Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e744 |
Fri May 25 00:41:19 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1004 (target no 6 -CH2 180 um) |
Run 1004
the thresholds of MUST detector changed to |
7x |
Fixed | e744 |
Fri May 25 01:05:05 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1005 (target no 6 -CH2 180 um) |
Run 1005
|
   |
Fixed | e744 |
Fri May 25 02:35:13 2018 |
Cristina and Pedja | RUN | General | CH2 | run 1006 (target no 6 -CH2 180 um) |
Run 1006
|
   |
Ongoing | e744 |
Fri May 25 02:57:44 2018 |
Valerian and Iulian | OFFLINE | General | CH2 | Simulation Azure 1H(14N,p) and measurement | We can know conclude without any doubt that
we were able to measure resonances from 1H(14N,p)14N.
The resolution with a rough analysis and |
    |
Pinned | e744 |
Fri May 25 04:02:29 2018 |
Valerian Iulian Pedja and Cristina | OTHER | General | N/A | General power cut of ganil | Due to some water leaks, CSS1 CSS2 and CIME
as the vacuum system of GANIL are down...
Time loss could be considerable... They talked |
|
Fixed | e744 |
Fri May 25 08:37:04 2018 |
Adrien Matta | MUST2 | Hardware | N/A | MUST2 cooling | Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both
coolers at -5C.
|
|
Pending | e744 |
Fri May 25 13:08:44 2018 |
e748 | OTHER | Software | N/A | CSH is broken | Someone change the .cshrc file this morning
this morning at 11h30. None of the alias
worked anymore. |
|
Pinned | e744 |
Fri May 25 14:10:34 2018 |
Freddy, Louis, Lama | OFFLINE | General | | MM - dE_TOF diagnostic with/without CsI_E | Attached are some plot of dE-TOF PID for run
1004 after the threshold change ( 1 MeV -->
500 keV).
|
 |
Ongoing | e744 |
Fri May 25 15:10:23 2018 |
François | CATS | Hardware | | delay on CATS | CATS delay 500 ns was changed to 300 ns, in
order to get the stop signal on MUST2 TAC
well within the range of the TAC. |
|
Ongoing | e744 |
Fri May 25 15:19:38 2018 |
Cristina | OFFLINE | General | | isomers present in the 14N runs |
Attached are some pictures of the energy_vs_time
spectra for EXL and PPT detectors recorded |
 |
Fixed | e744 |
Fri May 25 15:29:51 2018 |
François | OTHER | Hardware | | tac FAG_HF | A delay of 500 ns was put to the start signal
= FAG of the FAG_HF_validated TAC
and a range of 500 ns selected |
|
Fixed | e744 |
Fri May 25 15:41:50 2018 |
e744- Valérie | DAQ | General | N/A | DAS configurations for E744-Summary | List of the saved files of the DAS configuration
used on May-24h and May-25th:
[Note that:
|
11x |
Ongoing | e744 |
Fri May 25 16:49:53 2018 |
e748 | MUST2 | General | CH2 | Raw dE-TOF bidim for the 5 telescopes zith the 14N beam | Pedestal seems not to be aligned for T4 |
|
Fixed | e744 |
Fri May 25 17:42:21 2018 |
shumpei | MUST2 | Software | N/A | CsI energy calibration for MUST2 telescopes | Calibration parameter for MUST2 CsI crystals
are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all |
6x |
Fixed | e744 |
Fri May 25 17:51:45 2018 |
e744 Iulan Valérie | RUN | General | CH2 | Run 1008 starting runs with 14N | [U][B]BAD RUN FOR 14N[/B][/U]
Run 1008 BAD RUN 0 Events
|
  |
Fixed | e744 |
Fri May 25 18:15:41 2018 |
Pierre | MUST2 | General | CD2 | new dEE PID using Shumpei calibration | |
|
Fixed | e744 |
Fri May 25 21:34:19 2018 |
e744 Iulan, Fairouz, Valerie | DAQ | Hardware | CH2 | Problem of FAG validation +change of ADC parameter for TAC signal | The Time signal MM_PPT is now in the parameter
MCP_HF of the ADC.
The problem was on the FAG signal validation |
|
Fixed | e744 |
Fri May 25 21:37:45 2018 |
iulian nicolas valérie | RUN | General | N/A | run 1012 all triggers 14O beam in D4 | |
 |
Fixed | e744 |
Fri May 25 22:03:12 2018 |
e744 Must2+LISE teams | RUN | General | CH2 | RUNS 2000, 2001 | Beam 14O
Run 2000 start with all triggers, including
LISE trigger, during 1 minute for tests.
|
6x |
Fixed | e744 |
Fri May 25 22:46:26 2018 |
e744 Must2+LISE teams, edit Valérie | RUN | General | CH2 | RUN 2004 |
Run 2004 Date : 25/05/2018 22:45:58 25/05/2018
23:17:39
|
6x |