Fixed, e748, Thu Jun 1 09:29:50 2017, Adrien Matta, MUST2, Hardware, , Telescope cabling debbug in G3
|
Test performed without vaccum, in the dark, cooling at 20.
[LIST]
|
Fixed, e748, Thu Jun 1 09:32:38 2017, Adrien Matta, MUST2, Hardware, , MUST2 cabling scheme
|
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.
Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.
|
Fixed, e748, Tue Jun 6 09:07:34 2017, Adrien Matta, BEAM, General, , Moving to D6
|
M2C Chamber now in D6 after a smooth ride, ready to be aligned. |
Fixed, e748, Sat Jun 17 10:22:43 2017, Adrien Matta, EXL, Hardware, , EXL ADC gate
|
EXL ADC is now setup with individual gate on the ADC.
We also put the threshold higher to reduce the rate and managed to work on timing.
|
Fixed, e748, Sat Jun 17 10:27:26 2017, Adrien Matta, ONLINE, Software, , Starting the GRU online analysis
|
We setup a script to start the right environment to run GRU, ganil2root and nptool.
The script is located in /home/muvi/e748 and can be accessed by just typing online in the terminal.
|
Fixed, e748, Sat Jun 17 10:32:25 2017, Adrien Matta, ONLINE, Software, , Online/Offline list of task
|
We need to do the following improvement to the online / offline environment:
[LIST]
|
Fixed, e748, Sat Jun 17 10:56:09 2017, Adrien Matta, BEAM, General, , JC Thomas plans for the beam production
|
Here are a few notes by Jean Charles about the expected LISE setting based on 2013 and 2014 16C tuning. |
Fixed, e748, Sun Jun 25 09:53:44 2017, Adrien Matta, RUN, General, 3-alpha, Run 18
|
Junk |
Fixed, e748, Sun Jun 25 09:54:08 2017, Adrien Matta, RUN, General, 3-alpha, Run 19
|
Source: 3-alpha + 60Co
Trigger: T1-8 or EXL |
Fixed, e748, Mon Jun 26 09:15:31 2017, Adrien Matta, RUN, General, 3-alpha, Run 19 : disk quota exceeded
|
Run 19 was still running this morning, but file stop writting at 6 O'Clock, when the disk quota exceeded (we wrtoe about 14Go of data, so not that much!) |
Fixed, e748, Sat Jul 1 09:27:46 2017, Adrien Matta, OTHER, General, N/A, SHIFT TABLE
|
|
Fixed, e748, Sat Jul 1 10:47:18 2017, Adrien Matta, BEAM, General, N/A, Primary beam energy measurement
|
PCP delivered the primary beam energy measurement |
Fixed, e748, Thu Jul 6 13:37:37 2017, Adrien Matta, OFFLINE, General, N/A, Energy loss table for d, 3He and 3H 20x
|
Here it is! |
Pinned, e744, Thu Mar 15 10:50:00 2018, Adrien Matta, MUST2, Hardware, , Distribution box LPC 8x
|
Cabling file by Fabien Naury (LPC). |
Fixed, e744, Tue Apr 17 09:07:55 2018, Adrien Matta, DAQ, General, N/A, DAQ issue summary
|
Previously on e744:
After a chat with Charles Houarner we decided to have configuration with a Muvi card per VXI crate. This is supposed to reduce the dead time (DT) by parallelising |
Fixed, e744, Fri May 25 08:37:04 2018, Adrien Matta, MUST2, Hardware, N/A, MUST2 cooling
|
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
|
Fixed, e748, Wed Jun 7 11:29:55 2017, Adrien, MECH, Hardware, N/A, Surveyor mesurement
|
The surveyor are carrying out the measurement of the detectors in D6.
The measurement should take the day, starting with the main plate, and then in the afternoon the detectors.
|
Fixed, e748, Fri Jun 9 12:30:49 2017, Adrien, VACUUM, Hardware, , Vacuum Leaks
|
We reach a stable 1e-5 mbar. We performed a leak check and identify that the Ionisation chamber gate valve is not totally tight, I don't think there is
much to be done.
One of the M2C flange also have a micro leak, that we will solve next tuesday when reopening the chamber.
|
Fixed, e748, Fri Jun 9 12:33:25 2017, Adrien, MECH, General, , MUST2 position
|
After a the surveyor came we figured out the MUST2 telescope are 1cm too high with respect to the beam line.
Vincent is preparing new feet to replace the one supporting the main plate. We will support the plate with adjustable one while replacing the other so
there is no need to dismount any detector.
|
Fixed, e748, Fri Jun 9 12:34:18 2017, Adrien, DAQ, Hardware, , Hub
|
We are currentlky waiting for the hub to be configured so we can start the MUST2 DAQ. Should be done in the afternoon. |
|