Fixed, e748, Thu Jul 6 07:23:22 2017, e748, MUST2, Software, CD2, MUST2 : VMECOM : TCP error - TCP/IP : time-out
|
"MUST2 : VMECOM : TCP error - TCP/IP : time-out" at 7:19.
RRC shows MUST2 "OFFLINE"
We stop run 331 -> Doesn't stop
|
Fixed, e748, Thu Jul 6 07:58:09 2017, e748, MUST2, General, CD2, SiLi 1/T5 triped
|
SiLi 1/T5 triped at 7:30. We leave it off while trying to restart the run control.
We turn it on again at 8:03. |
Fixed, e748, Thu Jul 6 08:22:08 2017, Valérie L, RUN, General, CD2, Problem of DAQ and networks problems   
|
After the problem on Run control and the offline of MUST2, the DAQ on numexo could not be started again.
see error messages below.
The soft "astreinte" was called at 8h20 and also the one of G2I at 8h30 for network problems.
|
Fixed, e748, Thu Jul 6 09:54:53 2017, Valérie L, RUN, General, CD2, Run control OK -Runs 339 and 340  
|
After the reboot soft of the AGAVA NUMEXO and realignment of the TGS (time stamp Agava) the situation is stabilized.
The "astreintes" for hardware (Gilles W) and software (Clotilde M) have rebooted from the Terminal the crates (AGAVA).
Antoine Lemasson has reloaded the setup of the GTS.
|
Fixed, e748, Thu Jul 6 10:35:50 2017, Valérie L, MUST2, General, CD2, Sili-1/T5 trip
|
The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still increasing 25.6µA at 11h30.(The limit Io is set at 26µA)
To regulate this detector the Vo set is put at 380V instead of 400V. Now I ~ 24.4µA.
|
Fixed, e748, Thu Jul 6 10:39:09 2017, BéaF & ValérieL - shift U, OFFLINE, General, , Test of merge on Run 339 
|
spectra of the merge checked by Béa.
The merge is correct on the correlations cf plots below.
|
Fixed, e748, Thu Jul 6 11:41:20 2017, Valérie L, DAQ, General, N/A, MEMO START/STOP + AGAVA configuration in DAS    
|
START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo; in the Run Control display on ganp976)
|
Fixed, e748, Thu Jul 6 13:21:49 2017, Daisuke, RUN, Hardware, CD2, RUN340
|
During RUN340
13h10 The beam intensity dropped from 35 kpps to nearly zero. Iulian called PCP. They said they found the beam alignment was a bit off, so they were trying |
Fixed, e748, Thu Jul 6 13:33:23 2017, e748, RUN, General, CD2, Stop of Run 340 due to beam problems
|
The run 340 was stopped at 13h32. Before the stop fo the run the beam was unstable and stopped by machine team.
General DAQ e748
|
Fixed, e748, Thu Jul 6 13:37:22 2017, Valérie L, RUN, General, CD2, Run 341 
|
Run 341 START AT 13h37 STOP AT 15h21 (beam stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam was at 6µA (--> CATS at 30kcps/s), the machine needs to recover slowly to go to 7eµA.
(run checked with Ganil_Tape ok)
|
Fixed, e748, Thu Jul 6 13:37:37 2017, Adrien Matta, OFFLINE, General, N/A, Energy loss table for d, 3He and 3H 20x
|
Here it is! |
Fixed, e748, Thu Jul 6 14:07:20 2017, Bea, OFFLINE, General, CD2, Convert & Merge Numexo Runs in ganp166
|
To Convert run DAQ_general
offline
|
Fixed, e748, Thu Jul 6 15:24:25 2017, e748-shift U, BEAM, General, CD2, Beam stop, end of run 341
|
The beam was stopped due to vacuum problem at CSS2.
End of run 341 at 15h21. |
Fixed, e748, Thu Jul 6 17:05:51 2017, Valérie L, RUN, General, CD2, run 342 +overview of TAC    
|
Beam recovered after shut down due to the vacuum problem (power supply on the vacuum system was off). Beam was off during 1h30.
Run 342 started at 17h04
|
Fixed, e748, Thu Jul 6 19:17:12 2017, e748 MA, RUN, General, CD2, RUN 343
|
Run 343
same conditions as run 342
beam=7uA
|
Fixed, e748, Thu Jul 6 20:07:46 2017, Daisuke + Thomas R+ Valérie L, CHIO, General, CD2, Problem of counting on Chio
|
It seems that the ChIo is counting at a very low rate, around 100/s instead of 5000/s in previous runs.
Thomas R is called at 20h to fix the problem.
See scalers of Run 343 at 20h09.
|
Fixed, e748, Thu Jul 6 20:46:15 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 345 DAQ+344 chio after chio problem
|
The HV on cathode is now set again at 2900V. At 20h50 we get back the beam for the run.
(Grid still ok at 920V)
Beam problem cf the scalers. Losing beam somewhere.
|
Fixed, e748, Thu Jul 6 21:27:52 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 345 beam intensity loss
|
The beam rate was low after intervention with the CHIO HV.
Thomas contacted Jean-Charles and PCP. It turned out that some quadrupoles (Q31, Q34, Q21) of LISE were turned off. Thomas put correct parameters and turned |
Fixed, e748, Thu Jul 6 21:35:29 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 346 e748+e748chio 6x
|
Run 346 started at 21h37
Beam around 7µA CATS 2 46k
|
Fixed, e748, Fri Jul 7 00:25:16 2017, e748, MUST2, Software, CD2, Calibration for CsI
|
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Calibration file is at
|
|