Fixed, e755, Sun Jun 24 21:12:25 2018, e755- Valérie, DAQ, Hardware, , GMT chronogrammes GMTchronoMaster.pngGMTslaveChrono.png
Since Run 103 
MASTER FAG 100 ns
SLAVE 100 ns
Fixed, e755, Sun Jun 24 21:36:24 2018, e755-Daisuke, Louis, Olivier, Pierre, Valérie, RUN, General, Cryo-empty, Summary of the evening runs 101-105 
 run 101 Trigger Cats 2 div; div =1
Run 102
run 103
Fixed, e755, Sun Jun 24 22:13:29 2018, takeshi, TARGET, Hardware, N/A, temperature log of the target temperature2406.pngliquiefy2406.png
We liquefied the hydrogen target around 22:00. 
I would share the temperature log of the liquid hydrogen target during cooling and liquifying.
Black line is today and the other colors represent the references , The thicker liens are the heat shield and the thinner lines are the cell.
Fixed, e755, Sun Jun 24 22:13:30 2018, valérie, daisuke, RUN, General, Cryo-empty, RUN 106 empty target run 6x
 Run 106 Trigger: MUST2 all
start @ 21h31; stop @21h44
e748 Exxx 168154021 24 juin 21:44 /data/e748X/e755/acquisition/run/run_0106.dat.24-06-18_21h31m26s
Fixed, e755, Sun Jun 24 22:18:50 2018, Daisuke, Louis, Olivier, Valérie, RUN, General, Cryo-LH2, RUN 107  Run107scalersAt22h17.pngTriggerMMandCATSRun107.pngTriggerMM2Run107ProfileCats.png
run 107 start@ 22h15; stop@ 22h37
e748 Exxx  689278077 24 juin  22:37 /data/e748X/e755/acquisition/run/run_0107.dat.24-06-18_22h15m16s
Fixed, e755, Sun Jun 24 22:25:53 2018, shumpei, MUST2, Hardware, Cryo-empty, threshold for DSSDs of MUST2 pid_threshold.pdf
Threshold of DSSDs were changed (see entry 638).
Run 106 was analyzed and now the threshold seems about 0.4 MeV.
Fixed, e755, Sun Jun 24 22:26:46 2018, Daisuke, Louis, Olivier, Valérie, MUST2, General, Cryo-LH2, HV on MUST2, currents, CATS HVonMUST2mm1to4.pngHVonMUST2mm5to8andCats.png
NB: SiLi1 T7 has tripped during the evening (since Run 104)
It should be put on again (better to increase the HV during a beam stop) 
Fixed, e755, Sun Jun 24 22:45:41 2018, Daisuke, Fairouz, Louis, Olivier, Valérie, RUN, General, Cryo-LH2, RUN 108 Run108_TriggersCats.pngRun108_scalersAt22h43.png
Run 108 24 june start @ 22h38 stop@ 22h54
e748 Exxx   10068143 24 juin  22:54 /data/e748X/e755/acquisition/run/run_0108.dat.24-06-18_22h38m15s
Triggers Cats 1 and Cats2 DIV= 3.10**4
Fixed, e755, Sun Jun 24 23:07:45 2018, Daisuke, Fairouz, Louis, Olivier, Valérie, RUN, General, Cryo-LH2, RUN 109 Run109_ScalersAt22h56.pngRun109_CaTSslits10-8.5mm_W1.4kV.pngRun109_CaTSslitsFV43at10mm_W2kV.pngRun109filledTargetOKat16KprojBinY.pngRun109_ProfileCatsTargetFrame.png
Run 109 24 june start @ 22h54 stop@ 23h14
e748 Exxx    9723325 24 juin  23:14 /data/e748X/e755/acquisition/run/run_0109.dat.24-06-18_22h54m26s
Triggers Cats 1 and Cats2 DIV= 3.10**4
Fixed, e755, Sun Jun 24 23:17:01 2018, Daisuke, Fairouz, Olivier, Valérie, RUN, General, Cryo-LH2, RUN 110 Run110-projCATS2-CAVIAR.png
Run 110 24 june start @  23h15 stop @ 23h56 
e748 Exxx 1339167483 24 juin  23:56 /data/e748X/e755/acquisition/run/run_0110.dat.24-06-18_23h14m53s
All Triggers: MUST2 and Cats 1 and Cats2 DIV= 3.10**4
Fixed, e755, Mon Jun 25 00:13:48 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 111 16x
Run 111  25th June start @ 0h stop @1h13

e748 Exxx 3590054877 25 juin  01:14 /data/e748X/e755/acquisition/run/run_0111.dat.24-06-18_23h59m52s
Fixed, e755, Mon Jun 25 01:17:47 2018, Valérie +Lise team: Jean-Charles+Target: Takeshi, RUN, General, Cryo-LH2, RUN 112 6x
Run 112 25th June start @ 1h14 stop @ 2h34
e748 Exxx 3769078581 25 juin  02:34 /data/e748X/e755/acquisition/run/run_0112.dat.25-06-18_01h14m03s
 Target seems to be still ok and filled! see CATS plot on target
Fixed, e755, Mon Jun 25 02:34:30 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 113 11x
Run 113 25th June start @ 2h34 stop @ 3h57
e748 Exxx 3957925525 25 juin  03:57 /data/e748X/e755/acquisition/run/run_0113.dat.25-06-18_02h34m10s
  
Fixed, e755, Mon Jun 25 03:14:38 2018, e755- Valérie, MUST2, Hardware, Cryo-LH2, HV on MUST2, currents, CATS 
HV and currents on DSSDs and SiLi at 3h20

Telescopes T
Fixed, e755, Mon Jun 25 03:58:22 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUN 114 9x
Run 114 25th June start @ 3h57 stop @5h34

 e748 Exxx 4015552641 25 juin  05:34 /data/e748X/e755/acquisition/run/run_0114.dat.25-06-18_03h57m34s
Fixed, e755, Mon Jun 25 05:34:53 2018, Valérie +Target: Takeshi, RUN, General, Cryo-LH2, RUNS 115, 115.1 and 116 Run115ScalersAt5h37.pngRun115ScalersAt6h39.pngRun115b1_scalersAt7h20.pngRun115b1BeamProfile.pngRun116_ScalersAt8h26.png
Run 115 25th June start @ 5h34 stop@6h57
 e748 Exxx 4190541701 25 juin  06:57 /data/e748X/e755/acquisition/run/run_0115.dat.25-06-18_05h34m33s
  -------------------------------------------------------------------------------
Fixed, e755, Mon Jun 25 07:41:54 2018, e755- Valérie, MUST2, Hardware, Cryo-LH2, SUMMARY-Missing strips MUST2 Run116_MMimpacts.pngRun116_Mm1toMM4StrXYE.png
 
Telescopes MM1 to MM8, XY ET missing strips
----------------------------------------------------
Fixed, e755, Mon Jun 25 08:38:34 2018, e755 Louis Francois Marlene, OFFLINE, General, Cryo-LH2, 38Ca(p,d)37Ca 38Capd_Run_110.pdf38Capd_Run_110_deE.pdf
Here Kine;atics line for th 38Ca(p,d)37Ca Channel from run 110
Fixed, e755, Mon Jun 25 10:42:47 2018, daisuke, TARGET, Software, Cryo-empty, RUN 106 (38Ca with empty target) S/N 7x
p, d, t ratio of events from the target frame and from the target aperture (covered by Havar 6.5 micron and Mylar 2 micron)

R(d/p) = 0.3 (frame)  0.14 (target)
Fixed, e755, Mon Jun 25 11:12:40 2018, Marlene, Louis, RUN, General, Cryo-LH2, Run 117, 38Ca, Target filled 6x
Run 117 started @ 10h54
stopped @ 11h32 to enter in the room