MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 42 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Fixed, e738, Mon Jul 9 04:22:21 2018, Benoit, Megumi, RUN, General, Cryo-LH2, RUN 300 scaler_2018-07-09_04h17m03s.pngvisu_2018-07-09_05h55m54s.pngvisu_2018-07-09_05h56m57s.pngvisu_2018-07-09_06h00m30s.png
Run 300 start 04h02 (9th July) stop at 06h04
e748 Exxx 2,8G  9 juil. 06:05 run_0300.dat.09-07-18_04h02m08s
Fixed, e738, Mon Jul 9 06:21:54 2018, Benoit, Megumi, RUN, General, Cryo-LH2, RUN 301 scaler_2018-07-09_06h13m13s.pngscaler_2018-07-09_07h51m37s.png
Run 301 start 06h04 (9th July) stop at 7h51

Fixed, e738, Mon Jul 9 07:55:05 2018, Pierre, RUN, General, Cryo-LH2, Run 302 scaler_2018-07-09_07h57m43s.pngvisu_2018-07-09_07h59m57s.pngvisu_2018-07-09_08h00m04s.pngvisu_2018-07-09_08h04m11s.png
start: 07h53
stop: 08h19
Fixed, e738, Mon Jul 9 08:00:11 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0907.pngcell0907.png
Here are the temperature log of the cyo H2 target during the 10C setting.
Fixed, e738, Mon Jul 9 08:55:13 2018, Pierre Daisuke, RUN, General, Empty, Run 303 
start: 08h27
stop: 08h50
Fixed, e738, Mon Jul 9 08:56:50 2018, Pierre Daisuke, RUN, General, Cryo-empty, Run 304 scaler_2018-07-09_08h57m21s.pngvisu_2018-07-09_09h03m24s.pngvisu_2018-07-09_09h03m30s.pngvisu_2018-07-09_09h04m05s.pngvisu_2018-07-09_09h04m21s.png
start: 08h54
stop: 10h00
Fixed, e738, Mon Jul 9 15:43:50 2018, Pierre Valérie, RUN, General, Cryo-empty, Run 309 scaler_2018-07-09_15h38m55s.pngscaler_2018-07-09_16h10m56s.png
start: 15h36
stop: 16h10
Fixed, e738, Mon Jul 9 17:18:55 2018, e748, RUN, General, Cryo-empty, RUN 311 13x
Run 311
Beam/Detectors Tuning
Fixed, e738, Mon Jul 9 18:03:48 2018, Valérie Louis, RUN, General, Cryo-LH2, RUN 312 25x
Run 312

First RUN of 9C on filled LH2 target
Fixed, e738, Mon Jul 9 19:16:13 2018, Freddy Louis, RUN, General, Cryo-LH2, RUN 313 to 316 Run317_discri_GECO.png
From RUN 313 to RUN 316:

Tuning dor the Drift Chamber:
Fixed, e738, Mon Jul 9 19:24:06 2018, Freddy Valérie Louis, RUN, General, Cryo-LH2, RUN 317 scaler_2018-07-09_19h26m05s.pngvisu_2018-07-09_19h26m13s.pngvisu_2018-07-09_19h28m52s.pngvisu_2018-07-09_19h29m09s.pngscaler_STOP_2018-07-09_19h32m05s.png
Run 317

start: 19h08 stop: 19h30
Fixed, e738, Mon Jul 9 20:28:09 2018, Daisuke, Freddy, Louis, Valérie, RUN, General, Cryo-LH2, RUNS 318 to 320 ProblemDAQcrateCATS1RCAt20h.pngProblemDAQcrateCATS1iolan.pngProblemMergerCATSbranch.png
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running. 
We killed Narval. 
Fixed, e738, Mon Jul 9 20:33:00 2018, Daisuke Louis Valérie , RUN, General, Cryo-LH2, RUN 321- ok again ! 20x
Run 321 start 20:09 
Total beam on CATS ~ 1.7 10**5 /s 
Beam of 9C, 7Be, 8B and 6Li
Fixed, e738, Mon Jul 9 22:15:04 2018, DIdier Daisuke Nori Louis Valérie, RUN, General, Cryo-LH2, RUN 322, strip CATS2 X 19 off 7x
Run 322 start: 22h00 stop: 0h21
e748 Exxx 3,7G 10 juil. 00:21 run_0322.dat.09-07-18_21h58m34s
Beam: 9C
Ongoing, e738, Mon Jul 9 23:21:55 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0907-2.pngcell0907-2.pngregenerate0907.png
Here are the temperature logs of the liquid H2 target up to now.
I would share the log during the regeneration.
Fixed, e738, Mon Jul 9 23:25:10 2018, takeshi, RUN, General, Cryo-LH2, run summary for 10C beam 
With 10C beam, we have obtained 
31.7 hours of liq. H2 target and
1.2  hours of empty target.
Fixed, e738, Tue Jul 10 00:46:26 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 323 + Brho line settings Run323_scalersAt0h36.pngRun323_TOFcatsHF.pngRun323_ScalersEndRun.png
Run 323 start: 0h20  stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s 
Beam: 9C
Fixed, e738, Tue Jul 10 01:26:21 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C updated 6x
Used data run run0284-0302 (almost all for 10C beam)
CsI calibration parameters are the same as E755 exp (deuteron optimized),
Fixed, e738, Tue Jul 10 02:47:10 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 324 24x
Run 324 start: 2h45 stop 5h10
 e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
Fixed, e738, Tue Jul 10 05:12:31 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 325 Run325_scalersAt5h12.pngRun325_EDECsIMMpidZoomZ3Z4.pngRun325_scalersEndRunCats1TRIP.png
Run 325 start: 5h10 stop 6h53 due to CATS1 -->tripping
 e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
Beam: 9C

ELOG Home Page