MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 41 of 48  Not logged in MUST2
Fixed, e738, Sun Jul 8 00:45:44 2018, takeshi, RUN, General, N/A, run summary 
The runsummary for this E738 experiment is available at the same place as previous e755 experiment.

https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919
Fixed, e738, Sun Jul 8 01:24:16 2018, Pierre, RUN, General, Cryo-LH2, Run 284 scaler_2018-07-08_01h25m36s.pngvisu_2018-07-08_01h26m12s.pngscaler_2018-07-08_03h10m42s.png
start: 1h15 
stop: 3h11
Fixed, e738, Sun Jul 8 03:13:35 2018, Pierre, RUN, General, Cryo-LH2, Run 285 scaler_2018-07-08_03h13m06s.pngvisu_2018-07-08_03h19m50s.pngvisu_2018-07-08_03h19m13s.pngvisu_2018-07-08_03h19m27s.pngvisu_2018-07-08_03h20m19s.png
start: 03h12
stop: 05h10
Fixed, e738, Sun Jul 8 05:09:11 2018, Pierre, RUN, General, Cryo-LH2, Run 286 13x
start: 05h11
stop: 07h00
Fixed, e738, Sun Jul 8 07:00:46 2018, Pierre, RUN, General, Cryo-LH2, Run 287 8x
start: 07h01
stop: 08h55
Fixed, e738, Sun Jul 8 07:19:45 2018, Shumpei, OFFLINE, General, Cryo-LH2, Analysis for 10C(p,d)9C and 10C(p,t)8C pd_fig1.pdfpd_fig2.pdfpt_fig1.pdfpt_fig2.pdf
Used data : Run 0284 &  0285 (about 4 hours data)
CsI energy calibration parameters are from previous experiment, optimized for deuteron
Ongoing, e738, Sun Jul 8 08:53:44 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target cell0807.pngheatshield0807.pngtempepature0807.png
 
Fixed, e738, Sun Jul 8 09:14:18 2018, takeshi, Didier, Valérie, RUN, General, Cryo-LH2, RUNS 288-290 11x
RUN 288
10C + liq H2
start 08h56 stop 10h56
Fixed, e738, Sun Jul 8 14:23:43 2018, Valérie, RUN, General, Cryo-LH2, RUN Summary and MUST2, DAQ conditions 12x
MUST2 
Physical thresholds ~ 400 keV see DASmust2T4Thres400keV.png 
Pedestals see snapshots DASmust2T1pedestalsThr.png ; 
Fixed, e738, Sun Jul 8 14:57:40 2018, Daisuke, Didier, Valérie, RUN, General, Cryo-LH2, RUN 291 overview 14x
Beam 10C between 9.10**4 and 10**5/s 
dead time between 7 and 12%
 Run 291 start 13h47 stop 15h51
Fixed, e738, Sun Jul 8 16:03:06 2018, Daisuke, Didier, Valérie, RUN, General, Cryo-LH2, RUN 292 -still 10C run292ScalersAt16h02.png
Beam 10C around 1. and 1.1 10**5/s 
dead time between 6 and 12%
 Run 292 start 15h51 stop 16h19 to change CATS HV.
Fixed, e738, Sun Jul 8 16:28:56 2018, Daisuke, Didier, Valérie, RUN, General, Cryo-LH2, RUN 293 run293ScalersAt16h31.png
From Run 293  CATS1 HV = 640V I ~ 0.16 ľA ; CATS2 660V I ~ 0.10 ľA 
 Run 293 start 16h22; stop at 17h30   
e748 Exxx 1,9G  8 juil. 17:30 run_0293.dat.08-07-18_16h19m54s
Fixed, e738, Sun Jul 8 17:36:47 2018, Daisuke, Didier, Valérie, RUN, General, Cryo-LH2, RUN 294 run294ScalersAt17h35.png
Run 294 start 17h31  stop 17h50 due to the trip of CATS1.
748 Exxx 403M  8 juil. 17:50 run_0294.dat.08-07-18_17h31m47s
Fixed, e738, Sun Jul 8 17:59:12 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 295 26x
Run 295 start 17h52 stop at 19h52
Beam stop occurred during 19h39 and 19h42 (alarm at the machine)
Fixed, e738, Sun Jul 8 20:00:42 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 296 +(on-line) eff of CATS 11x
Run 296 start 19h52 stop at 21h51

e748 Exxx 3,1G  8 juil. 21:51 run_0296.dat.08-07-18_19h52m46s
Pinned, e738, Sun Jul 8 21:05:50 2018, daisuke, OTHER, General, N/A, Phase space simulation: 10C(p,t)8C and 9C(p,d)8C pt_sim_phase_plot_8c_t.pdfpt_sim_phase_plot_8c_d.pdf
 
Fixed, e738, Sun Jul 8 21:50:58 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 297 15x
Run 297 start 21h51 (8th July)  stop at 0h (9th July)
e748 Exxx 3,0G  9 juil. 00:00 run_0297.dat.08-07-18_21h50m55s
MISSING STRIP, Y12 of CATS1 since run 296. see run297_CATSQRaw.png
Fixed, e738, Mon Jul 9 00:03:24 2018, Benoit, Megumi, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 298 run298_ScalersAt0h10.pngscaler_2018-07-09_02h01m34s.pngvisu_2018-07-09_02h01m41s.pngvisu_2018-07-09_02h01m44s.pngvisu_2018-07-09_02h01m52s.png
Run 298 start 0h (9th July) stop at 02h02
e748 Exxx 2,9G  9 juil. 02:02 run_0298.dat.08-07-18_23h59m40s
Beam stop occurred from 01h06 to 01h09 (rotation speed failing of the LISE target)
Fixed, e738, Mon Jul 9 00:25:30 2018, Nori, CATS, General, N/A, CATS tracking efficiency 8x
We noticed that the tracking efficiency was only 70% while the timing efficiencies were around 95%.
By lowering the thresholds (see Attachment 5-8) 89% tracking efficiency was achieved.
Note: analyzed run 293 (CATS1 640V, CATS2 670V), first 10000 events, only CATS trigger was selected.
Fixed, e738, Mon Jul 9 02:16:19 2018, Benoit, Megumi, RUN, General, Cryo-LH2, RUN 299 scaler_2018-07-09_02h20m00s.pngvisu_2018-07-09_04h04m37s.pngvisu_2018-07-09_04h04m53s.png
Run 299 start 02h01 (9th July) stop at 04h03
e748 Exxx 2,9G  9 juil. 04:03 run_0299.dat.09-07-18_02h01m29s

ELOG Home Page