Pinnede748 Thu Mar 23 11:19:13 2017 Adrien Matta   ScheduleThis message will contain the update schedule
of the preparation of e748.
  
PinnedGeneral Fri Mar 24 09:32:11 2017 Adrien MattaMUST2Software Usefull document for MUST2 operationsDAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
 NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdfMUVI_card_USER_MANUAL_(ver_081013).pdf 
Fixede748 Wed May 24 09:07:59 2017 Adrien MattaOTHERGeneral e748 PlanningFeel free to edit this spread sheet.

  
Pinnede748 Wed May 24 09:19:57 2017 Adrien MattaOTHERSocial e748 CollaboratorsList of Collaborators (Please edit if anyone
is missing):
  
Fixede748 Wed May 24 09:32:41 2017 Adrien MattaMUST2Hardware Mounting of the telescope in G3The telescope has been mounted in there stand
in G3. 
  
Fixede748 Wed May 24 09:35:00 2017 Adrien MattaCATSHardware BTD chambers mounting in D6Sebastient started mounting the BTD chamber
in D6. 
The frame is in place, BTD chambers one and
  
Fixede748 Wed May 24 15:48:24 2017 Adrien MattaMUST2Hardware PCB number for each telescope[LIST]
[*] T1 PCB 5
[*] T2 PCB 9
  
Fixede748 Thu Jun 1 09:29:50 2017 Adrien MattaMUST2Hardware Telescope cabling debbug in G3Test performed without vaccum, in the dark,
cooling at 20.
  
Fixede748 Thu Jun 1 09:32:38 2017 Adrien MattaMUST2Hardware MUST2 cabling schemeThe MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
  
Fixede748 Fri Jun 2 12:03:32 2017 Adrien, Laurent, ShumpeiMUST2Hardware M2C vacuum testWe mounted 2 dry pump on the chamber and started
pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
  
Fixede748 Tue Jun 6 09:07:34 2017 Adrien MattaBEAMGeneral Moving to D6M2C Chamber now in D6 after a smooth ride,
ready to be aligned.
  
Ongoinge748 Tue Jun 6 17:57:07 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2
EXL seems to fit in Adrien's setup. We still
have to check if it fits in the chamber.
 EXL_MUST2_top.png 
Fixede748 Tue Jun 6 18:17:03 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2EXL seems to fit with Adrien's setup. 
We still have to test if it fits inside the
chamber.
 EXL_MUST2_top.jpgEXL_MUST2_side.jpg 
Fixede748 Wed Jun 7 11:29:55 2017 AdrienMECHHardwareN/ASurveyor mesurementThe surveyor are carrying out the measurement
of the detectors in D6.
The measurement should take the day, starting
  
Fixede748 Wed Jun 7 18:03:02 2017 FranckOTHERHardware LPC electronicsCaen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
  
Fixede748 Thu Jun 8 18:57:14 2017 Valérie LapouxMUST2Hardware Currents and Voltages on MUST2 Thursday 8th June. 
Vacuum in the chamber 9e-05 mbar; MUST2 temperature
at -5°C.
  
Fixede748 Fri Jun 9 12:30:49 2017 AdrienVACUUMHardware Vacuum LeaksWe reach a stable 1e-5 mbar. We performed
a leak check and identify that the Ionisation
chamber gate valve is not totally tight,
  
Fixede748 Fri Jun 9 12:33:25 2017 AdrienMECHGeneral MUST2 positionAfter a the surveyor came we figured out the
MUST2 telescope are 1cm too high with respect
to the beam line.
  
Fixede748 Fri Jun 9 12:34:18 2017 AdrienDAQHardware HubWe are currentlky waiting for the hub to be
configured so we can start the MUST2 DAQ.
Should be done in the afternoon.
  
Fixede748 Fri Jun 9 12:35:46 2017 AdrienMUST2Hardware CsI trip on T6The detector were left on during the night.
T6 CsI trip and cannot be switch on again.
Once we established that all the MUFFEE works
  