5" on connected, first branch of ADC_CHIO)
-------------------------------------------------------------------------------------
For the tests of the correlations between VXI CHIO and VXI MUST2:
- IN14 input GMT of the pulser
- Parameters
VXI_CHIO
ADC_CHIO_V15 channel 16, add=15
VXI_MUST2 ADC (4th part of 8 ch)
ADC_VOIE_29 channel 28, add=29
--------------------------------------------------------- |
Attachment 1: DASVXIchioAdcLiseParam.png
|
|
Attachment 2: ConfigDASnew2ndJulyVXIMust2.png
|
|
Fixed | e748 |
Sun Jul 2 18:19:24 2017 |
Valérie Lapoux | DAQ | Hardware | CD2 | Change of DAQ parameters for LISE |
|
Attachment 1: DASparamLISEVXIChioNEW.png
|
|
Fixed | e748 |
Sun Jul 2 18:27:48 2017 |
Valérie Lapoux | ONLINE | Software | | Narval configuration, Watcher ports |
New file xml is loaded with various Watchers, the corresponding ports
Watcher 10205
Watcher WatRaw 10206
Watcher WatNPTool 10208
Watcher WatCalib 10207
Watcher WatLISE 10209 |
Attachment 1: RunControlRun101allwtch.png
|
|