MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
MUST2, Page 3 of 48
Not logged in
Find
|
Login
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
954 Entries
Goto page
Previous
1
,
2
, 3,
4
...
46
,
47
,
48
Next
Status
ExpNbr
Date
Author
Type
Category
Target-Source
Subject
Text
Fixed
e748
Sat Jun 17 10:56:09 2017
Adrien Matta
BEAM
General
JC Thomas plans for the beam production
Here are a few notes by Jean Charles about
the expected LISE setting based on 2013 and
2014 16C tuning.
Fixed
e748
Mon Jun 19 16:03:18 2017
e748
EXL
General
Progress On EXL
We fiddled around with EXL trying to get a
reasonnable 60Co spectrum.
Fixed
e748
Mon Jun 19 16:04:51 2017
e748
RUN
General
3-alpha
Run 15
Run 15 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
Fixed
e748
Mon Jun 19 16:36:07 2017
e748
EXL
Hardware
Gain changed on EXL
Run 15 online analysis showed waht we believe
was 4 MeV range.
Fixed
e748
Mon Jun 19 16:36:31 2017
e748
RUN
General
60Co
Run 16
Run 16 is started.
Source: We have a 3 alpha source in target
position and a 60Co on the window flange.
Fixed
e748
Mon Jun 19 18:02:16 2017
e748
RUN
General
60Co
Run 17
Run 15 is started.
We have a 3 alpha source in target position
and a 60Co on the window flange.
Fixed
e748
Mon Jun 19 18:07:55 2017
e748
EXL
Hardware
Threshold changed on EXL
Run 15 online analysis showed what we believe
was 4 MeV range.
Fixed
e748
Tue Jun 20 09:08:46 2017
e748
EXL
General
EXL Spectrum with 60Co source
Here is a spectrum of EXL after one night
of accumulating stat on 60Co.
Fixed
e748
Wed Jun 21 09:05:26 2017
Adrien Matta, Phil Adsley
MUST2
General
MUST2 Dead Time
We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in
coincidence with the DT output of the GMT
Fixed
e748
Wed Jun 21 09:39:38 2017
e748
DAQ
General
Backup of config file
ganacq manip back up.
Fixed
e748
Thu Jun 22 10:24:12 2017
e748
CATS
Software
Manip config file backup before merge
Manip config file backup before merge
Fixed
e748
Thu Jun 22 11:10:35 2017
Valérian
EXL
Software
EXL Mapping
Mapping of the EXL detector in the analysis
program versus how it is written on the cables.
Fixed
e748
Thu Jun 22 17:46:45 2017
e748
MUST2
Hardware
MUST2 SL cable repair
Three cables came back from ASCO, two of them
were the original spare cables.
Fixed
e748
Thu Jun 22 17:49:20 2017
Adrien and Phil
MUST2
General
MUST2 telescope test with alpha source
All Telescope now pass the I2C test.
We ran with an alpha source (attached pictures
Fixed
e748
Thu Jun 22 17:55:52 2017
e748
MUST2
Hardware
Surveyor mesurement
The surveyor are missing some point for the
telescope measurement.
Fixed
e748
Fri Jun 23 09:18:14 2017
e748
OTHER
General
Plan for 23rd of June
We have to open today, I started warming up
of the telescope at 9h18 today.
Fixed
e748
Fri Jun 23 09:20:33 2017
e748
OTHER
General
Plan for coming days
23rd of June:
Fix T5
Surveyor measurement
Fixed
e748
Fri Jun 23 16:37:54 2017
Adrien, Laurent, Vincent
OTHER
Hardware
MUST2 chamber opening
We opened the chamber and the surveyor took
there measurement.
Fixed
e748
Fri Jun 23 20:49:49 2017
Adrien
MUST2
General
Restart
Chamber at 2e-5, cooling -9deg outside; -5
on copper LV off.
Fixed
e748
Sat Jun 24 21:41:30 2017
e748
MUST2
General
Pedestal alignement and calibration
MUSt2 pedestal aligned for all telescope.
Started alpha run with all telescope in trigger
Goto page
Previous
1
,
2
, 3,
4
...
46
,
47
,
48
Next
ELOG Home Page