MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 42 of 48  Not logged in MUST2
Statusdown ExpNbr Date Author Type Category Target-Source Subject Text Attachments
Fixede738 Sun Jul 8 07:00:46 2018 PierreRUNGeneralCryo-LH2Run 287start: 07h01
stop: 08h55
 8x 
Fixede738 Sun Jul 8 07:19:45 2018 ShumpeiOFFLINEGeneralCryo-LH2Analysis for 10C(p,d)9C and 10C(p,t)8CUsed data : Run 0284 &  0285 (about 4 hours
data)
CsI energy calibration parameters are from
 pd_fig1.pdfpd_fig2.pdfpt_fig1.pdfpt_fig2.pdf 
Fixede738 Sun Jul 8 09:14:18 2018 takeshi, Didier, ValérieRUNGeneralCryo-LH2RUNS 288-290RUN 288
10C + liq H2
start 08h56 stop 10h56
 11x 
Fixede738 Sun Jul 8 14:23:43 2018 ValérieRUNGeneralCryo-LH2RUN Summary and MUST2, DAQ conditionsMUST2 
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png
 12x 
Fixede738 Sun Jul 8 14:57:40 2018 Daisuke, Didier, ValérieRUNGeneralCryo-LH2RUN 291 overviewBeam 10C between 9.10**4 and 10**5/s 
dead time between 7 and 12%
 Run 291 start 13h47 stop 15h51
 14x 
Fixede738 Sun Jul 8 16:03:06 2018 Daisuke, Didier, ValérieRUNGeneralCryo-LH2RUN 292 -still 10CBeam 10C around 1. and 1.1 10**5/s 
dead time between 6 and 12%
 Run 292 start 15h51 stop 16h19 to change
 run292ScalersAt16h02.png 
Fixede738 Sun Jul 8 16:28:56 2018 Daisuke, Didier, ValérieRUNGeneralCryo-LH2RUN 293From Run 293  CATS1 HV = 640V I ~ 0.16 ľA
; CATS2 660V I ~ 0.10 ľA 
 Run 293 start 16h22; stop at 17h30   
 run293ScalersAt16h31.png 
Fixede738 Sun Jul 8 17:36:47 2018 Daisuke, Didier, ValérieRUNGeneralCryo-LH2RUN 294Run 294 start 17h31  stop 17h50 due to the
trip of CATS1.
748 Exxx 403M  8 juil. 17:50 run_0294.dat.08-07-18_17h31m47s
 run294ScalersAt17h35.png 
Fixede738 Sun Jul 8 17:59:12 2018 Daisuke, Takeshi, ValérieRUNGeneralCryo-LH2RUN 295Run 295 start 17h52 stop at 19h52
Beam stop occurred during 19h39 and 19h42
(alarm at the machine)
 26x 
Fixede738 Sun Jul 8 20:00:42 2018 Daisuke, Takeshi, ValérieRUNGeneralCryo-LH2RUN 296 +(on-line) eff of CATSRun 296 start 19h52 stop at 21h51

e748 Exxx 3,1G  8 juil. 21:51 run_0296.dat.08-07-18_19h52m46s
 11x 
Fixede738 Sun Jul 8 21:50:58 2018 Daisuke, Takeshi, ValérieRUNGeneralCryo-LH2RUN 297Run 297 start 21h51 (8th July)  stop at 0h
(9th July)
e748 Exxx 3,0G  9 juil. 00:00 run_0297.dat.08-07-18_21h50m55s
 15x 
Fixede738 Mon Jul 9 00:03:24 2018 Benoit, Megumi, Takeshi, ValérieRUNGeneralCryo-LH2RUN 298Run 298 start 0h (9th July) stop at 02h02
e748 Exxx 2,9G  9 juil. 02:02 run_0298.dat.08-07-18_23h59m40s
Beam stop occurred from 01h06 to 01h09 (rotation
 run298_ScalersAt0h10.pngscaler_2018-07-09_02h01m34s.pngvisu_2018-07-09_02h01m41s.pngvisu_2018-07-09_02h01m44s.pngvisu_2018-07-09_02h01m52s.png 
Fixede738 Mon Jul 9 00:25:30 2018 NoriCATSGeneralN/ACATS tracking efficiencyWe noticed that the tracking efficiency was
only 70% while the timing efficiencies were
around 95%.
 8x 
Fixede738 Mon Jul 9 02:16:19 2018 Benoit, MegumiRUNGeneralCryo-LH2RUN 299Run 299 start 02h01 (9th July) stop at 04h03
e748 Exxx 2,9G  9 juil. 04:03 run_0299.dat.09-07-18_02h01m29s
 scaler_2018-07-09_02h20m00s.pngvisu_2018-07-09_04h04m37s.pngvisu_2018-07-09_04h04m53s.png 
Fixede738 Mon Jul 9 04:22:21 2018 Benoit, MegumiRUNGeneralCryo-LH2RUN 300Run 300 start 04h02 (9th July) stop at 06h04
e748 Exxx 2,8G  9 juil. 06:05 run_0300.dat.09-07-18_04h02m08s
 scaler_2018-07-09_04h17m03s.pngvisu_2018-07-09_05h55m54s.pngvisu_2018-07-09_05h56m57s.pngvisu_2018-07-09_06h00m30s.png 
Fixede738 Mon Jul 9 06:21:54 2018 Benoit, MegumiRUNGeneralCryo-LH2RUN 301Run 301 start 06h04 (9th July) stop at 7h51

 scaler_2018-07-09_06h13m13s.pngscaler_2018-07-09_07h51m37s.png 
Fixede738 Mon Jul 9 07:55:05 2018 PierreRUNGeneralCryo-LH2Run 302start: 07h53
stop: 08h19
 scaler_2018-07-09_07h57m43s.pngvisu_2018-07-09_07h59m57s.pngvisu_2018-07-09_08h00m04s.pngvisu_2018-07-09_08h04m11s.png 
Fixede738 Mon Jul 9 08:00:11 2018 takeshiTARGETHardwareCryo-LH2temperature log of the targetHere are the temperature log of the cyo H2
target during the 10C setting.
 heatshield0907.pngcell0907.png 
Fixede738 Mon Jul 9 08:55:13 2018 Pierre DaisukeRUNGeneralEmptyRun 303start: 08h27
stop: 08h50
  
Fixede738 Mon Jul 9 08:56:50 2018 Pierre DaisukeRUNGeneralCryo-emptyRun 304start: 08h54
stop: 10h00
 scaler_2018-07-09_08h57m21s.pngvisu_2018-07-09_09h03m24s.pngvisu_2018-07-09_09h03m30s.pngvisu_2018-07-09_09h04m05s.pngvisu_2018-07-09_09h04m21s.png 

ELOG Home Page