Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule 
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.


CATS Mounting: 29th
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdfMUVI_card_USER_MANUAL_(ver_081013).pdf
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS

Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC

Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero
Fixed, e748, Wed May 24 09:07:59 2017, Adrien Matta, OTHER, General, , e748 Planning 

Feel free to edit this spread sheet.

spreadsheet link:  https://docs.google.com/spreadsheets/d/1QD0HMJz3DSaX7VqEz07jOG83-SyeKBIwrZzxFNN0aJk/edit#gid=1578876317

Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators 
List of Collaborators (Please edit if anyone is missing):

IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel

CEA Saclay: M. Vandebrouck, V Lapoux,

Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam

Universitad des Santiago de Compostela: B. Fernandez-Dominguez

Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont

LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.

RIKEN/TODAI: D. Susuki, S. Koyama
Fixed, e748, Wed May 24 09:32:41 2017, Adrien Matta, MUST2, Hardware, , Mounting of the telescope in G3 
The telescope has been mounted in there stand in G3.

  • Detector are now mounted and fitted with their DSSD.
  • BT test ok
  • HT test ongoing
Fixed, e748, Wed May 24 09:35:00 2017, Adrien Matta, CATS, Hardware, , BTD chambers mounting in D6 
Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
The DIN flange for BTD2 is missing.
The chamber need to be Vaccuum tested before surveyor alignement.
Fixed, e748, Wed May 24 15:48:24 2017, Adrien Matta, MUST2, Hardware, , PCB number for each telescope 
  • T1 PCB 5
  • T2 PCB 9
  • T3 PCB 7
  • T4 PCB 11
  • T5 PCB 6
  • T6 PCB 10
  • T7 PCB 3
  • T8 PCB 2
Fixed, e748, Thu Jun 1 09:29:50 2017, Adrien Matta, MUST2, Hardware, , Telescope cabling debbug in G3 
Test performed without vaccum, in the dark, cooling at 20.

  • T1 Ok
  • T2 Ok, PCB was mounted reverse
  • T3 Ok
  • T4 Ok
  • T5 Ok, after fixing capton
  • T6 Ok, cables misslabelled and inverted with T7, Capton not plug on Y card
  • T7 Ok,
  • T8 Ok,
Fixed, e748, Thu Jun 1 09:32:38 2017, Adrien Matta, MUST2, Hardware, , MUST2 cabling scheme 
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.

Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.

Telescope 5 to 8 are on the large distribution box and the second HV card. This correspond to the port side flange.

CAEN SY1527 setting has been changed accordingly.
Fixed, e748, Fri Jun 2 12:03:32 2017, Adrien, Laurent, Shumpei, MUST2, Hardware, , M2C vacuum test 
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Gailor switch on the turbo during lunch time. We reach 2e-5 mbar, but the vacuum is oscillating. Gailor suspect the gauge.
We added a second gauge, it gave 2E-4, switch to a third one, same reading.

So first gauge to be changed.

we are gradually improving vacuum so we thinks it is plastic releasing gas.

Cooling switch on to -10, blocks are cooling down successfully.

All DSSD, CsI and SiLi works with rather low current (below 0.5uA).

After three day, vacuum level rise to 6 mbar. According to Vincent; this is standard for static vacuum, so no sign of major leak.
Fixed, e748, Tue Jun 6 09:07:34 2017, Adrien Matta, BEAM, General, , Moving to D6 
M2C Chamber now in D6 after a smooth ride, ready to be aligned.
Ongoing, e748, Tue Jun 6 17:57:07 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 EXL_MUST2_top.png

EXL seems to fit in Adrien's setup. We still have to check if it fits in the chamber.
Fixed, e748, Tue Jun 6 18:17:03 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 EXL_MUST2_top.jpgEXL_MUST2_side.jpg
EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the chamber.
Fixed, e748, Wed Jun 7 11:29:55 2017, Adrien, MECH, Hardware, N/A, Surveyor mesurement 
The surveyor are carrying out the measurement of the detectors in D6.
The measurement should take the day, starting with the main plate, and then in the afternoon the detectors.

All measurement done, WAITING FOR REPORT.
Fixed, e748, Wed Jun 7 18:03:02 2017, Franck, OTHER, Hardware, , LPC electronics 
Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
Lecroy Coinc 465: E2229
Lecroy FIFO 429A: E2631A, E2600, 98971, 01175B
Lecroy NIM-ECL 4616: E2559, E2321, 82791
Quad CFD 7174: 042, 046, 047, 051, 117, 206
Octal FAN-OUT 364: E2315
QDC VXI 3214 410pC
Wiener NIM Crate 600 W
Fixed, e748, Thu Jun 8 18:57:14 2017, Valérie Lapoux, MUST2, Hardware, , Currents and Voltages on MUST2  
Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature at -5°C.
Low voltages and HV ON
MUST2 "nominal" voltages and currents:
-----------------------------------------------------
DSSD T1 pcb5 80V ; ~1.7 µA | CsI 50V (~nA)
-----------------------------------------------------
DSSD T2 pcb9 80V ; ~1.4 µA | CsI 50V
-----------------------------------------------------
DSSD T3 pcb7 70V ; ~1. µA | CsI 50V
-----------------------------------------------------
DSSD T4 pcb11 80V ; ~1. µA | CsI 50V
--------------------------------------------------------------------
DSSD T5 pcb6 80V ; ~ 0.4 µA | SiLiT5-1 700V 10.72 µA ; SiLiT5-2 700V 2.16µA
--------------------------------------------------------------------
DSSD T6 pcb10 80V ; ~1.7 µA | CsI 50V
-----------------------------------------------------------
DSSD T7 pcb3 80V ; ~1.7 µA | CsI 50V
--------------------------------------------------------------------
DSSD T8 pcb2 60V ; ~1.7 µA | SiLiT8-1 700V 2.46 µA | SiLiT8-2 600V 3.4 µA
--------------------------------------------------------------------
Fixed, e748, Fri Jun 9 12:30:49 2017, Adrien, VACUUM, Hardware, , Vacuum Leaks 
We reach a stable 1e-5 mbar. We performed a leak check and identify that the Ionisation chamber gate valve is not totally tight, I don't think there is much to be done.
One of the M2C flange also have a micro leak, that we will solve next tuesday when reopening the chamber.

NOW FIXED
Fixed, e748, Fri Jun 9 12:33:25 2017, Adrien, MECH, General, , MUST2 position 
After a the surveyor came we figured out the MUST2 telescope are 1cm too high with respect to the beam line.
Vincent is preparing new feet to replace the one supporting the main plate. We will support the plate with adjustable one while replacing the other so there is no need to dismount any detector.




NOW FIXED:

Vincent Morel and Laurent Meneger put in the new fit without unmounting the detector. all went smoothly.
Fixed, e748, Fri Jun 9 12:34:18 2017, Adrien, DAQ, Hardware, , Hub 
We are currentlky waiting for the hub to be configured so we can start the MUST2 DAQ. Should be done in the afternoon.
Fixed, e748, Fri Jun 9 12:35:46 2017, Adrien, MUST2, Hardware, , CsI trip on T6 
The detector were left on during the night. T6 CsI trip and cannot be switch on again. Once we established that all the MUFFEE works correctly we will start investigating the issue, perhaps coming from the distribution box.


NOW FIXED:

Not really clear what was the issue, Most likely a loose HT cables on the feedthrough flange.