MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 13 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Fixed, e748, Fri Jul 7 00:42:50 2017, Shumpei, MUST2, Software, CD2, Calibration for CsI CsICalib.pdf
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Method;
Gate DSSD (300 um) energy = 2 MeV. This corresponds to 
Fixed, e748, Fri Jul 7 00:43:51 2017, Shumpei, MUST2, Software, CD2, Calibration for CsI CsICalib.pdf
Rough energy calibration for CsI was performed (only for MM1 and MM4).
Method;
Gate DSSD (300 um) energy = 2 MeV. This corresponds to 
Fixed, e748, Fri Jul 7 02:28:26 2017, Anastasia + Didier, ONLINE, General, CD2, scalers during run 346 Capture-scalers-run346.png
[IMG]elog:249/1[/IMG]
Fixed, e748, Fri Jul 7 02:56:25 2017, Anastasia + Didier, ONLINE, General, CD2, CATS raw 2D charge during run 346 Capture-catsraw-run346.png
[IMG]elog:250/1[/IMG]
Fixed, , Fri Jul 7 06:55:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346  MUST2_7am.pngScalers7am_run346.png
Run 346 still running.
We see in the Must2 impact also the other two telescopes T6T7
and clearly the elastic in the E/Theta
Fixed, , Fri Jul 7 07:34:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346 
Beam intensity: 7.433 ľA
Fixed, e748, Fri Jul 7 08:17:38 2017, e748, RUN, General, CD2, Run 347 Scalers_run347.png
Stop run 346 and start run 347 after rewriting parameters onto CHIO digitizer.
Digitized CHIO signals back in Vigru.
Fixed, e748, Fri Jul 7 08:56:43 2017, e748, MUST2, General, CD2, SiLi 1/T5 current 
SiLi 1/T5: 380V, 24.9 uA (current limit set at 26 uA)
Apparently, it hasn't triped since July 6, 10:35
Fixed, e748, Fri Jul 7 10:46:21 2017, e748, MUST2, General, CD2, SiLi 1/T5 current 
HV = 380 V
I = 25.1 uA
Fixed, e748, Fri Jul 7 10:56:12 2017, e748, RUN, General, CD2, Run 347 (file change) scalers_run347_1.png
10:50 data file change -> run_0347.dat.07-07-17_08h15m06s.1
18O: 7.5 uAe
CATS1 42 kcps
Fixed, e748, Fri Jul 7 12:00:29 2017, e748, RUN, General, CD2, Stop run 347 - Short machine problem 
Short beam interruption due to a machine problem. We stop run 347.
Fixed, e748, Fri Jul 7 12:02:02 2017, e748, RUN, General, CD2, Run 348 Scalers_run348.pngcorrel_run348.png
Restart after short machine problem.
Same conditions as previous run.
Fixed, e748, Fri Jul 7 15:15:42 2017, e748, BEAM, General, CD2, Runs 349 to 364 - 10Be LISE tuning 
Slits F31 = +/- 20 mm
Momentum acceptance = 2.5 % total
Fixed, e748, Fri Jul 7 15:20:45 2017, e748, BEAM, General, CD2, Run 365 - 10Be LISE tuning 
Slits F31 = +/- 4 mm
Momentum acceptance = 0.5 % total
2 uAe -> 80000 cps on CATS
Fixed, e748, Fri Jul 7 15:55:29 2017, e748, BEAM, General, CD2, Run 366 - 10Be tuning - Centering on TARGET run_366_dac2_moins3A_CATS.pngrun_366_dac2_moins3A_Target.png
FH31 slits = +/- 4 mm
DAC2 = -3 A
Fixed, e748, Fri Jul 7 16:01:22 2017, e748, RUN, General, CD2, Run 367 run_367_scalers.png
FH31 slits (momentum slits) = +/- 4 mm
DAC2 = -3 A
Triggers = MUST2, CATS1div, CATS2div
Fixed, e748, Fri Jul 7 16:32:24 2017, e748, RUN, General, CD2, summary of runs 363-367 

/data/e748X/e748/acquisition/run
r--r--r-- 1 e748 Exxx   19M  7 juil. 15:01 run_0363.dat.07-07-17_14h54m46s
Fixed, e748, Fri Jul 7 16:34:34 2017, e748 shift U Simon G. + Valérie L, RUN, General, CD2, Overview of Run 368 - 10Be beam 12x
Run 368 started at 16h30 stop at 18h01 (automatic stop)

Run  368_1 ongoing at 18h41
Fixed, , Fri Jul 7 18:04:58 2017, e748, OFFLINE, General, , Kinematic Line12Be(d,3He)11Li  kine.pdf
 
Fixed, e748, Fri Jul 7 18:18:13 2017, e748 Thomas R. +shift U Simon G +Valérie L, CHIO, General, CD2, Thomas's explanations on Agava P2280829explanationChIo.JPG

AGAVA
cf drawing below done by Thomas.

ELOG Home Page