MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 28 of 48  Not logged in MUST2
Ongoing, e744, Sun May 13 19:36:09 2018, Valérian + François, MUST2, General, 3-alpha, Run #116 #117 3 alpha run Calibration T1-T5 trigger MUST2_HT_BT_13-05-2018.pngspectra_14-05-2018.png
[U][B]run #116[/B][/U]
start @12h07 13/05/18
stop  @19h45 13/05/18
Fixed, e748, Thu Jun 22 11:10:35 2017, Valérian, EXL, Software, , EXL Mapping Mapping_of_EXL_in_analysis.pdf
Mapping of the EXL detector in the analysis program versus how it is written on the cables.
Fixed, e748, Mon Jun 26 10:26:16 2017, Valérian, EXL, Software, 60Co, Add-back addback.pdf
We implemented the add-back correction with cross-talk subtraction.

On the joined graph, RawEnergy correspond to the sum of the energy in every crystals and Energy correspond to the sum of energy in every crystals with
Fixed, e744, Wed Apr 25 15:59:51 2018, Valérian, EXL-PPT, Software, N/A, Mesytech setup 
To use the remote settings of the Mesytech modules : 
[CODE]
- start GANP170
Ongoing, e744, Tue May 15 09:58:52 2018, Valérian, RUN, General, 3-alpha, run #118 3 alpha 
[U][B]run #118[/B][/U]
Trigger T1 T2 T3 T4 & T5 
EXL + BT not biased but still in trigger
Fixed, e744, Tue May 15 19:42:40 2018, Valérian, EXL-PPT, General, 60Co, Calibration of EXL from e748 data EXL_Sum_e748_Calib.png
The EXL calibration program is ready. Join is the result with previous data from e748.
Fixed, e744, Fri Jun 1 13:12:16 2018, Valérian, EXL-PPT, General, 60Co, run #3003 Calib EXL scaler_start_run3003_ok.pngscaler_stop_run3003_ok.png
run #3003
start @12h06
stop @13h08
Fixed, e744, Fri Jun 1 19:29:17 2018, Valérian, EXL-PPT, General, 60Co, EXL efficiency 
To test EXL efficiency I start a long run with the source in front of it.
run 3014
start @19h25
Ongoing, e748, Tue Jun 6 17:57:07 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 EXL_MUST2_top.png

EXL seems to fit in Adrien's setup. We still have to check if it fits in the chamber. 
Ongoing, e744, Sat May 26 07:32:17 2018, Valerian, pedja, mihai, RUN, General, CH2, Run 2015 after vacuum problem of Css1 target 4 Scalers_start_run2015.png
[U][B]Run 2015[/B][/U] 
26/05/18
start @7h29
Ongoing, e744, Wed May 30 11:17:00 2018, Valerian maurycy and Olivier, OFFLINE, General, CH2, Condition on time T5 SiEvsSiT_T5_issue.png
One should add the condition Si_TX < 150 for T5, problem from Ta?
Ongoing, e744, Wed May 30 11:22:16 2018, Valerian maurycy and Olivier, OFFLINE, General, CH2, Checking the cuts 
cut_DeE : 

- T1 OK
Ongoing, e744, Mon May 28 20:28:50 2018, Valerian and Simon, OFFLINE, General, CH2, Explanation for the 0 degree low energy proton explanation_spotT5.pdf
The 0 degree energy proton are coming from the beam hitting the aluminum target. If you do a cut on the beam projection on T5 you obtain the black dot on
the joined plot.
Fixed, e744, Mon May 28 11:00:07 2018, Valerian and Iulian and Phil, RUN, General, , two protons  e2p_15O.pdf
 
Ongoing, e744, Mon May 28 23:14:26 2018, Valerian and Iulian and Phil, OFFLINE, General, CH2, New hint of the 5/2- resonance New_resonance_hint.pdf
We see a new hint of a resonance
Ongoing, e744, Sat May 26 07:03:12 2018, Valerian and Iulian and Francois, OFFLINE, General, CH2, First picture for 15F from runs 2010-2013 Ex_15F_proj_0_8deg_17_27.pdfsig_theo.jpg
Target -> Thick target (Sandwich target ??)

The predictions are different....  
Ongoing, e744, Sat Apr 28 10:17:22 2018, Valerian and Iulian, MUST2, Hardware, 3-alpha, Status of MUST2 telescopes 27/04/18 Third_good_run_Energy_and_time_for_5_Must2_detectors_2018-04-27_19-32-23.png
Yesterday night we tested T1, T2, T3, T4, T5, and T6.

All telescopes (except T6 which still have a "tripping" CsI) have an Energy and Time signal on X and Y!
Ongoing, e744, Sat Apr 28 13:27:26 2018, Valerian and Iulian, MUST2, Hardware, 3-alpha, multiples runs with two alpha source on T1 T2 T3 T4 and T5 
For the following runs we will use two 3 alpha sources :

On T1, T2, T3, and T4 : [B]11615[/B] : Flux = 1496 alpha in 2 pi
Ongoing, e744, Sat Apr 28 13:36:52 2018, Valerian and Iulian, OTHER, Software, N/A, Problem with DAS configuration 
There is an issue with the GMT slave. When you click Online and then apply write hardware, if the message : [U]register error on GMTSlave[/U] appear, [B]reload
a functioning DAS config[/B] and [B]do not write hardware twice[/B]. 
Ongoing, e744, Fri May 25 02:57:44 2018, Valerian and Iulian, OFFLINE, General, CH2, Simulation Azure 1H(14N,p) and measurement  o15.pdfE_cm_ThetaLab_0_4.pdfE_cm_ThetaLab_2_3.pdfE_cm_ThetaLab_10_12.pdfE_cm_ThetaLab_15_20.pdf
We can know conclude without any doubt that we were able to measure resonances from 1H(14N,p)14N. The resolution with a rough analysis and the current bad
calibration is around 180keV in the com.
Identification of resonances is still difficult but some structure seems consistent with previous works. Also, at higher energy there are only few measurement

ELOG Home Page