Ongoing, e755, Sat Jun 23 19:10:23 2018, Nori, OFFLINE, General, Cryo-LH2,  
 
Fixed, e755, Sat Jun 23 19:41:49 2018, Valerian, OFFLINE, General, Cryo-LH2, De_E plot DE_E_run81.pdf
 
Fixed, e755, Sat Jun 23 19:23:19 2018, Nori, OFFLINE, General, Cryo-LH2, 40Ca(p,d) analysis 7x
Analysis of run0072 (two hours accumulation).

Attachment 1:
    Fixed, e755, Sat Jun 23 20:07:49 2018, Nori, OFFLINE, General, Cryo-LH2, 40Ca(p,d) analysis 
Order-of-magnitude estimate of the target thickness.

We have about 5000 counts of 40Ca(p,d)39Ca(g.s.) in an angular range of 10-30 degrees.
Fixed, e755, Sat Jun 23 20:09:00 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Summary of Runs 83 and 84 19x
CATS beam 1.7 10**5 /s
Run 84 start @ 19h54 stop @ 20h16 on problem with CO. 
the PCP said: Maybe 10 minutes of beam stop. Let's see.
Fixed, e755, Sat Jun 23 20:56:15 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Run 85 Run85_scalersAt20h48.pngrun85Catsprofiles.png
CATS beam 1.8 10**5 /s
Beam back at 20h46
Run 85 start @ 20h46 stop @21h02
Fixed, e755, Sat Jun 23 21:17:03 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 86-Test measurement, (heating target) run86Scalersat21h17.png
CATS beam 1.8 10**5 /s
 Target temperature increasing during the run. 
Run 86 start @ 21h05 stop @21h41
Fixed, e755, Sat Jun 23 21:51:04 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 87-Empty target measurement run87Scalersat21h50.png
CATS beam 1.8 10**5 /s
  
Run 87 start @ 21h42 stop @ 21h52
Fixed, e755, Sat Jun 23 21:52:01 2018, takeshi, TARGET, Hardware, N/A, evaporation of the H2 target evapolation2206.png
Here is the temperature log when we evaporate the liquid H2 by heater.
The black line is what we call sensor A, which we monitor usually, and the red line is sensor B, which is the closest sensor to the target window.
Fixed, e755, Sat Jun 23 22:03:17 2018, takeshi, TARGET, Hardware, , temperasure log of the target temperature2306_3.pngheatshield2306_3.pngcell2306_3.png
I would report the temperature log of the liquid hydrogen target.
We consider it was liquid during the beam time up to now by the beam profile data on the target.
Fixed, e755, Sat Jun 23 22:08:43 2018, e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie, RUN, General, Cryo-LH2, Run 88-Empty target measurement 10x
CATS beam 1.8 10**5 /s
  
Run 88 start @ 22h07 
Fixed, e755, Sat Jun 23 22:42:33 2018, e755 - Louis, Valérie, MUST2, Hardware, Cryo-LH2, Status of MUST2 telescopes 23 june 18 TempMuvi1MufeeXTel1.pngTempMuvi2MufeeYTel6.pngTempMuvi2MufeeXTel6.pngTempMuvi2MufeeXTel8.pngRun88scalersAt23hORDI.png
Temperatures on the Mufeex-Y cards:

Temperature set on the regulator -4°C. 
Fixed, e755, Sat Jun 23 22:47:21 2018, daisuke, TARGET, Hardware, N/A, Target images for Liq. H and empty target run85Catsprofiles.pngRun88emptyT_CATSbeam.png
Attachment 1: RUN 85 with liq.H
Attachment 2: RUN 88 with empty cell. 
Fixed, e755, Sat Jun 23 23:31:12 2018, e755 - Louis, Valérie, RUN, General, Cryo-LH2, Run 89-Empty target measurement Run89CatsProfile.png
CATS beam 1.5 10**5 /s
  
Run 89 start @ 23h29 
Fixed, e755, Sat Jun 23 23:38:32 2018, takeshi, RUN, Social, Cryo-LH2, run summary for 40Ca beam 
run 63-85, total 15.4 hours data was taken

start                           stop          duration  runname
Fixed, e755, Sun Jun 24 09:48:46 2018, Francois, BEAM, General, , No beam 
9H10: D5 stopped at 9H10. We asked for the beam.

9H48: Still no beam.  There is a problem with the beam current limits set in the accelerator. They have to change it from 40 nAe between CO1 and CSS1 
Fixed, e755, Sun Jun 24 12:10:35 2018, takeshi, TARGET, Hardware, , target temperature during warming up warming2406.png
I would share the temperature log of the target cell during warming it up.
The thick line is the heat shield and the thin line is the cell. 
The heat shield may takes 2 hours to reach 200 K and 6 hours for 270K.
Fixed, e755, Sun Jun 24 13:20:51 2018, takeshi, TARGET, Hardware, N/A, start target cooling cooling.png
We started cooling the target cell at 13h03.
It would take 4 - 5 hours to cooling the cell enough low for liquifying hydrogen.
 
Fixed, e755, Sun Jun 24 13:25:30 2018, Fred, valérian, daisuke, DAQ, Software, N/A, Scalers to be recorded run_0092_scaler_record_check.png
The U2M scaler data cannot be recorded to the data in the current version of Narval. So there were no scaler data during the measurement of 40Ca.

To resolve the situation, we added register parameters for specified channels of U2M. This allows us to record the counts of a given channel at each event.
Fixed, e755, Sun Jun 24 16:11:38 2018, daisuke, ONLINE, Software, N/A, Automated screenshot screenshot_2018-06-24_18h06m11s.pngscreenshot.sh
automated screenshot commands

shot: Capture the window selected by the mouse
Fixed, e755, Sun Jun 24 19:51:09 2018, Faïrouz, daisuke, MUST2, Software, N/A, MUST2 threshold from 1 MeV to 0.4 MeV das_2018-06-24_19h33m36s.pngdas_2018-06-24_19h49m33s.png
It was found that the energy threshold of the strips was as high as 1 MeV. This threshold setting was chosen for the calibration and was never set back
to the nominal threshold (0.4 MeV) for experiments.