MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 24 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject
Fixede744 Fri May 25 00:41:19 2018 Cristina and PedjaRUNGeneralCH2run 1004 (target no 6 -CH2 180 um)

Run 1004
the thresholds of MUST detector changed to ~0.5 MeV

start@ 00:38 25/05/2018
stop@ 00:57 (due to beam problems Q31 was at 0 - CAMA22 had to be reset)
Attachment 1: scalers_start_run1004.png
scalers_start_run1004.png
Attachment 2: scalers_stop_run1004.png
scalers_stop_run1004.png
Attachment 3: ESi_ECSI_run1004.png
ESi_ECSI_run1004.png
Attachment 4: MM1_MM4_Y_run1004.png
MM1_MM4_Y_run1004.png
Attachment 5: MM1_MM4_X_run1004.png
MM1_MM4_X_run1004.png
Attachment 6: TAC_run1004.png
TAC_run1004.png
Attachment 7: MM5_run1004.png
MM5_run1004.png
Fixede744 Fri May 25 01:05:05 2018 Cristina and PedjaRUNGeneralCH2run 1005 (target no 6 -CH2 180 um)

Run 1005

beam intensity fluctuations

start@ 01:17 25/05/2018

stop@ 02:28
Attachment 1: scalers_start_run1005.png
scalers_start_run1005.png
Attachment 2: scalers_stop_run1005.png
scalers_stop_run1005.png
Attachment 3: MMimpactsRun1005.png
MMimpactsRun1005.png
Attachment 4: TAC_run1005.png
TAC_run1005.png
Fixede744 Fri May 25 02:35:13 2018 Cristina and PedjaRUNGeneralCH2run 1006 (target no 6 -CH2 180 um)

Run 1006

Around 3h10 Water leak was happened, shutting down all power supplies.
start@ 02:29 25/05/2018

stop@ 03:10
Attachment 1: scalers_start_run1006.png
scalers_start_run1006.png
Attachment 2: scaler-stop-run1006.png
scaler-stop-run1006.png
Attachment 3: tac-run1006.png
tac-run1006.png
Attachment 4: mm_impact_run1006.png
mm_impact_run1006.png
Ongoinge744 Fri May 25 02:57:44 2018 Valerian and IulianOFFLINEGeneralCH2Simulation Azure 1H(14N,p) and measurement
We can know conclude without any doubt that we were able to measure resonances from 1H(14N,p)14N. The resolution with a rough analysis and the current bad calibration is around 180keV in the com.
Identification of resonances is still difficult but some structure seems consistent with previous works. Also, at higher energy there are only few measurement so the data taken with 14N this night should be interesting.

First spectra is simulated with AZURE2
Second spectra is Energy in center of mass for ThetaLab between 0 to 4 degrees (T5)
Third spectra is Energy in center of mass for ThetaLab between 2 to 3 degrees (T5)
Fourth spectra is Energy in center of mass for ThetaLab between 10 to 12 degrees (T1-T4)
Fifth spectra is Energy in center of mass for ThetaLab between 15 to 20 degrees (T1-T4)
Attachment 1: o15.pdf
o15.pdf
Attachment 2: E_cm_ThetaLab_0_4.pdf
E_cm_ThetaLab_0_4.pdf
Attachment 3: E_cm_ThetaLab_2_3.pdf
E_cm_ThetaLab_2_3.pdf
Attachment 4: E_cm_ThetaLab_10_12.pdf
E_cm_ThetaLab_10_12.pdf
Attachment 5: E_cm_ThetaLab_15_20.pdf
E_cm_ThetaLab_15_20.pdf
Pinnede744 Fri May 25 04:02:29 2018 Valerian Iulian Pedja and CristinaOTHERGeneralN/AGeneral power cut of ganil
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility in the morning but it seems unlikely.
Fixede744 Fri May 25 08:37:04 2018 Adrien MattaMUST2HardwareN/AMUST2 cooling
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
Alcohol level checked, look OK.
Pendinge744 Fri May 25 13:08:44 2018 e748OTHERSoftwareN/ACSH is broken
Someone change the .cshrc file this morning this morning at 11h30. None of the alias worked anymore.
Pinnede744 Fri May 25 14:10:34 2018 Freddy, Louis, LamaOFFLINEGeneral MM - dE_TOF diagnostic with/without CsI_E
Attached are some plot of dE-TOF PID for run 1004 after the threshold change ( 1 MeV --> 500 keV).

Putting a condition on CsI_E>0 select well punch through event as expected.
Attachment 1: T2_diag_dETOF.pdf
T2_diag_dETOF.pdf
Attachment 2: MM12345_diag_dETOF.pdf
MM12345_diag_dETOF.pdf
Ongoinge744 Fri May 25 15:10:23 2018 FrançoisCATSHardware delay on CATS
CATS delay 500 ns was changed to 300 ns, in order to get the stop signal on MUST2 TAC well within the range of the TAC.
Ongoinge744 Fri May 25 15:19:38 2018 CristinaOFFLINEGeneral isomers present in the 14N runs

Attached are some pictures of the energy_vs_time spectra for EXL and PPT detectors recorded during 14N runs

Still to do: time alignment of EXL detectors
Attachment 1: 14Nruns_isomers_EXL.pdf
14Nruns_isomers_EXL.pdf
Attachment 2: 14Nruns_isomers_PPT.pdf
14Nruns_isomers_PPT.pdf
Fixede744 Fri May 25 15:29:51 2018 FrançoisOTHERHardware tac FAG_HF
A delay of 500 ns was put to the start signal = FAG of the FAG_HF_validated TAC
and a range of 500 ns selected
Fixede744 Fri May 25 15:41:50 2018 e744- ValérieDAQGeneralN/ADAS configurations for E744-Summary
List of the saved files of the DAS configuration used on May-24h and May-25th:
[Note that:
All the files are used on run with the name "e744.das".
It means that, for changing from the present das file to another one for the run, you need to open it in the DAS, then to save it with the current experiment name "e774.das".
then you need to be ONLINE to write hardware, in order to apply the electronic settings.


- file for the CALIMERO configuration with the thresholds set at 1 MeV e744.das = e744calimero_1MeVOK.das

- files for the test runs with the 14N:
the file at the beginning of the experiment on 14N was: e744.das = 744_24MayMANIPok.das
Then for the run 1004 and the next ones, the thresholds were changed to around 500keV on all the telescopes.
Runs 1004, 1005, 1006 The config file corresponds to e744.das = e744_25MayMANIPok500keV.das
Thresholds on CsI for the runs with 14N: MATE 18 Seuil Haut 8220 ; Seuil bas 8160
ConfigCsIThreshBefore8220.png
------------------------------------EXPERIMENT 14O 25 MAY evening 17pm ----------------------------------------------
New DAS file corresponds to the change of the CsI thresholds on all telescopes
e744_25MayEXPok500keVCsIThr.das
This is the file that we will use at the beginning of the runs with the 14O beam.
New threshold pedestals on CsI for the runs: ChangeAllCsIThresholds8210.png
MATE 18 Seuil Haut 8210 ; Seuil bas 8160

Later on, the threshold on MM5 will be increased to around 1 MeV (to reduce the background rate due to the beta).
NB: the files are in:
home/e748/ganacq_manip/e744/das-save

------------------------------------------------------
threshold T1 488 keV
threshold T2 480 keV
threshold T3 492 keV
threshold T4 457 keV
threshold T5 480 keV <----------------Maybe to be changed to 1 MeV later on, during the tuning of 14O, depending on the dead time.

---------------------------------------------------

E744_GMTtrigAll.png
Input entried of the GMT trigger module:
IN1 to IN5 : MM1 to MM5
IN6: nothing IN7: nothing
IN8: Cats (divided by 3. 10**4)
IN9: nothing
IN10: PPT
IN11: EXL
IN12: nothing
IN13: LISE trigger (SiD4 or D6)
IN14, IN15: nothing
-----------------------------------------------
Attachment 1: mm_thresholdT1.png
mm_thresholdT1.png
Attachment 2: mm_thresholdT2.png
mm_thresholdT2.png
Attachment 3: mm_thresholdT3.png
mm_thresholdT3.png
Attachment 4: mm_thresholdT4.png
mm_thresholdT4.png
Attachment 5: mm_thresholdT5.png
mm_thresholdT5.png
Attachment 6: ConfigCsIThreshBefore8220.png
ConfigCsIThreshBefore8220.png
Attachment 7: ChangeAllCsIThresholds8210.png
ChangeAllCsIThresholds8210.png
Attachment 8: E744_GMTtrigAll.png
E744_GMTtrigAll.png
Attachment 9: ChronogrammeE744_GMTmuvi1.png
ChronogrammeE744_GMTmuvi1.png
Attachment 10: E744_GMTtrigslave.png
E744_GMTtrigslave.png
Attachment 11: ChronoE744_GMT2muvi2.png
ChronoE744_GMT2muvi2.png
Ongoinge744 Fri May 25 16:49:53 2018 e748MUST2GeneralCH2Raw dE-TOF bidim for the 5 telescopes zith the 14N beam
Pedestal seems not to be aligned for T4
Attachment 1: Example1.png
Example1.png
Fixede744 Fri May 25 17:42:21 2018 shumpeiMUST2SoftwareN/ACsI energy calibration for MUST2 telescopes
Calibration parameter for MUST2 CsI crystals are calculated with run1001-1006.
Attached are dE(DSSD)-E(CsI) plot of all the telescopes and parameters.
The parameter files are in
/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/CsI_rough

How to make the parameters;
For dE-E plot, the strongest locus should be proton.
Approximation formula for proton dE (Si 300 micrometer)-E (residual) I used is
(CsI_Energy) = -6.81774+41.1823/(Si_Energy-0.0814779).

Absolute value for the total energy may have some offset, but the gain of all the crystals should be roughly matched.
Maybe we need one more common parameter to adjust absolute value.

T2 Crystal #1 and #10 have no data. As I remember, this is the same as E748 exp. last year.
Crystals #9 for all the telescopes have low statistics. I'm afraid the mapping of crystal #9 is not correct.
->nptool/NPLib/Detectors/MUST2/TMust2Physics.cxx m_CsI_MatchingY[8]=48 but should be equal to 16 (corrected and re-compiled 27/05/2018).
Attachment 1: pid.pdf
pid.pdf
Attachment 2: Cal_CsI_E_MM1.cal
MUST2_T1_CsI1_E -415.065 0.0506445
MUST2_T1_CsI2_E -394.373 0.0481228 
MUST2_T1_CsI3_E -258.191 0.0315073
MUST2_T1_CsI4_E -298.563 0.0364456 
MUST2_T1_CsI5_E -355.137 0.0433388
MUST2_T1_CsI6_E -411.171 0.0502037
MUST2_T1_CsI7_E -386.543 0.0471846 
MUST2_T1_CsI8_E -382.674 0.0466991 
MUST2_T1_CsI9_E -327.057 0.039966 
MUST2_T1_CsI10_E -409.776 0.0500127 
MUST2_T1_CsI11_E -376.919 0.0460117 
MUST2_T1_CsI12_E -349.89 0.0427133 
MUST2_T1_CsI13_E -363.497 0.0443635 
MUST2_T1_CsI14_E -296.737 0.0361737
MUST2_T1_CsI15_E -466.684 0.0569536
MUST2_T1_CsI16_E -403.822 0.0492548
Attachment 3: Cal_CsI_E_MM2.cal
MUST2_T2_CsI1_E 0 -1000.0
MUST2_T2_CsI2_E -256.055 0.0312712 
MUST2_T2_CsI3_E -305.683 0.0373285
MUST2_T2_CsI4_E -236.362 0.0288615
MUST2_T2_CsI5_E -230.941 0.0282124
MUST2_T2_CsI6_E -300.793 0.0367438
MUST2_T2_CsI7_E -332.791 0.0406243
MUST2_T2_CsI8_E -313.525 0.0382459 
MUST2_T2_CsI9_E -308.535 0.0376744 
MUST2_T2_CsI10_E 0 -1000.0
MUST2_T2_CsI11_E -331.027 0.0404172
MUST2_T2_CsI12_E -322.929 0.0393791 
MUST2_T2_CsI13_E -269.007 0.0328459 
MUST2_T2_CsI14_E -311.052 0.0379616
MUST2_T2_CsI15_E -264.410 0.0322532
MUST2_T2_CsI16_E -266.863 0.0325516
Attachment 4: Cal_CsI_E_MM3.cal
MUST2_T3_CsI1_E -286.396 0.0349372 
MUST2_T3_CsI2_E -264.209 0.0322131 
MUST2_T3_CsI3_E -229.529 0.0280088 
MUST2_T3_CsI4_E -322.16 0.0393184
MUST2_T3_CsI5_E -252.731 0.0308459
MUST2_T3_CsI6_E -291.944 0.0356323
MUST2_T3_CsI7_E -297.43 0.036301
MUST2_T3_CsI8_E -295.725 0.036043
MUST2_T3_CsI9_E -263.931 0.0321985
MUST2_T3_CsI10_E -294.309 0.0359069
MUST2_T3_CsI11_E -345.658 0.0421607
MUST2_T3_CsI12_E -328.481 0.0400503 
MUST2_T3_CsI13_E -253.866 0.0309577
MUST2_T3_CsI14_E -239.05 0.0291408 
MUST2_T3_CsI15_E -238.476 0.029073 
MUST2_T3_CsI16_E -265.489 0.0323667 
Attachment 5: Cal_CsI_E_MM4.cal
MUST2_T4_CsI1_E -370.19 0.045178 
MUST2_T4_CsI2_E -393.585 0.0480225
MUST2_T4_CsI3_E -436.711 0.0532717 
MUST2_T4_CsI4_E -331.873 0.0405191
MUST2_T4_CsI5_E -321.175 0.0391971
MUST2_T4_CsI6_E -361.306 0.0440623 
MUST2_T4_CsI7_E -332.709 0.0405858
MUST2_T4_CsI8_E -317.569 0.03871
MUST2_T4_CsI9_E -441.852 0.0538625 
MUST2_T4_CsI10_E -396.533 0.0483559 
MUST2_T4_CsI11_E -370.464 0.0452019
MUST2_T4_CsI12_E -386.657 0.0471578
MUST2_T4_CsI13_E -320.009 0.0390499
MUST2_T4_CsI14_E -375.625 0.0458199 
MUST2_T4_CsI15_E -423.558 0.0516807 
MUST2_T4_CsI16_E -393.189 0.0479347 
Attachment 6: Cal_CsI_E_MM5.cal
MUST2_T5_CsI1_E -387.732 0.0472463 
MUST2_T5_CsI2_E -373.018 0.0454952 
MUST2_T5_CsI3_E -469.892 0.0573254
MUST2_T5_CsI4_E -404.644 0.0493125
MUST2_T5_CsI5_E -361.705 0.0440708 
MUST2_T5_CsI6_E -232.821 0.0284066
MUST2_T5_CsI7_E -272.427 0.0331412 
MUST2_T5_CsI8_E -271.507 0.0330741 
MUST2_T5_CsI9_E 0 -1000.0
MUST2_T5_CsI10_E -396.211 0.048246
MUST2_T5_CsI11_E -399.039 0.0486078
MUST2_T5_CsI12_E -333.308 0.0406365
MUST2_T5_CsI13_E -306.32 0.0374199 
MUST2_T5_CsI14_E -430.116 0.0525099
MUST2_T5_CsI15_E -394.692 0.04816
MUST2_T5_CsI16_E -363.795 0.0443958 
Fixede744 Fri May 25 17:51:45 2018 e744 Iulan ValérieRUNGeneralCH2Run 1008 starting runs with 14N
BAD RUN FOR 14N

Run 1008 BAD RUN 0 Events
14N beam rate high intensity ~ 0.1 nA
CH2 n°6
All triggers ON
MM1 to MM5 ; cats div
EXL PPT and LISE
NB: at the beginning there was no HV on EXL then put ON.
No beam at the end of the run.
NB: The power is around 1 kW on machine production target.
Attachment 1: BTdssdMust2_25May18.png
BTdssdMust2_25May18.png
Attachment 2: HTdssdMust2_25May.png
HTdssdMust2_25May.png
Attachment 3: HV_EXL_25May.png
HV_EXL_25May.png
Fixede744 Fri May 25 18:15:41 2018 PierreMUST2GeneralCD2new dEE PID using Shumpei calibration
Attachment 1: PID_dEE_newCsIcalib.png
PID_dEE_newCsIcalib.png
Fixede744 Fri May 25 21:34:19 2018 e744 Iulan, Fairouz, ValerieDAQHardwareCH2Problem of FAG validation +change of ADC parameter for TAC signal
The Time signal MM_PPT is now in the parameter MCP_HF of the ADC.
The problem was on the FAG signal validation (bad output of the discriminator)

the TAC MM_PPT with start FAG and STOP ppt is now coded in the entry of ADC MCP_HF , add=9 (channel 10)
Previously it was add =3 (channel 4).

Problem of DAQ encountered in the evening (20 pm) no DAQ counting, no FAG from GMT: we first reboot on software (Terminal iolan: iolan must2 all; reboot).
but the DAQ was still blocked.
We phoned to the hardware astreinte (Charles H), he told us to reset the hardware.
The problem was solved by resetting the crates (reset button on the crates ganlx1 and ganlx14 in D6).
The DAQ restarted correctly.
Attachment 1: ProblemGMTtriggerVXI.png
ProblemGMTtriggerVXI.png
Fixede744 Fri May 25 21:37:45 2018 iulian nicolas valérieRUNGeneralN/Arun 1012 all triggers 14O beam in D4
Attachment 1: Run1012_E1_TcatsHF.png
Run1012_E1_TcatsHF.png
Attachment 2: Run1012_E1_T1HF_D6.png
Run1012_E1_T1HF_D6.png
Fixede744 Fri May 25 22:03:12 2018 e744 Must2+LISE teamsRUNGeneralCH2RUNS 2000, 2001
Beam 14O
Run 2000 start with all triggers, including LISE trigger, during 1 minute for tests.
start 22:00:58; stop

Run 2001 start 25-05-18_22h01m19s ; stop 22h15
Run 2002 start 25-05-18_22h16m01s ;stop 22h30 problem
Run 2003 start at 22:16 stop 22:30 DAQ blocked
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS from 440-500 pps
opening FH31 slits

Target n°6 CH2

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

NB the MMimpact plot showed that T4 was not counting. Ord 4 was not counting in the scalers.
>>>>>>>>>>>>>>>Telescope T4 Dssd has tripped during run 2002-2003 cf MMimpactRun2003.png
Thne HT on T4 was put on for next runs, see Run 2005,... in the next entries.
Attachment 1: ProblemStartStop2002Narval.png
ProblemStartStop2002Narval.png
Attachment 2: MMimpactRun2003.png
MMimpactRun2003.png
Attachment 3: Run2001_MMimpact14O.png
Run2001_MMimpact14O.png
Attachment 4: Scalers_duringRun2002.png
Scalers_duringRun2002.png
Attachment 5: Scalers_duringRun2003.png
Scalers_duringRun2003.png
Attachment 6: HT_MUST2afterSettingT4ON.png
HT_MUST2afterSettingT4ON.png
Fixede744 Fri May 25 22:46:26 2018 e744 Must2+LISE teams, edit ValérieRUNGeneralCH2RUN 2004

Run 2004 Date : 25/05/2018 22:45:58 25/05/2018 23:17:39
End of Run, error Narval see snapshot ProblemNarvalRCCEndRun2004.png

14O beam ; Target n°6 CH2
trig MUST2, CATS, EXL, PPT
T4 ON HT after trip>>>>>>>>>>cf PLOT HT ON
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS 2 10**5 pps

MUST2 thresholds at 1 MeV for all Telescopes
ConfigDASThresTel5at1MeV.png ConfigDASThresMUST2at1MeV.png
NB: problem on EXL ch17 and ch18 cf EXLCsIRawPROBLEMCh17and18Run2004.png

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

Attachment 1: ConfigDASThresTel5at1MeV.png
ConfigDASThresTel5at1MeV.png
Attachment 2: ConfigDASThresMUST2at1MeV.png
ConfigDASThresMUST2at1MeV.png
Attachment 3: scalersDuringRun2004.png
scalersDuringRun2004.png
Attachment 4: EXLCsIRawPROBLEMCh17and18Run2004.png
EXLCsIRawPROBLEMCh17and18Run2004.png
Attachment 5: ProblemNarvalRCCEndRun2004.png
ProblemNarvalRCCEndRun2004.png
Attachment 6: HT_MUST2afterSettingT4ON.png
HT_MUST2afterSettingT4ON.png

ELOG Home Page