MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 69 of 132  Not logged in MUGAST
Fixed, e744s, Mon Apr 8 00:41:53 2019, Francois, OTHER, General, , Predictions for VAMOS plots with 14N and 14O beams Kineplots.pdf
 
Fixed, e744s, Mon Apr 8 08:30:50 2019, iulian, OTHER, General, N/A, E744s to-do list , proposal and other relevant documents Proposal__15F_v6.pdftime_request_E744.pdfe744s.pdf
To do list

[COLOR=blue]- ask  final beam energy for the 14O beam (include CATS removal)-> E=7.60 MeV/u  Done[/COLOR]
Fixed, com2019, Mon Apr 8 10:58:16 2019, Adrien, OFFLINE, General, CD2, Checked alignement of the different Silicon at backward angle Ex_byDetector.png
Here is a plot of Ex for all the com. stats detector by detector.

The Spectrum are overall well aligned.
Fixed, e744s, Mon Apr 8 11:58:37 2019, Valerian, OTHER, General, N/A, Particle identification with CATS or HF  6x
After discussing about using the HF, I join as a reference what was obtained during experiment e744 of last year. We can see that using an external TAC
the time resolution is much worse using HF.
    Fixed, e744s, Mon Apr 8 14:41:07 2019, Daniele M, OTHER, General, N/A, PACE4 cross check ------ E744s to-do list , proposal and other relevant documents 
Fusion-evaporation calculation cross-check:

angular range [10-40]deg
Fixed, e744s, Mon Apr 8 15:17:28 2019, François, TARGET, General, , E744 Targets  20190408_143035.jpg

Targets mounted on holder
    Fixed, e744s, Mon Apr 8 15:18:03 2019, Daniele M, OTHER, General, N/A, Br ---- E744s to-do list , proposal and other relevant documents  
[TABLE border="1"]
A|    sigma(mb)|   beta(%)|   Beta% After target|   Br(TM)
|-
Fixed, e744s, Mon Apr 8 21:39:44 2019, iulian, OTHER, General, N/A, Shifts table 
The shifts table can be found here:
https://docs.google.com/spreadsheets/d/1aSb4BMzkrwLzM2DuRUAoXhBwFCiFX-pbhQ1_CPxwRts/edit?usp=sharing
Do not forget to fill this and also add your name, institution and email as you can find in the example (look for "IS")
Fixed, e744s, Tue Apr 9 10:30:09 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 1
  - MUVI: MUVI1
Fixed, e744s, Tue Apr 9 10:45:55 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 2
  - MUVI: MUVI1
Fixed, e744s, Tue Apr 9 11:02:13 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 3
  - MUVI: MUVI2
Fixed, e744s, Tue Apr 9 11:18:09 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 4
  - MUVI: MUVI2
Fixed, e744s, Tue Apr 9 11:33:59 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 5
  - MUVI: MUVI3
    Fixed, e744s, Tue Apr 9 11:40:33 2019, Daniele M, OTHER, General, N/A, 14N PACE4 cross check ------ E744s to-do list , proposal and other relevant documents 
[quote="Daniele M"]Fusion-evaporation calculation in the case of 14N (7.5MeV/u)

angular range [10-40]deg
Fixed, e744s, Tue Apr 9 11:49:54 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 6
  - MUVI: MUVI3
Fixed, e744s, Tue Apr 9 13:54:11 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 7
  - MUVI: MUVI1
Fixed, e744s, Tue Apr 9 13:54:35 2019, OttoRun, RUN, General, N/A, Run7 
*************************
  [SIZE=3][B]Run  : 7[/B][/SIZE]
*************************
Fixed, e744s, Tue Apr 9 14:18:06 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 8
  - MUVI: MUVI1
Fixed, e744s, Tue Apr 9 14:33:19 2019, OttoRun, RUN, General, N/A, Run8 
*************************
  [SIZE=3][B]Run  : 8[/B][/SIZE]
*************************
Fixed, e744s, Tue Apr 9 14:41:59 2019, OttoTime, RUN, General, N/A, TimeCalibratorRun 
*** Run Time Calibrator FSC ***
  - Run: 9
  - MUVI: MUVI2

ELOG Home Page