Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e793s |
Tue Mar 16 01:31:37 2021 |
Lynda, Cyril, Nishu | BEAM | General | CD2 | Beam intensity increased | We asked for a beam intensity increase around
01h10
The slits L5 were opened and more power (~ |
|
Fixed | e793s |
Tue Mar 16 07:22:12 2021 |
Lynda, Cyril, Nishu | BEAM | General | CD2 | Beam intensity decrease | The beam intensity decreased around 6h55 to
less than 1e5 pps
It is due to a change of the state of the |
|
Fixed | e793s |
Tue Mar 16 08:39:46 2021 |
Sarah, Chloé, Ablaihan | BEAM | General | CD2 | Beam dropped due to electric defect. @ 08h40 back @ 8h45 | |
|
Fixed | e744s |
Sat Apr 13 22:45:27 2019 |
Beyhan, Sylvain, Jaromir | AGATA | Software | N/A | Agata yellow phase 1 minute | Agata yellow 1 minute
All the trigers emitted by (every) single |
|
Fixed | e744s |
Tue Apr 16 08:30:58 2019 |
Kseniia, Dieter | AGATA | Social | CH2 | AGATA count rate over the last 12 hours | |
|
Fixed | |
Tue Apr 16 12:18:46 2019 |
AGATA | AGATA | Hardware | | ATC4 - position 13 HV tripped | - HV tripped around 12h10.
- need access to check the origin |
|
Fixed | |
Tue Apr 16 13:15:48 2019 |
AGATA | AGATA | Hardware | | ATC4 - position 13 HV tripped |
set 1500 V at 13h15 |
|
Fixed | e744s |
Wed Apr 17 07:04:24 2019 |
Valerian (Mariluz was the one in charge of AGATA) | AGATA | Software | CH2 | Cristal 4A stopped | Cristal 4A was stopped during the night, see
AGATA logbook for more details. |
|
Fixed | |
Wed Apr 17 11:25:29 2019 |
AGATA | AGATA | General | | AGATA background in Coinc with MUST2 with 14O beam | https://lxagata0.ganil.fr:8989/e744/56
http://run-control:8989/e744/56 |
|
Fixed | e744s |
Wed Apr 17 16:53:53 2019 |
Sylvain (AGATA) | AGATA | General | 152Eu | Run 137 : Eu calibration | Run stared 2019/04/17
EU efficiency Calibration |
|
Fixed | e786s |
Tue Jun 25 03:44:12 2019 |
Louis, Sylvain | AGATA | General | Cryo-3He | Run 56 : AGATA gamma rays in coincidences with VAMOS, MUST2 and/or MUGAST | As attachment are some gamma spectra we obtained
while trying several conditions on the run
056.
|
  |
Fixed | e786s |
Wed Jun 26 04:54:07 2019 |
Freddy | AGATA | General | N/A | AGATA validation problem (solved) | Since about 4h20, we realized that AGATA validated
events and timestamps have suddenly dropped
on the AGATA display (yellow bars instead |
|
Fixed | e786s |
Wed Jun 26 07:01:00 2019 |
Freddy | AGATA | General | N/A | AGATA validation problem - again - during run 59 | 30 min after Emmanuel left (around 6h00),
the AGATA problem of validation reappeared...
|
|
Fixed | e768s |
Sun Jul 21 10:58:39 2019 |
Christian | AGATA | General | LiF | 13c resync | 13c resync at 10.57
lost 5 min agata data |
|
Fixed | e768s |
Sun Jul 21 17:45:54 2019 |
kseniia | AGATA | General | | Current total stats on 19Ne | Stats from runs 112, 115, 116, 117, 118, 119(~15h)
beta = 8%
Q = 9 & 10 |
 |
Fixed | |
Sun Jul 21 22:28:11 2019 |
Kseniia | AGATA | General | | 15O implantation | Attached is the intensity distribution of
511 keV in run 119 (first image) vs run 120
(second image).
|
 |
Fixed | |
Sun Jul 21 23:18:25 2019 |
Kseniia | AGATA | General | | Current total stats on 19Ne | Runs 112, 115, 116, 117, 118, 119, 120 and
~1h of 121
|
|
Fixed | |
Mon Jul 22 12:33:17 2019 |
Kseniia | AGATA | General | | Stats on 19Ne | Full stats for runs 112..124 with the event-by-event
Doppler correction. So, we see 4140 kev.
Also, the betas of all the 19Ne with Q= 9,10 |
  |
Fixed | |
Mon Jul 22 12:54:25 2019 |
Kseniia | AGATA | General | | Beta vs gamma-ray energy in 19Ne, runs 112-124 | |
|
Fixed | e768s |
Mon Jul 22 17:54:49 2019 |
Christian and Jeremie | AGATA | General | LiF | Comparison EGamma 19Ne, Q8 vs Q9 | 1) Beam velocity from VAMOS for AGATA doppler
correction. Beta is understandable for the
three main charge states seen (with Q9 and |
  |