MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 126 of 132  Not logged in MUGAST
Status ExpNbr Date Author Typedown Category Target-Source Subject Text Attachments
Fixede744s Wed Apr 10 11:46:04 2019 iulianBEAMSocialN/AE744 StatusRefrigeration problem, beam stopped.
Optimistic estimation: they need 1 UT to
setup CIME => 14N could be back around 20h.
  
Fixede744s Wed Apr 10 20:16:22 2019 IulianBEAMGeneralN/A14N beam characteristics and Brho vamos settingAlso the beam profile on gas profiler before
and after inserting a peperpot 
 20190410_201051.jpg20190410_200749.jpg20190410_202255.jpg20190410_202353.jpg 
Fixede744s Thu Apr 11 07:00:17 2019 iulianBEAMGeneralCH2ToDo List and plan for todayTo Do/Understand
1) T_Vamos_Cats1 in Mugast and T_FPMW_CATS2
in Vamos are not working. I suspect it is
 run275_tacs_mugast.png 
Fixede744s Thu Apr 11 07:30:15 2019 mugastBEAMSocialN/ABeam stopThe beam will be back around 8:30.   
Fixede744s Thu Apr 11 10:38:13 2019 Adrien and ValerianBEAMGeneralN/AThey are preparing 14O beamNews from  (edit after talking to Pierre D.)
[LIST]
[*]  They are preparing the 14O beam.
  
Fixede744s Thu Apr 11 17:35:21 2019 FrançoisBEAMGeneral 14O beam is in G1 since 17H00alignment of the beam in VAMOS
intensity ~ 5x10^3 pps
  
Fixede744s Thu Apr 11 17:38:24 2019 mugast (beyhan)BEAMGeneral 14O8+ beam characteristicsBrho 14O8+ = 0.69186 Tm

 image1.jpegIMG_1581.jpg 
Fixede744s Thu Apr 11 18:36:34 2019 BeyhanBEAMGeneral before optimization : beam reconstructed profil with VAMOS and assoicated settingstarget : hole
cats2 out
about 4000 pps triggering VAMOS
 IMG_1583.jpgIMG_1582.jpg 
Fixede744s Fri Apr 12 00:29:11 2019 FrançoisBEAMGeneral no beamThey aligned the beam from CIME to G1 with
15N.
They are now working with 14O.
  
Fixede744s Fri Apr 12 01:56:35 2019 Jenn, Louis, Cyril,Daniele and ChloeBEAMGeneralEmptyBrho for the new 14O setting RUN86CATS2 on and target position 1: hole
Beam intensity in CATS: 4E4
VAMOS intensity 1.3E4
 Brho_14O_run86.png20190412_193918.jpg 
Fixede744s Fri Apr 12 06:51:59 2019 LouisBEAMGeneralN/ABrho and energy of the 14O beam   DSC_3261.JPG 
Fixede744s Sat Apr 13 00:32:09 2019 Faïrouz, Iulian, Antoine & coBEAMGeneralN/ATests to understand the broad width (120 mm!!!) of the beam size at the FP of VAMOS
Test 1: 14O beam on CH2 target (number 2=
105 um) and CATS2 inside: 
  
Fixede744s Sat Apr 13 04:35:43 2019 Mariluz Nikola NicolasBEAMGeneralCH2Beam was back for 10 min, and lost after efficiency problem in CSS2VAMOS and MUGAST spectra were checked after
the beam was back. Everything looks OK (e.g.
similar to previous screenshots)
  
Fixede744s Sat Apr 13 05:10:01 2019 Mariluz Nikola NicolasBEAMGeneralCH2Beam is back @ 2e4 pps (CATS)Beam is back, yeah!   
Fixede744s Sat Apr 13 11:44:21 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHBEAMGeneralCH2tempory beam interruptionventilation problem SPIRAL& - beam stopped
for presumably appro. 10 min (PCP info)
  
Fixede744s Sat Apr 13 13:58:08 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHBEAMHardwareCH2beam rate (read from CATS) as a function of time   rate_vs_time.pdf 
Fixede744s Sat Apr 13 14:28:00 2019 Marion, Kseniia, Dieter, Didier, Guiseppe, IuliaHBEAMGeneralCH2PCP information - beam interruptionbeam interrupted to an octupole (?) failure
- prevision to be back after 10-15 min (PCB
info)
  
Fixede744s Sun Apr 14 23:23:51 2019 Giuseppe, Mariluz, Jenn, Serge, Nishu, Didier, SimonBEAMHardwareCH2Beam downBeam disappeared for five minutes (23:20-23:25)   
Fixede744s Mon Apr 15 01:06:57 2019 FreddyBEAMGeneralN/ADipole tripA dipole tripped somewhere on the line, the
operators put it back to value very quickly.
Interruption of the beam for 2 minutes at
  
Fixede744s Mon Apr 15 18:12:47 2019 Marion BEAMHardwareCH2Test: attempt to reduce the emittance and improve the VAMOS/CATS ratioFailed....remains at ~2.3 (CATS1/VAMOS)   

ELOG Home Page