Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e768s |
Tue Jul 23 11:02:54 2019 |
Kseniia, Gilbert | BEAM | General | | Beam profile | |
  |
Fixed | e768s |
Tue Jul 23 12:00:25 2019 |
Christian | BEAM | General | LiF | Profiler and beam current scaling since 11;10 | See also AGATA elog and run-log entry |
|
Fixed | e768s |
Tue Jul 23 14:33:03 2019 |
Marlène, Yorick, Faïrouz & Nicolas | BEAM | General | | Cheking beam transmission from G1 profiler to VAMOS | Goal:
Estimate beam transmission from profiler
to VAMOS (FP)
|
  |
Fixed | e768s |
Thu Jul 25 13:39:42 2019 |
mugast | BEAM | General | LiF | Beam stop due to high temperature | A lot of Qpoles power supplies had to be shutdown.
Beam stopped at 13h30. |
|
Fixed | e768s |
Fri Jul 26 02:27:48 2019 |
Marlène, Faïrouz, Franck, Bertrand, Sylvain, Diego, Nicolas | BEAM | General | | G1 profiler efficiency | G1 profiler efficiency was checked against
CATS1 for two beam intensities. Agreement
between the two measurements is within 20%
|
|
Fixed | e768s |
Fri Jul 26 13:48:41 2019 |
Marlène, Faïrouz, Bertrand & Nicolas | BEAM | General | | G1 profiler & VAMOS efficiency | Factor of two between the profiler and VAMOS
FP determination of incident beam is now
understood.
|
|
Pinned | e768s |
Sat Jul 27 04:12:57 2019 |
Sylvain & Freddy | BEAM | General | LiF | Run 152 - Scaler & screenshot + Beam profile | |
14x |
Fixed | e768s |
Sun Jul 28 04:22:15 2019 |
Jenn, Andres and Daniele | BEAM | General | N/A | Beam problems and DC trip | - Updated from PCP about the problem with
the beam: cyclotron went down and estimation
of ~5h to have the beam back.
|
|
Fixed | e768s |
Sun Jul 28 14:57:26 2019 |
Franco & Sylvain | BEAM | General | N/A | Beam problems and DC trip | The HV and the vacuum in VAMOS are now recovered
and back to the normal values. The water
tray is 20% filled and under control. Mugast |
|
Fixed | e768s |
Mon Jul 29 01:27:59 2019 |
Jenn | BEAM | General | LiF | Beam intensity and profile check | Run number 156: 15-O beam
beam intensity 8.8e6
OR Vamos ~ 106 |
|
Fixed | e768s |
Mon Jul 29 15:20:50 2019 |
Sylvain Andres, Freddy, Adrien, Franck | BEAM | General | LiF | Beam profile after beam intensity obtimisation | Beam recover at around 15:00 after beam optimisation
by PCP |
|
Fixed | e768s |
Mon Jul 29 15:58:53 2019 |
Freddy, Sylvain | BEAM | General | N/A | Beam profile and scaler r156 | beam down to 3.4*10^6 pps at 16h00 (or VAMOS
200 pps) |
 |
Fixed | e768s |
Mon Jul 29 19:49:19 2019 |
Freddy, Sylvain, Nicolas | BEAM | General | LiF | Run 158 : Beam profile after beam tuning | Below is the beam profile and the scaler corresponding
to the beam after optimisation
|
 |
Fixed | e768s |
Mon Jul 29 22:00:00 2019 |
Freddy, Sylvain | BEAM | General | LiF | Scaler Evolution run 158 | Evolution of scaler during run0158 _ from
19h to 24h00
|
|
Fixed | e768s |
Tue Jul 30 01:20:21 2019 |
Jenn & Franco | BEAM | General | LiF | Beam intensity, profile check and SUMMARY night | In run 158 at around 01:00am PCP took the
beam to try to optimize it. We got the beam
back after ~15 minutes.
|
  |
Fixed | e768s |
Tue Jul 30 04:25:49 2019 |
Jenn & Franco & Teodora | BEAM | General | LiF | Beam intensity, profile check and SUMMARY night |
This is what we were seeing in agata. We
think it might be possible we were having |
|
Fixed | e768s |
Tue Jul 30 15:47:46 2019 |
Nicolas | BEAM | General | | Beam stopped since 11h30 | vacuum problem in CSS1 |
|
Fixed | e768s |
Wed Jul 31 03:22:42 2019 |
Freddy, Chloé | BEAM | General | | Beam profile (run160) @2h24 | |
|
Fixed | e768s |
Wed Jul 31 03:25:57 2019 |
Freddy, Chloé | BEAM | General | N/A | Scaler Evolution run 160 | Scaler evolution during run 160 until 3h30
on Wednesday 31st.
|
|
Fixed | e768s |
Wed Jul 31 04:13:31 2019 |
Freddy, Chloé | BEAM | General | N/A | HF CIME disjonction | Disjonction HF CIME at 4h14
Restart at 4h30 (see beam profile and scalers |
 |