Fixede748 Sat Jun 17 10:56:09 2017 Adrien MattaBEAMGeneral JC Thomas plans for the beam productionHere are a few notes by Jean Charles about
the expected LISE setting based on 2013 and
2014 16C tuning.
 REX-E628.pdf 
Fixede748 Mon Jun 19 16:03:18 2017 e748EXLGeneral Progress On EXLWe fiddled around with EXL trying to get a
reasonnable 60Co spectrum.
  
Fixede748 Mon Jun 19 16:04:51 2017 e748RUNGeneral3-alphaRun 15Run 15 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
  
Fixede748 Mon Jun 19 16:36:07 2017 e748EXLHardware Gain changed on EXLRun 15 online analysis showed waht we believe
was 4 MeV range.
  
Fixede748 Mon Jun 19 16:36:31 2017 e748RUNGeneral60CoRun 16Run 16 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
  
Fixede748 Mon Jun 19 18:02:16 2017 e748RUNGeneral60CoRun 17Run 15 is started.
We have a 3 alpha source in target position
and a 60Co on the window flange.
  
Fixede748 Mon Jun 19 18:07:55 2017 e748EXLHardware Threshold changed on EXLRun 15 online analysis showed what we believe
was 4 MeV range.
  
Fixede748 Tue Jun 20 09:08:46 2017 e748EXLGeneral EXL Spectrum with 60Co sourceHere is a spectrum of EXL after one night
of accumulating stat on 60Co.
 exl_60co.ps 
Fixede748 Wed Jun 21 09:05:26 2017 Adrien Matta, Phil AdsleyMUST2General MUST2 Dead TimeWe cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in
coincidence with the DT output of the GMT
  
Fixede748 Wed Jun 21 09:39:38 2017 e748DAQGeneral Backup of config fileganacq manip back up.  must2.tar.gz 
Fixede748 Thu Jun 22 10:24:12 2017 e748CATSSoftware Manip config file backup before mergeManip config file backup before merge  e748_cats.tar.gz 
Fixede748 Thu Jun 22 11:10:35 2017 ValérianEXLSoftware EXL MappingMapping of the EXL detector in the analysis
program versus how it is written on the cables.
 Mapping_of_EXL_in_analysis.pdf 
Fixede748 Thu Jun 22 17:46:45 2017 e748MUST2Hardware MUST2 SL cable repairThree cables came back from ASCO, two of them
were the original spare cables.
  
Fixede748 Thu Jun 22 17:49:20 2017 Adrien and Phil MUST2General MUST2 telescope test with alpha sourceAll Telescope now pass the I2C test.

We ran with an alpha source (attached pictures
 T14_X.pdfT14_Y.pdfT58_X.pdfT58_Y.pdf 
Fixede748 Thu Jun 22 17:55:52 2017 e748MUST2Hardware Surveyor mesurementThe surveyor are missing some point for the
telescope measurement.
  
Fixede748 Fri Jun 23 09:18:14 2017 e748OTHERGeneral Plan for 23rd of JuneWe have to open today, I started warming up
of the telescope at 9h18 today.
  
Fixede748 Fri Jun 23 09:20:33 2017 e748OTHERGeneral Plan for coming days23rd of June:
    Fix T5
    Surveyor measurement
  
Fixede748 Fri Jun 23 16:37:54 2017 Adrien, Laurent, VincentOTHERHardware MUST2 chamber openingWe opened the chamber and the surveyor took
there measurement.
 IMG_1936.JPG 
Fixede748 Fri Jun 23 20:49:49 2017 AdrienMUST2General RestartChamber at 2e-5, cooling -9deg outside; -5
on copper LV off.
  
Fixede748 Sat Jun 24 21:41:30 2017 e748MUST2General Pedestal alignement and calibrationMUSt2 pedestal aligned for all telescope.

Started alpha run with all telescope in trigger
  