MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 1 of 48  Not logged in MUST2
New entries since:Thu Jan 1 01:00:00 1970
Status ExpNbr Date Author Type Category Target-Source Subject
Pinnede748 Thu Mar 23 11:19:13 2017 Adrien Matta   Schedule
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.


CATS Mounting: 29th
PinnedGeneral Fri Mar 24 09:32:11 2017 Adrien MattaMUST2Software Usefull document for MUST2 operations
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS

Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC

Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero
Attachment 1: NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf
NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdf
Attachment 2: MUVI_card_USER_MANUAL_(ver_081013).pdf
MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf MUVI_card_USER_MANUAL_(ver_081013).pdf
Fixede748 Wed May 24 09:07:59 2017 Adrien MattaOTHERGeneral e748 Planning

Feel free to edit this spread sheet.

spreadsheet link:  https://docs.google.com/spreadsheets/d/1QD0HMJz3DSaX7VqEz07jOG83-SyeKBIwrZzxFNN0aJk/edit#gid=1578876317

Pinnede748 Wed May 24 09:19:57 2017 Adrien MattaOTHERSocial e748 Collaborators
List of Collaborators (Please edit if anyone is missing):

IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel

CEA Saclay: M. Vandebrouck, V Lapoux,

Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam

Universitad des Santiago de Compostela: B. Fernandez-Dominguez

Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont

LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.

RIKEN/TODAI: D. Susuki, S. Koyama
Fixede748 Wed May 24 09:32:41 2017 Adrien MattaMUST2Hardware Mounting of the telescope in G3
The telescope has been mounted in there stand in G3.

  • Detector are now mounted and fitted with their DSSD.
  • BT test ok
  • HT test ongoing
Fixede748 Wed May 24 09:35:00 2017 Adrien MattaCATSHardware BTD chambers mounting in D6
Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
The DIN flange for BTD2 is missing.
The chamber need to be Vaccuum tested before surveyor alignement.
Fixede748 Wed May 24 15:48:24 2017 Adrien MattaMUST2Hardware PCB number for each telescope
  • T1 PCB 5
  • T2 PCB 9
  • T3 PCB 7
  • T4 PCB 11
  • T5 PCB 6
  • T6 PCB 10
  • T7 PCB 3
  • T8 PCB 2
Fixede748 Thu Jun 1 09:29:50 2017 Adrien MattaMUST2Hardware Telescope cabling debbug in G3
Test performed without vaccum, in the dark, cooling at 20.

  • T1 Ok
  • T2 Ok, PCB was mounted reverse
  • T3 Ok
  • T4 Ok
  • T5 Ok, after fixing capton
  • T6 Ok, cables misslabelled and inverted with T7, Capton not plug on Y card
  • T7 Ok,
  • T8 Ok,
Fixede748 Thu Jun 1 09:32:38 2017 Adrien MattaMUST2Hardware MUST2 cabling scheme
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.

Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.

Telescope 5 to 8 are on the large distribution box and the second HV card. This correspond to the port side flange.

CAEN SY1527 setting has been changed accordingly.
Fixede748 Fri Jun 2 12:03:32 2017 Adrien, Laurent, ShumpeiMUST2Hardware M2C vacuum test
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Gailor switch on the turbo during lunch time. We reach 2e-5 mbar, but the vacuum is oscillating. Gailor suspect the gauge.
We added a second gauge, it gave 2E-4, switch to a third one, same reading.

So first gauge to be changed.

we are gradually improving vacuum so we thinks it is plastic releasing gas.

Cooling switch on to -10, blocks are cooling down successfully.

All DSSD, CsI and SiLi works with rather low current (below 0.5uA).

After three day, vacuum level rise to 6 mbar. According to Vincent; this is standard for static vacuum, so no sign of major leak.
Fixede748 Tue Jun 6 09:07:34 2017 Adrien MattaBEAMGeneral Moving to D6
M2C Chamber now in D6 after a smooth ride, ready to be aligned.
Ongoinge748 Tue Jun 6 17:57:07 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2

EXL seems to fit in Adrien's setup. We still have to check if it fits in the chamber.
Attachment 1: EXL_MUST2_top.png
EXL_MUST2_top.png
Fixede748 Tue Jun 6 18:17:03 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2
EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the chamber.
Attachment 1: EXL_MUST2_top.jpg
EXL_MUST2_top.jpg
Attachment 2: EXL_MUST2_side.jpg
EXL_MUST2_side.jpg
Fixede748 Wed Jun 7 11:29:55 2017 AdrienMECHHardwareN/ASurveyor mesurement
The surveyor are carrying out the measurement of the detectors in D6.
The measurement should take the day, starting with the main plate, and then in the afternoon the detectors.

All measurement done, WAITING FOR REPORT.
Fixede748 Wed Jun 7 18:03:02 2017 FranckOTHERHardware LPC electronics
Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
Lecroy Coinc 465: E2229
Lecroy FIFO 429A: E2631A, E2600, 98971, 01175B
Lecroy NIM-ECL 4616: E2559, E2321, 82791
Quad CFD 7174: 042, 046, 047, 051, 117, 206
Octal FAN-OUT 364: E2315
QDC VXI 3214 410pC
Wiener NIM Crate 600 W
Fixede748 Thu Jun 8 18:57:14 2017 Valérie LapouxMUST2Hardware Currents and Voltages on MUST2
Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature at -5°C.
Low voltages and HV ON
MUST2 "nominal" voltages and currents:
-----------------------------------------------------
DSSD T1 pcb5 80V ; ~1.7 µA | CsI 50V (~nA)
-----------------------------------------------------
DSSD T2 pcb9 80V ; ~1.4 µA | CsI 50V
-----------------------------------------------------
DSSD T3 pcb7 70V ; ~1. µA | CsI 50V
-----------------------------------------------------
DSSD T4 pcb11 80V ; ~1. µA | CsI 50V
--------------------------------------------------------------------
DSSD T5 pcb6 80V ; ~ 0.4 µA | SiLiT5-1 700V 10.72 µA ; SiLiT5-2 700V 2.16µA
--------------------------------------------------------------------
DSSD T6 pcb10 80V ; ~1.7 µA | CsI 50V
-----------------------------------------------------------
DSSD T7 pcb3 80V ; ~1.7 µA | CsI 50V
--------------------------------------------------------------------
DSSD T8 pcb2 60V ; ~1.7 µA | SiLiT8-1 700V 2.46 µA | SiLiT8-2 600V 3.4 µA
--------------------------------------------------------------------
Fixede748 Fri Jun 9 12:30:49 2017 AdrienVACUUMHardware Vacuum Leaks
We reach a stable 1e-5 mbar. We performed a leak check and identify that the Ionisation chamber gate valve is not totally tight, I don't think there is much to be done.
One of the M2C flange also have a micro leak, that we will solve next tuesday when reopening the chamber.

NOW FIXED
Fixede748 Fri Jun 9 12:33:25 2017 AdrienMECHGeneral MUST2 position
After a the surveyor came we figured out the MUST2 telescope are 1cm too high with respect to the beam line.
Vincent is preparing new feet to replace the one supporting the main plate. We will support the plate with adjustable one while replacing the other so there is no need to dismount any detector.




NOW FIXED:

Vincent Morel and Laurent Meneger put in the new fit without unmounting the detector. all went smoothly.
Fixede748 Fri Jun 9 12:34:18 2017 AdrienDAQHardware Hub
We are currentlky waiting for the hub to be configured so we can start the MUST2 DAQ. Should be done in the afternoon.
Fixede748 Fri Jun 9 12:35:46 2017 AdrienMUST2Hardware CsI trip on T6
The detector were left on during the night. T6 CsI trip and cannot be switch on again. Once we established that all the MUFFEE works correctly we will start investigating the issue, perhaps coming from the distribution box.


NOW FIXED:

Not really clear what was the issue, Most likely a loose HT cables on the feedthrough flange.

ELOG Home Page