MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 2 of 48  Not logged in MUST2
Fixed, e748, Fri Jun 9 14:41:54 2017, e748, CATS, General, , Runs 1 - 4 
Tests alpha source, dummy data
Pinned, e748, Fri Jun 9 15:49:46 2017, Valérie Lapoux, MUST2, Hardware, , MUST2 configuration Confige748MUST2alimHVandLV.pdfpréparationMUST2forE748.pdf
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file.
Pinned, e748, Fri Jun 9 15:51:44 2017, Valérie Lapoux, MUST2, Hardware, , General Trigger GMT for MUST2 electronics DaqElectronicsMUST2gmtforE748.pdf
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file.
Fixed, e748, Mon Jun 12 11:34:07 2017, e748, MUST2, Hardware, , MUVI cars setup 
We had problem with MUVI1 (pre serie 1) not working properly when a telescope was pluggeg (but fine otherwise).
Charles Houarner changed the card to MUVI serie 5, and the card is now working.
Fixed, e748, Mon Jun 12 11:36:34 2017, e748, MUST2, Hardware, , I2C error on Telescope 
At the Moment we got I2C error on the following detectors:

[LIST]
Fixed, e748, Mon Jun 12 11:50:34 2017, e748, CATS, Software, , Settings QDC 
Gates QDC CATS1X, CATS1Y, CATS2X, CATS2Y: 0.996
Pedestal QDC CATS1X, CATS1Y, CATS2X: 0.5
Pedestal QDC CATS2Y: 0.699
Fixed, e748, Mon Jun 12 11:52:16 2017, e748, CATS, General, , Run 6 and 7: Calibration Runs CATS Capture.png
Run 6: Calib CATS1 X&Y
--> Full, x2, x5, pedestal
Fixed, e748, Mon Jun 12 11:55:27 2017, e748, CATS, General, , Run 5 - JUNK pulser run on CATS1 
Dummy run with pulser.
JUNK
Fixed, e748, Mon Jun 12 14:09:24 2017, e748, CATS, Software, , calibration coefficients Runs 6-7 CATS_Pulser_Calib_Run6-7.pngCATS1_X.e748CATS1_Y.e748CATS2_X.e748CATS2_Y.e748
columns are for 1st order calib (y= ax + b):
pedestal - b - a
Fixed, e748, Mon Jun 12 16:56:36 2017, e748, OTHER, General, , e748 Proposal Matta_PAC_GANIL_June_2016_v3.pdf
Experiment proposal
Fixed, e748, Mon Jun 12 22:48:45 2017, Valérie Lapoux, MUST2, General, , Tests of the DAQ with the Alpha Source 8x
12Th June. 3-peak Alpha source rotated towards the telescopes MM1 to MM4 (square wall of 4 telescopes).
MUVI configurations are fixed on the DAS. See pictures below. Thresholds : 402 keV.
We have DAS error messages for telescopes T2 and T7 with problems of data transmission, "I2C errors" = logic signals problems, maybe due to 
Pinned, e748, Tue Jun 13 11:14:23 2017, Valérie Lapoux, MUST2, General, , GMT configuration, FAG GMTconfigOKMust2FAG100ns.pngGMTtrigParamActions.pngGMTparamDASgatconf.png
The Gatconf parameter is now defined in the action file.
The new configuration for GMT (see chronogramme plot) is attached, with the FAG window width set at 100 ns.
Fixed, e748, Wed Jun 14 12:13:00 2017, e748, MUST2, Hardware, , MUST2 I2C Err debugging 
It appears several SL cables are faulty.
To avoid manipulation of all the cable we now have T1-4 working. These required to scavenge SL T5 and give it to T2.
Pinned, e748, Thu Jun 15 10:16:03 2017, Valérie Lapoux, MUST2, Hardware, , Electronics for GMT trigger and FAG DaqElectronicsMUST2gmtforE748.pdf
The GMT is used in a mode where we do not make coincidence and decision, GMT entries are single and all accepted as triggers of the DAQ.
The FAG window for the GMT should be set at a low value, typically 100 ns.
Fixed, e748, Thu Jun 15 17:51:15 2017, e748, RUN, General, 3-alpha, Run 5-7 MUST2_EXT2.png
[SIZE=3]run5[/SIZE]

alpha source 
Fixed, e748, Fri Jun 16 09:57:54 2017, e748, RUN, General, 3-alpha, Run 11 
RUN 11 : alpha calibration with suppression of zeros ( & alignment of pedestals) for all night
Fixed, e748, Fri Jun 16 09:59:00 2017, e748, RUN, General, 60Co, Run 12 exl_co_source.pngexl_co_source_i.png
RUN 12 : EXL trigger in GMT
+ gamma source 60Co
Fixed, e748, Sat Jun 17 10:22:43 2017, Adrien Matta, EXL, Hardware, , EXL ADC gate 
EXL ADC is now setup with individual gate on the ADC. 

We also put the threshold higher to reduce the rate and managed to work on timing.
Fixed, e748, Sat Jun 17 10:27:26 2017, Adrien Matta, ONLINE, Software, , Starting the GRU online analysis 
We setup a script to start the right environment to run GRU, ganil2root and nptool.

The script is located in /home/muvi/e748 and can be accessed by just typing online in the terminal.
Fixed, e748, Sat Jun 17 10:32:25 2017, Adrien Matta, ONLINE, Software, , Online/Offline list of task 
We need to do the following improvement to the online / offline environment:

[LIST]

ELOG Home Page