MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 42 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Fixed, e738, Mon Jul 9 04:22:21 2018, Benoit, Megumi, RUN, General, Cryo-LH2, RUN 300 scaler_2018-07-09_04h17m03s.pngvisu_2018-07-09_05h55m54s.pngvisu_2018-07-09_05h56m57s.pngvisu_2018-07-09_06h00m30s.png
Run 300 start 04h02 (9th July) stop at 06h04
e748 Exxx 2,8G 9 juil. 06:05 run_0300.dat.09-07-18_04h02m08s

MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.12 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13%
Fixed, e738, Mon Jul 9 06:21:54 2018, Benoit, Megumi, RUN, General, Cryo-LH2, RUN 301 scaler_2018-07-09_06h13m13s.pngscaler_2018-07-09_07h51m37s.png
Run 301 start 06h04 (9th July) stop at 7h51


MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.12 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13%
Fixed, e738, Mon Jul 9 07:55:05 2018, Pierre, RUN, General, Cryo-LH2, Run 302 scaler_2018-07-09_07h57m43s.pngvisu_2018-07-09_07h59m57s.pngvisu_2018-07-09_08h00m04s.pngvisu_2018-07-09_08h04m11s.png
start: 07h53
stop: 08h19

We stop the run to warm up the target
Fixed, e738, Mon Jul 9 08:00:11 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0907.pngcell0907.png
Here are the temperature log of the cyo H2 target during the 10C setting.
Fixed, e738, Mon Jul 9 08:55:13 2018, Pierre Daisuke, RUN, General, Empty, Run 303 
start: 08h27
stop: 08h50

Run for background with no beam
Fixed, e738, Mon Jul 9 08:56:50 2018, Pierre Daisuke, RUN, General, Cryo-empty, Run 304 scaler_2018-07-09_08h57m21s.pngvisu_2018-07-09_09h03m24s.pngvisu_2018-07-09_09h03m30s.pngvisu_2018-07-09_09h04m05s.pngvisu_2018-07-09_09h04m21s.png
start: 08h54
stop: 10h00

Run with same trigger but empty target
TRIGGER: MMi, CATS1DIV, CATS2DIV, PLASTIC%
Fixed, e738, Mon Jul 9 15:43:50 2018, Pierre Valérie, RUN, General, Cryo-empty, Run 309 scaler_2018-07-09_15h38m55s.pngscaler_2018-07-09_16h10m56s.png
start: 15h36
stop: 16h10

Trigger: OR MM, CATS1 DIV and PLASTIC%

large beam interuption between 15h40 and 16h06
Fixed, e738, Mon Jul 9 17:18:55 2018, e748, RUN, General, Cryo-empty, RUN 311 13x
Run 311
Beam/Detectors Tuning

start: 17h04 stop: 17h16
Beam: 9C
target: empty

Trigger: T1 to T8, CATS1%, PLASTIC%

I=1.5*10⁵pps in CATS1
Purity = 6.3%


HV of plastic has been changed to 2100V
Fixed, e738, Mon Jul 9 18:03:48 2018, Valérie Louis, RUN, General, Cryo-LH2, RUN 312 25x
Run 312

First RUN of 9C on filled LH2 target

start: 17h36 stop: 18h56
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1%3*10⁴, CATS2%3*10⁴, PLASTIC%1*10⁴

I=1.4*10pps in CATS1
Purity = 5.1%


HV of DC wire has been changed from 500V to 530V
Plastic threshold has been changed from 180mV to 70mV

Target has been succefully filled
Fixed, e738, Mon Jul 9 19:16:13 2018, Freddy Louis, RUN, General, Cryo-LH2, RUN 313 to 316 Run317_discri_GECO.png
From RUN 313 to RUN 316:

Tuning dor the Drift Chamber:
  • threshold changed
  • CFD discriminator has been tuned in GECO
  • Buffer size has been change to match with the new setting

DC now works as well as th online visualisation
Acquisition is stable
Fixed, e738, Mon Jul 9 19:24:06 2018, Freddy Valérie Louis, RUN, General, Cryo-LH2, RUN 317 scaler_2018-07-09_19h26m05s.pngvisu_2018-07-09_19h26m13s.pngvisu_2018-07-09_19h28m52s.pngvisu_2018-07-09_19h29m09s.pngscaler_STOP_2018-07-09_19h32m05s.png
Run 317

start: 19h08 stop: 19h30
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1%3*104, CATS2%3*10⁴;, PLASTIC%1*10⁴

I=1.8*10pps in CATS1
Purity = 5.1%
Fixed, e738, Mon Jul 9 20:28:09 2018, Daisuke, Freddy, Louis, Valérie, RUN, General, Cryo-LH2, RUNS 318 to 320 ProblemDAQcrateCATS1RCAt20h.pngProblemDAQcrateCATS1iolan.pngProblemMergerCATSbranch.png
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running.
We killed Narval.
It was impossible to initialize or start run correctly.We did Several kna, kall.
Bugs on the run control server (ps -edf |grep narval or start_acq showed several on-going processes. We removed them). Then the CATS1 crate was not initialized correctly, it remained Offline.
see ProblemDAQcrateCATS1RCAt20h.png ProblemDAQcrateCATS1iolan.png
We rebooted (software mode on Iolan) CATS1 VXI crate, then init..;breakup...init then tried to start but stopped because because we noted merger problems.
See ProblemMergerCATSbranch.png
Then we needed to reinitialize a third time the Narval run control bto recover a correct Run control operation.

Fred S. came to check that we worked well... and that everything was working well.
Fixed, e738, Mon Jul 9 20:33:00 2018, Daisuke Louis Valérie , RUN, General, Cryo-LH2, RUN 321- ok again ! 20x
Run 321 start 20:09
Total beam on CATS ~ 1.7 10**5 /s
Beam of 9C, 7Be, 8B and 6Li
All triggers

CATS1: 670V I ~0.22 ľA; CATS2: 700V I ~ 0.18ľA
We can see spots of tritons in the plots EDE of MUST2 see the plot Run321pidEDEcsIMM1to6zoomPDT.png.
Fixed, e738, Mon Jul 9 22:15:04 2018, DIdier Daisuke Nori Louis Valérie, RUN, General, Cryo-LH2, RUN 322, strip CATS2 X 19 off 7x
Run 322 start: 22h00 stop: 0h21
e748 Exxx 3,7G 10 juil. 00:21 run_0322.dat.09-07-18_21h58m34s
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1% CATS2% PLASTIC%

I=1.6*10⁵pps in CATS1
I=1.8uA primary beam
Purity = 5.2% from T_CATS_HF


From this run, new missing strip in CATS2 X 19

NB: Buffer size for the numexo data was changed after run314. Since then the runs are not correctly converted (smaller size of the root files than before, nearly factor 10.
No (complete) offline run conversion since run 321.
Ongoing, e738, Mon Jul 9 23:21:55 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0907-2.pngcell0907-2.pngregenerate0907.png
Here are the temperature logs of the liquid H2 target up to now.
I would share the log during the regeneration.
Fixed, e738, Mon Jul 9 23:25:10 2018, takeshi, RUN, General, Cryo-LH2, run summary for 10C beam 
With 10C beam, we have obtained
31.7 hours of liq. H2 target and
1.2 hours of empty target.

see online run summary for detail.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919
Fixed, e738, Tue Jul 10 00:46:26 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 323 + Brho line settings Run323_scalersAt0h36.pngRun323_TOFcatsHF.pngRun323_ScalersEndRun.png
Run 323 start: 0h20 stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4

Dead time between 8 and 15%
CATS2 X19 strip not running since Run 322
Total beam I from 1.2 to 1.4*10**5 pps in CATS1, CATS2
I=1.8uA primary beam
Purity = 5.1% of 9C from T_CATS1_HF
Integral 4 peaks NP_T_CATS1_HF = 7341 [channels 10 to 8000];
peak of 8B [channels 10 to 2000]; integ=609 --> 8.3 %
peak 9C [ch. 2600 to 4200]:376 --> 5.1% ;
7Be[channels 4200 to 6300], integ= 4535 --> 61.7%
peak of 6Li [channels 6300 to 8000]: 1834 --> 24.9%
CATS1 670V 0.14 ľA (sparkles at 0.5 ľA)
CATS2 700V 0.12 ľA
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Primary beam 12C 75 MeV/u 1.5 ľA ==> 1.4 10**5 pps on CATS

Brho1(RMN) = 1.7301 T.m ; I _D3P1 = 305.3 A
Brho2(RMN) = 1.6352 T.m ; I _D3P1 = 375.3 A
--> Energy (9C) = 55.3 MeV/u

Brho_DA1(RMN) = 1.6301 T.m ; I _DAP = 164 A
Brho_DA2(RMN) = 1.6555 T.m ; I _DAC2 = 3 A
Wien Filter 0/0 kV
SLITS.
FH31 = +/-20mm;
FH42 = +/-10 ; FV43 = +/-10.4 ; FH51 = +/-30 ;
FH61 = +/-30 ; FV61 = +/-25.5 ; FH62 = +/-15 mm; FV62 = +/-20
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
Fixed, e738, Tue Jul 10 01:26:21 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C updated 6x
Used data run run0284-0302 (almost all for 10C beam)
CsI calibration parameters are the same as E755 exp (deuteron optimized),

10C(p,d)9C
Gate:
1. beam position on the target by CATS1&2
2. deuteron gate by dE-E MUST2 T1-T4
Offset of the position of MUST2 T1-T4 was determined by 10C beam direct hit component. Target Z position (beam direction) is shifted 12 mm to match kinematics of 9C g.s.
Ground state of 9C and first excited state of 9C (2.2 MeV) are clear. Higher excited state around 6 MeV.
Statistics for T2 is smaller because 2 CsI crystals are not working (known before E755 exp,).

10C(p,t)8C
Gate:
1. beam position on the target by CATS1&2
2. triton gate by dE-E MUST2 T1-T4
Same position offset of (p,d) is used.
Ground state of 8C is clear, but energy of each CsI crystal seems to be shifted.
Fixed, e738, Tue Jul 10 02:47:10 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 324 24x
Run 324 start: 2h45 stop 5h10
e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4

CATS2 X19 strip not running since Run 322
Total beam I 1.4*10**5 pps in CATS1, CATS2
I=1.8uA primary beam
Purity = 4.7% of 9C from T_CATS1_HF
Integral 4 peaks
peak of 8B [channels 10 to 2000]; 7Be[channels 4200 to 6300];
peak of 6Li [channels 6300 to 8000]:
total NP_T_CATS1_HF = 44060 [channels 10 to 8000];

peak 9C [ch. 2600 to 4200]:2060--> 4.7% ;

CATS1 670V 0.20ľA for beam at 1.4 10**5 pps
CATS2 700V 0.16 ľA

Dead time between 8 and 15%
Fixed, e738, Tue Jul 10 05:12:31 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 325 Run325_scalersAt5h12.pngRun325_EDECsIMMpidZoomZ3Z4.pngRun325_scalersEndRunCats1TRIP.png
Run 325 start: 5h10 stop 6h53 due to CATS1 -->tripping
e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
Beam: 9C
All Triggers: T1 to T8, CATS1% CATS2% PLASTIC%
Divisions: CATS1, CATS2 3. 10**4 ; Plastic% 10**4
CATS2 X19 strip not running since Run 322
Total beam I 1.3 to 1.4 10**5 pps in CATS1, CATS2
I ~ 1.8uA primary beam
Purity = 4.7 to 5% of 9C from T_CATS1_HF
I
CATS1 670V 0.20ľA for beam at 1.4 10**5 pps
CATS2 700V 0.16 ľA

Dead time between 8 and 15%

ELOG Home Page