MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 47 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject
Fixede738 Sat Jul 14 01:24:51 2018 e748RUNGeneralCryo-LH2run 378
count rate in Cats : 100 kHz
Start time: 00:42
Attachment 1: scaler_2018-07-14_00h46m48s.png
scaler_2018-07-14_00h46m48s.png
Attachment 2: visu_2018-07-14_00h48m31s.png
visu_2018-07-14_00h48m31s.png
Attachment 3: visu_2018-07-14_00h52m28s.png
visu_2018-07-14_00h52m28s.png
Fixede738 Sat Jul 14 02:46:34 2018 e748RUNGeneralCryo-LH2run 379
count rate in Cats : 100 kHz
Start time: 02:41
Attachment 1: scaler_2018-07-14_02h44m19s.png
scaler_2018-07-14_02h44m19s.png
Attachment 2: visu_2018-07-14_02h45m36s.png
visu_2018-07-14_02h45m36s.png
Fixede738 Sat Jul 14 05:00:37 2018 e748RUNGeneralCryo-LH2run 380
count rate in Cats : 100 kHz
Start time: 04:38
Attachment 1: scaler_2018-07-14_04h41m20s.png
scaler_2018-07-14_04h41m20s.png
Attachment 2: visu_2018-07-14_04h49m58s.png
visu_2018-07-14_04h49m58s.png
Fixede738 Sat Jul 14 06:49:03 2018 e748RUNGeneralCryo-LH2run 380
count rate in Cats : 100 kHz
Start time: 06:39
Attachment 1: scaler_2018-07-14_06h43m26s.png
scaler_2018-07-14_06h43m26s.png
Attachment 2: screenshot_2018-07-14_06h42m28s.png
screenshot_2018-07-14_06h42m28s.png
Attachment 3: visu_2018-07-14_06h44m35s.png
visu_2018-07-14_06h44m35s.png
Attachment 4: visu_2018-07-14_06h48m04s.png
visu_2018-07-14_06h48m04s.png
Attachment 5: visu_2018-07-14_06h50m58s.png
visu_2018-07-14_06h50m58s.png
Fixede738 Sat Jul 14 09:57:36 2018 takeshiTARGETHardwareCryo-LH2target temperature during night
I would share the temperature log of the target as it was liquefied 21:00 13th.
Attachment 1: liquiefy1307.png
liquiefy1307.png
Fixede738 Sat Jul 14 10:14:00 2018 marlčne, jacques, daisukeRUNGeneralCryo-LH2RUN 382
12C + liquid H. Before the run, the beam stopped for 2 hours due to the gate valve of E9 shut out the beam. This is because the manually operate turbo pump was turned off by itself due to unknown reason. Sébastien came to close the valve of this turbo pump and evacuate E9 using another turbo pump only. The vacuum of E9 is about 4e-5 mbar as of 9 am.The interlock is set at 9e-5 mbar.

09h27 start
10h30 increased primary beam intensity slightly. Before 80 kpps on plastic, after 95 kpps. Leakage current of CATs 0.10/0.08 micro A to 0.12/0.10 micro A.
11h35 stop.
Attachment 1: scaler_2018-07-14_10h20m22s.png
scaler_2018-07-14_10h20m22s.png
Attachment 2: visu_2018-07-14_10h20m07s.png
visu_2018-07-14_10h20m07s.png
Attachment 3: visu_2018-07-14_10h20m10s.png
visu_2018-07-14_10h20m10s.png
Attachment 4: visu_2018-07-14_10h20m16s.png
visu_2018-07-14_10h20m16s.png
Attachment 5: screenshot_2018-07-14_10h36m38s.png
screenshot_2018-07-14_10h36m38s.png
Attachment 6: scaler_2018-07-14_10h36m59s.png
scaler_2018-07-14_10h36m59s.png
Attachment 7: visu_2018-07-14_11h34m44s.png
visu_2018-07-14_11h34m44s.png
Attachment 8: visu_2018-07-14_11h34m39s.png
visu_2018-07-14_11h34m39s.png
Attachment 9: scaler_2018-07-14_11h34m38s.png
scaler_2018-07-14_11h34m38s.png
Fixede738 Sat Jul 14 11:37:58 2018 marlčne, daisukeRUNGeneralCryo-LH2RUN 383
12C + liquid H.
11h33 start.
12h00 Asked PCP to increase the intensity. CATS1,2 120 kpps. Plastic 100 kpps. CATS1/2 0.14/0.10 micro A. CATS2 current bursts to ~0.5 micro A once every 30 sec.
12h10 Asked PCP to decrease the intensity. CATS1,2 110 kpps. Plastic 90 kpps. CATS1/2 0.12/0.10 micro A. CATS2 current bursts to ~0.4 micro A once every 30 sec.
12h45 Asked PCP to increase the intensity. CATS1,2 110 kpps. Plastic 90 kpps. CATS1/2 0.12/0.10 micro A.
14h00 stop.
Attachment 1: scaler_2018-07-14_11h38m25s.png
scaler_2018-07-14_11h38m25s.png
Attachment 2: visu_2018-07-14_11h38m37s.png
visu_2018-07-14_11h38m37s.png
Attachment 3: visu_2018-07-14_11h38m59s.png
visu_2018-07-14_11h38m59s.png
Attachment 4: visu_2018-07-14_11h39m02s.png
visu_2018-07-14_11h39m02s.png
Attachment 5: visu_2018-07-14_11h39m13s.png
visu_2018-07-14_11h39m13s.png
Attachment 6: visu_2018-07-14_11h39m16s.png
visu_2018-07-14_11h39m16s.png
Attachment 7: visu_2018-07-14_11h39m20s.png
visu_2018-07-14_11h39m20s.png
Attachment 8: visu_2018-07-14_11h39m27s.png
visu_2018-07-14_11h39m27s.png
Attachment 9: visu_2018-07-14_11h39m30s.png
visu_2018-07-14_11h39m30s.png
Attachment 10: visu_2018-07-14_11h39m33s.png
visu_2018-07-14_11h39m33s.png
Attachment 11: visu_2018-07-14_11h39m37s.png
visu_2018-07-14_11h39m37s.png
Attachment 12: visu_2018-07-14_11h39m44s.png
visu_2018-07-14_11h39m44s.png
Attachment 13: visu_2018-07-14_11h39m55s.png
visu_2018-07-14_11h39m55s.png
Attachment 14: visu_2018-07-14_11h40m12s.png
visu_2018-07-14_11h40m12s.png
Attachment 15: screenshot_2018-07-14_11h41m13s.png
screenshot_2018-07-14_11h41m13s.png
Attachment 16: scaler_2018-07-14_12h01m56s.png
scaler_2018-07-14_12h01m56s.png
Attachment 17: screenshot_2018-07-14_12h02m19s.png
screenshot_2018-07-14_12h02m19s.png
Attachment 18: scaler_2018-07-14_12h14m22s.png
scaler_2018-07-14_12h14m22s.png
Attachment 19: screenshot_2018-07-14_12h14m26s.png
screenshot_2018-07-14_12h14m26s.png
Attachment 20: scaler_2018-07-14_12h45m42s.png
scaler_2018-07-14_12h45m42s.png
Attachment 21: screenshot_2018-07-14_12h46m10s.png
screenshot_2018-07-14_12h46m10s.png
Attachment 22: scaler_2018-07-14_13h59m36s.png
scaler_2018-07-14_13h59m36s.png
Attachment 23: visu_2018-07-14_13h59m43s.png
visu_2018-07-14_13h59m43s.png
Attachment 24: visu_2018-07-14_13h59m48s.png
visu_2018-07-14_13h59m48s.png
Attachment 25: visu_2018-07-14_13h59m54s.png
visu_2018-07-14_13h59m54s.png
Fixede738 Sat Jul 14 14:01:55 2018 Daisuke, Jacques, Shumpei, ValérieRUNGeneralCryo-LH2RUNS 384-385
12C + liquid H.

RUN 384 start 13h58 stop 15h54
CATS1/2 110 kHz, 0.12/0.10 micro A Plastic 90 kHz.
e748 Exxx 2,1G 14 juil. 15:54 /data/e748X/e755/acquisition/run/run_0384.dat.14-07-18_13h58m20s

RUN 385 start 15h54 stop 18h05
e748 Exxx 2,5G 14 juil. 2018 /data/e748X/e755/acquisition/run/run_0385.dat.14-07-18_15h53m48s
Attachment 1: scaler_2018-07-14_14h02m40s.png
scaler_2018-07-14_14h02m40s.png
Attachment 2: screenshot_2018-07-14_14h03m00s.png
screenshot_2018-07-14_14h03m00s.png
Attachment 3: scaler_2018-07-14_14h26m35s.png
scaler_2018-07-14_14h26m35s.png
Attachment 4: scaler_2018-07-14_15h53m36s.png
scaler_2018-07-14_15h53m36s.png
Attachment 5: visu_2018-07-14_15h53m38s.png
visu_2018-07-14_15h53m38s.png
Attachment 6: visu_2018-07-14_15h53m45s.png
visu_2018-07-14_15h53m45s.png
Attachment 7: visu_2018-07-14_15h53m50s.png
visu_2018-07-14_15h53m50s.png
Attachment 8: visu_2018-07-14_15h53m56s.png
visu_2018-07-14_15h53m56s.png
Attachment 9: visu_2018-07-14_15h54m03s.png
visu_2018-07-14_15h54m03s.png
Attachment 10: visu_2018-07-14_15h54m10s.png
visu_2018-07-14_15h54m10s.png
Attachment 11: visu_2018-07-14_15h54m19s.png
visu_2018-07-14_15h54m19s.png
Attachment 12: ScalersRun385At17h.png
ScalersRun385At17h.png
Attachment 13: Run385_MMEdePID.png
Run385_MMEdePID.png
Attachment 14: Run385_IC0deg.png
Run385_IC0deg.png
Attachment 15: Run385_deTOFCatsCaviar.png
Run385_deTOFCatsCaviar.png
Attachment 16: Run385_ScalersEndRun.png
Run385_ScalersEndRun.png
Fixede738 Sat Jul 14 18:18:33 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 386 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 2mm then +/-5 mm at the beginning of the run
RUN 386 start 18h16 stop 18h28
e748 Exxx 1,3G 14 juil. 2018 /data/e748X/e755/acquisition/run/run_0386.dat.14-07-18_18h15m43s
Attachment 1: Run386_ScalersFH31at5mm_At18h18.png
Run386_ScalersFH31at5mm_At18h18.png
Attachment 2: Run386_ScalersFH31at5mm_Caviar.png
Run386_ScalersFH31at5mm_Caviar.png
Attachment 3: Run386_TOF_FH31_5mm.png
Run386_TOF_FH31_5mm.png
Attachment 4: Run386_ScalersFH31at5mm_Caviar.png
Run386_ScalersFH31at5mm_Caviar.png
Attachment 5: Run386_ScalersFH31at5mm_At18h18.png
Run386_ScalersFH31at5mm_At18h18.png
Attachment 6: Run386_Ic_DE_TcatsHF_FH31_5mm.png
Run386_Ic_DE_TcatsHF_FH31_5mm.png
Attachment 7: Run386_Ic_DE_Tcats_Caviar_PLQFH31_5mm.png
Run386_Ic_DE_Tcats_Caviar_PLQFH31_5mm.png
Attachment 8: Run386_BeamImpact_5mm.png
Run386_BeamImpact_5mm.png
Fixede738 Sat Jul 14 18:36:38 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 387 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6ľA TRIGGERS CATS2, PLASTIC div
RUN 387
Fixede738 Sat Jul 14 18:37:29 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 388 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6ľA normal TRIGGERS MUST2 CATS div Plastic div
RUN 388 start 18h3
Attachment 1: Run388_ScalersCaviarFH31_5mm_I1.6ÂľA.png
Run388_ScalersCaviarFH31_5mm_I1.6ÂľA.png
Attachment 2: Run388_Scalers.png
Run388_Scalers.png
Attachment 3: Run388_TOF.png
Run388_TOF.png
Fixede738 Sat Jul 14 18:54:01 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 389 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 30 mm F43 opened
I ~ 1.6ľA normal TRIGGERS MUST2 CATS div Plastic div
RUN 389 start 18h45 stop 18h55
e748 Exxx 469M 14 juil. 18:57 /data/e748X/e755/acquisition/run/run_0389.dat.14-07-18_18h44m21s
Attachment 1: Run389_scalersCaviar.png
Run389_scalersCaviar.png
Attachment 2: Run389_scalers.png
Run389_scalers.png
Attachment 3: Run389_TOF.png
Run389_TOF.png
Attachment 4: Run389_EdeTOFCatsIntr.png
Run389_EdeTOFCatsIntr.png
Attachment 5: Run389_EdeTOFCats.png
Run389_EdeTOFCats.png
Attachment 6: Run389_EdeTOF.png
Run389_EdeTOF.png
Attachment 7: Run389_beamTracks.png
Run389_beamTracks.png
Fixede738 Sat Jul 14 19:01:22 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 390 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA

normal TRIGGERS MUST2 CATS div Plastic div
RUN 390 start 18h58 stop 19h27
e748 Exxx 873M 14 juil. 19:29 /data/e748X/e755/acquisition/run/run_0390.dat.14-07-18_18h57m53s
CATS1 I ~ 0.22ľA
CATS2 I~ 0.16 ľA
Brho1 RMN = 1.7283 T.m I_D3P1= 305A
The Brho1 value is there 0.1% smaller than it was during the previous data taking for 9C.
Here the purity of the beams is:
Total integral: 6.22 10**4 (without 0, all beams)
9C 3.5% (integral = 2200 for channels [2800;4200])
7Be 72.2% (integral = 4.488 10**4 for channels [4500;6500])
6Li 15% (integral = 9570 for channels [6500;8000])
Attachment 1: Run390_scalersCaviar.png
Run390_scalersCaviar.png
Attachment 2: Run390_scalers.png
Run390_scalers.png
Attachment 3: Run390_beamTracksYshift.png
Run390_beamTracksYshift.png
Attachment 4: Run390_beamTrackWien1kVYok.png
Run390_beamTrackWien1kVYok.png
Attachment 5: Run390_scalersYcenterOk.png
Run390_scalersYcenterOk.png
Attachment 6: Run390_scalersCaviarYOk.png
Run390_scalersCaviarYOk.png
Attachment 7: Run390_TOF.png
Run390_TOF.png
Fixede738 Sat Jul 14 19:38:25 2018 Daisuke, Jean-Charles, Shumpei, ValérieRUNGeneralCryo-LH2RUN 391 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA

RUN 391 start 19h30 stop 19h43
e748 Exxx 286M 14 juil. 19:45 /data/e748X/e755/acquisition/run/run_0391.dat.14-07-18_19h30m29s
normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1=

Total integral: 4.017 10**4 (without 0, all beams)
9C ~ 5 % (integral = 2160 for channels [2800;4200])
7Be 59 % (integral = 2.236 10**4 for channels [4500;6500])

Beam CATS1 ~ 133 kpps; CATS ~ 117 kpps ; Plastic ~ 124 kpps
CATS1 I ~ 0.08 ľA
CATS2 I ~ 0.06 ľA
Attachment 1: Run391_TOF.png
Run391_TOF.png
Attachment 2: Run391_scalers.png
Run391_scalers.png
Fixede738 Sat Jul 14 20:16:50 2018 Daisuke, Shumpei, ValérieRUNGeneralCryo-LH2RUN 392 9C
9C + liquid H.
RUN 392 start 19h46 stop 21h47
e748 Exxx 3,5G 14 juil. 21:49 /data/e748X/e755/acquisition/run/run_0392.dat.14-07-18_19h45m58s
normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1= 305.1A
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA
Intensity is fluctuating at the end of run 392 down to I~ 1.7 ľA then 1.6-1.5ľA.
Apparently due to general instabilities related to the decrease of the external air temperature (..). PCP is re-tuning.
Total integral:1.0 10**4 (without 0, all beams)
8B 8.2% (integral = 824 for channels [200;2200])
9C ~ 4.5 % (integral = 454 for channels [2800;4200])
7Be 65.8 % (integral = 6585 for channels [4500;6500])
6Li 21.1% (integral = 2113 for channels [6500;8000])

Beam CATS1 ~ 185kpps; CATS ~ 164 kpps ; Plastic ~ 170 kpps
CATS1 I ~ 0.08 ľA
CATS2 I ~ 0.06 ľA
Attachment 1: Run392_TOF.png
Run392_TOF.png
Attachment 2: Run392_scalers.png
Run392_scalers.png
Attachment 3: Run392_GMTTrigger.png
Run392_GMTTrigger.png
Attachment 4: Run392_plotTrigger.png
Run392_plotTrigger.png
Attachment 5: Run392_TOFcatstot.png
Run392_TOFcatstot.png
Attachment 6: Run392_TOFcatstotZoom.png
Run392_TOFcatstotZoom.png
Attachment 7: Run392_ScalersPlot.png
Run392_ScalersPlot.png
Attachment 8: Run392_PlotPlast.png
Run392_PlotPlast.png
Attachment 9: Run392_MMimpacts.png
Run392_MMimpacts.png
Attachment 10: Run392_MMECsIraw.png
Run392_MMECsIraw.png
Attachment 11: Run392_DCnumexo.png
Run392_DCnumexo.png
Attachment 12: Run392_CatsstrQraw.png
Run392_CatsstrQraw.png
Attachment 13: Run392_CatsQcal.png
Run392_CatsQcal.png
Attachment 14: Run392_BeamTracks.png
Run392_BeamTracks.png
Attachment 15: Run392_EdeTOFcatsTot.png
Run392_EdeTOFcatsTot.png
Attachment 16: Run392_EdeTOFcatsIntegIC.png
Run392_EdeTOFcatsIntegIC.png
Attachment 17: Run392_EdeTOFcatsEdePlast.png
Run392_EdeTOFcatsEdePlast.png
Attachment 18: Run392_DCnumexoXYphys.png
Run392_DCnumexoXYphys.png
Attachment 19: Run392_ChIoNumexo.png
Run392_ChIoNumexo.png
Attachment 20: Run392_MmEdeCsIPlotPID.png
Run392_MmEdeCsIPlotPID.png
Attachment 21: Run392_scalersendRun.png
Run392_scalersendRun.png
Fixede738 Sat Jul 14 21:53:48 2018 Daisuke, Shumpei, ValérieRUNGeneralCryo-LH2RUN 393 9C
9C + liquid H.
RUN 393 start 21h48 stop 23h49
e748 Exxx 4,0G 14 juil. 23:49 /data/e748X/e755/acquisition/run/run_0393.dat.14-07-18_21h48m17s
e748 Exxx 382M 15 juil. 00:01 /data/e748X/e755/acquisition/run/run_0393.dat.14-07-18_21h48m17s.1

normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1= 305.1A
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA
PCP retuned the beam. Intensity is increasing up to 1.8 ľA but fluctuating again down to 1.5 ľA.
Better at 22h10, I ~ 1.88 ľA.

Beam CATS1 ~ 188kpps ; CATS2 ~ 167 kpps ; Plastic ~ 172 kpps
up to CATS1 214 kpps; CATS2 ~ 191 kpps; ; Plastic ~ 198 kpps.
CATS1 I ~ 0.08 ľA to 0.14 ľA
CATS2 I ~ 0.06 ľA to 0.10 ľA
Attachment 1: Run393_scalersAt21h54.png
Run393_scalersAt21h54.png
Attachment 2: Run393_MMimpacts.png
Run393_MMimpacts.png
Attachment 3: Run393_MMedeCsIPID.png
Run393_MMedeCsIPID.png
Attachment 4: Run393_BeamTracks.png
Run393_BeamTracks.png
Attachment 5: Run393IC0degDet.png
Run393IC0degDet.png
Attachment 6: Run393_EdeTOF_EDEPlastPID.png
Run393_EdeTOF_EDEPlastPID.png
Attachment 7: Run393_EdeTOFcats.png
Run393_EdeTOFcats.png
Attachment 8: Run393catsQraw.png
Run393catsQraw.png
Attachment 9: Run393scalersEndRun.png
Run393scalersEndRun.png
Fixede738 Sun Jul 15 00:48:03 2018 takeshiRUNGeneralN/Arun summary
Here are the run summary of E738 experiment up to 1:00 am 15th.
31.7 hours for 10C + H2
1.2 hours for 10C + empty
82.3 hours for 9C + H2
5.9 hours for 9C + empty (ongoing, should be 23 hours at 18:00 15th)
19.5 hours for 12C + H2

See here for detail.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919
Fixede738 Sun Jul 15 00:49:52 2018 Megumi, Shumpei, Takeshi, Benoît, ValérieRUNGeneralCryo-emptyRUN 394 9C
9C + Empty target 15th JULY
RUN 394 start 0h43 stop 03h20
e748 Exxx 2,9G 15 juil. 2018 /data/e748X/e755/acquisition/run/run_0394.dat.15-07-18_00h43m25s
SEE OFFLINE PLOTS for the checking of the empty target.
normal TRIGGERS MUST2 CATS div Plastic div
primary beam I ~ 1.85 ľA.

Beam CATS1 ~ 208 kpps ; CATS2 ~ 185 kpps ; Plastic ~ 194 kpps

CATS1 I ~ 0.12 ľA
CATS2 I ~ 0.10 ľA
Attachment 1: Run394_scalersAt0h45.png
Run394_scalersAt0h45.png
Attachment 2: Run394_CatsStrRaw.png
Run394_CatsStrRaw.png
Attachment 3: Run394_BeamTracks.png
Run394_BeamTracks.png
Attachment 4: Run394_TOF.png
Run394_TOF.png
Attachment 5: visu_2018-07-15_03h20m53s.png
visu_2018-07-15_03h20m53s.png
Fixede738 Sun Jul 15 01:26:49 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target
Here are the temperature log of the target before it was evaporated.
Attachment 1: heatshiled1507.png
heatshiled1507.png
Attachment 2: cell1507.png
cell1507.png
Fixede738 Sun Jul 15 01:35:09 2018 takeshi, ValérieONLINEGeneralN/Aproblem of the beam image on vigru
The beam image at the target is not clear on online monitor.
We have confirmed that the target is correctly evacuated to empty now (and fully filled before that) by offline.
Attachment 1: run394.png
run394.png
Attachment 2: target_run393.pdf
target_run393.pdf
Attachment 3: target_run394.pdf
target_run394.pdf
Attachment 4: targetY_run393.pdf
targetY_run393.pdf
Attachment 5: targetY_run394.pdf
targetY_run394.pdf

ELOG Home Page