MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 130 of 132  Not logged in MUGAST
Status ExpNbr Date Author Typedown Category Target-Source Subject Text Attachments
Fixede768s Wed Jul 31 08:16:34 2019 Sylvain, NicolasBEAMGeneralLiFBeam profile and scaler at 08:00   index.jpgscalers_run160_10.png 
Fixede768s Wed Jul 31 14:07:24 2019 Sylvain & NicolasBEAMGeneralLiFBeam profile & scalers   20190731_135809.jpg 
Pinnede793s Wed Mar 10 13:10:14 2021 AdrienBEAMGeneralCD2Kinematical line from Ti contaminationIn black the Kinematical line for states known
to be populated strongly in 47Ti(d,p).
In blue range of the states of interrest.
 KineTiK.pdfKine.cxx 
Pendinge793s Wed Mar 10 20:36:19 2021 NigelBEAMGeneralCD2Beam centering - MUST2 hit pattern
We made a quick check of the beam centering
by inspecting the MUST2 (forward angles)
 Screenshot_from_2021-03-10_20-32-43.png 
Ongoinge793s Wed Mar 10 21:09:25 2021 mugast (Adrien, Nigel et co)BEAMGeneral Primary beam issues
The secondary beam intensity has been fluctuating
around 4 - 5 x 10**5 Hz most of the evening.
  
Fixede793s Thu Mar 11 02:50:14 2021 Ablaihan, LouisBEAMGeneralCD2VAMOS transmition at 2h50 beam intensity reached 1.1x10^6 pps
in CATS for 6.5x10^5 pps in VAMOS. The transmition
decreased to 60% without any shift of the
  
Fixede793s Thu Mar 11 04:38:31 2021 Ablaihan, LouisBEAMGeneralCD2Beam stopped due to a equipment tripped in CSS1Beam stopped 4h30 due to a equipment tripped
in CSS1. They are going to fix it. Estimated
timing of the intervention ~10/20min.
 Scaler_run53_4h30.png 
Pendinge793s Thu Mar 11 09:02:20 2021 mugastBEAMHardwareCD2beam interruptionpower supply trip on the accelerator beam
is off for about 30min
  
Fixede793s Thu Mar 11 11:20:35 2021 Nicolas, Lynda, CharlieBEAMGeneralCD2End of run 55MM impact matrix after tuning to center the
beam by Bertrand
 run54_MM_impact_matrx.png 
Fixede793s Fri Mar 12 08:58:09 2021 AdrienBEAMHardwareCD2Beam is stopped 8h55Beam stopped to fix a leak on the accelerator.
Intervention up to 4hours, maybe less.
  
Fixede793s Fri Mar 12 18:42:51 2021 Sarah, LouisBEAMGeneralCD2Beam BackThe beam is back at 18h40
The beam stopped due to source problems,
going up steadily, currently at ~2e5 pps
  
Fixede793s Sat Mar 13 11:16:38 2021 Lynda, Laetitia, ChloeBEAMGeneral beam lost and backwe loose the beam around 11:12, it should
be back in few minutes according to pcp.
  
Fixede793s Sat Mar 13 11:52:26 2021 Lynda, Laetitia, ChloeBEAMGeneralCD2Beam lostA security problem occurs at a door near CSS1
( AFR alarm ), need to call the security
to fix the problem
  
Fixede793s Sat Mar 13 14:41:28 2021 Lynda, Laetitia, ChloeBEAMGeneralCD2Beam is backBeam is back ~ 14h35, safety problem fixed
PCP said that the source is unstable so the
beam intensity will fluctuate
 run62_scaler_graph_14h48.png 
Fixede793s Sun Mar 14 10:01:36 2021 Juan Lois & faïrouz & AdrienBEAMHardwareCD2Beam intensity escalated up to 1.6e6 ppsAt 9:57 the intensity increased up to 1.6e6
pps and we had to call the pcp to put it
again to the normal values.
 BeanItensityJump_09h57_14_03_21.pngScaler_graph_10h47.png 
Fixede793s Sun Mar 14 11:06:07 2021 Faïrouz, Juan LoisBEAMGeneralCD2Slits open again. Beam intensity ~4.8e5 pps   run62_Scaler_graph_11h07.png 
Fixede793s Sun Mar 14 17:16:01 2021 Miguel, Wilton, AblaihanBEAMHardwareCD2Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached.Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes
 Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png 
Pendinge793s Mon Mar 15 00:21:18 2021 Sarah, Louis, CharlieBEAMGeneralCD2Source is running outThe beam intensity spiked to 9x10^9, so Louis
called PCP to ask them to reduce it. He was
told that the source was almost depleted,
 run62_Scaler_Mar14_00h40.png 
Fixede793s Mon Mar 15 02:08:19 2021 mugastBEAMGeneralCD2Beam stopped at 2:08Beam stopped at 2h08. The PCP want to make
some measurement on the source to get its
statues. Should take about 10 min.
  
Fixede793s Mon Mar 15 06:27:54 2021 Sarah, Louis, CharlieBEAMGeneralCD2Beam lost at 06h25. Returned at 06h30Electrostatic equipment from the source tripped.
Should only be a few minutes of interruption.
 beamdrop_06h25.png 

ELOG Home Page