Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e755 |
Sat Jun 23 06:10:01 2018 |
shumpei | OFFLINE | Software | CH2 | 40Ca(p,d)39 reaction | Quick off-line analysis for 40Ca(p,d)39 reaction
is shown.
Used gate - target image and dE-E cut for |
   |
| e755 |
Sat Jun 23 06:16:25 2018 |
Louis | OFFLINE | | | | |
|
Fixed | e755 |
Sat Jun 23 14:07:40 2018 |
Valerian Fairouz | RUN | General | N/A | Problem from Narval | Narval actors went crazy see joined images
run 75 must be trash as it created 18 files |
|
Fixed | e755 |
Sat Jun 23 17:07:35 2018 |
daisuke | RUN | Social | Cryo-LH2 | Run summary 40Ca(p,t) |
total 698 min or 11.6 hours (RUN 63 to 81)
|
|
Fixed | e755 |
Sat Jun 23 18:01:58 2018 |
Valerian Maurycy | OFFLINE | General | Cryo-LH2 | Kinematics Line | Using Run 63-64 we drew Kinematics Lines. |
   |
Ongoing | e755 |
Sat Jun 23 19:10:23 2018 |
Nori | OFFLINE | General | Cryo-LH2 | | |
|
Fixed | e755 |
Sat Jun 23 19:23:19 2018 |
Nori | OFFLINE | General | Cryo-LH2 | 40Ca(p,d) analysis | Analysis of run0072 (two hours accumulation).
Attachment 1:
|
7x |
Fixed | e755 |
Sat Jun 23 19:41:49 2018 |
Valerian | OFFLINE | General | Cryo-LH2 | De_E plot | |
|
Fixed | e755 |
Sat Jun 23 20:07:49 2018 |
Nori | OFFLINE | General | Cryo-LH2 | 40Ca(p,d) analysis | Order-of-magnitude estimate of the target
thickness.
|
|
Fixed | e755 |
Sat Jun 23 20:09:00 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Summary of Runs 83 and 84 | CATS beam 1.7 10**5 /s
Run 84 start @ 19h54 stop @ 20h16 on problem
with CO.
|
19x |
Fixed | e755 |
Sat Jun 23 20:56:15 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Run 85 | CATS beam 1.8 10**5 /s
Beam back at 20h46
Run 85 start @ 20h46 stop @21h02
|
 |
Fixed | e755 |
Sat Jun 23 21:17:03 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 86-Test measurement, (heating target) | CATS beam 1.8 10**5 /s
Target temperature increasing during the
run.
|
|
Fixed | e755 |
Sat Jun 23 21:51:04 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 87-Empty target measurement | CATS beam 1.8 10**5 /s
Run 87 start @ 21h42 stop @ 21h52
|
|
Fixed | e755 |
Sat Jun 23 21:52:01 2018 |
takeshi | TARGET | Hardware | N/A | evaporation of the H2 target | Here is the temperature log when we evaporate
the liquid H2 by heater.
The black line is what we call sensor A, |
|
Fixed | e755 |
Sat Jun 23 22:03:17 2018 |
takeshi | TARGET | Hardware | | temperasure log of the target | I would report the temperature log of the
liquid hydrogen target.
We consider it was liquid during the beam |
  |
Fixed | e755 |
Sat Jun 23 22:08:43 2018 |
e755 - Louis, Daisuke,Shumpei, Takeshi, Nori, Valérie | RUN | General | Cryo-LH2 | Run 88-Empty target measurement | CATS beam 1.8 10**5 /s
Run 88 start @ 22h07
|
10x |
Fixed | e755 |
Sat Jun 23 22:42:33 2018 |
e755 - Louis, Valérie | MUST2 | Hardware | Cryo-LH2 | Status of MUST2 telescopes 23 june 18 | Temperatures on the Mufeex-Y cards:
Temperature set on the regulator -4°C.
|
    |
Fixed | e755 |
Sat Jun 23 22:47:21 2018 |
daisuke | TARGET | Hardware | N/A | Target images for Liq. H and empty target | Attachment 1: RUN 85 with liq.H
Attachment 2: RUN 88 with empty cell.
|
 |
Fixed | e755 |
Sat Jun 23 23:31:12 2018 |
e755 - Louis, Valérie | RUN | General | Cryo-LH2 | Run 89-Empty target measurement | CATS beam 1.5 10**5 /s
Run 89 start @ 23h29
|
|
Fixed | e755 |
Sat Jun 23 23:38:32 2018 |
takeshi | RUN | Social | Cryo-LH2 | run summary for 40Ca beam | run 63-85, total 15.4 hours data was taken
start stop |
|