MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 47 of 48  Not logged in MUST2
Fixed, e748, Thu Jun 1 09:29:50 2017, Adrien Matta, MUST2, Hardware, , Telescope cabling debbug in G3 
Test performed without vaccum, in the dark, cooling at 20.

[LIST]
Fixed, e748, Thu Jun 1 09:32:38 2017, Adrien Matta, MUST2, Hardware, , MUST2 cabling scheme 
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.

Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.
Fixed, e748, Tue Jun 6 09:07:34 2017, Adrien Matta, BEAM, General, , Moving to D6 
M2C Chamber now in D6 after a smooth ride, ready to be aligned.
Fixed, e748, Sat Jun 17 10:22:43 2017, Adrien Matta, EXL, Hardware, , EXL ADC gate 
EXL ADC is now setup with individual gate on the ADC. 

We also put the threshold higher to reduce the rate and managed to work on timing.
Fixed, e748, Sat Jun 17 10:27:26 2017, Adrien Matta, ONLINE, Software, , Starting the GRU online analysis 
We setup a script to start the right environment to run GRU, ganil2root and nptool.

The script is located in /home/muvi/e748 and can be accessed by just typing online in the terminal.
Fixed, e748, Sat Jun 17 10:32:25 2017, Adrien Matta, ONLINE, Software, , Online/Offline list of task 
We need to do the following improvement to the online / offline environment:

[LIST]
Fixed, e748, Sat Jun 17 10:56:09 2017, Adrien Matta, BEAM, General, , JC Thomas plans for the beam production REX-E628.pdf
Here are a few notes by Jean Charles about the expected LISE setting based on 2013 and 2014 16C tuning.
Fixed, e748, Sun Jun 25 09:53:44 2017, Adrien Matta, RUN, General, 3-alpha, Run 18 
Junk
Fixed, e748, Sun Jun 25 09:54:08 2017, Adrien Matta, RUN, General, 3-alpha, Run 19  
Source: 3-alpha + 60Co
Trigger: T1-8 or EXL
Fixed, e748, Mon Jun 26 09:15:31 2017, Adrien Matta, RUN, General, 3-alpha, Run 19 : disk quota exceeded 
Run 19 was still running this morning, but file stop writting at 6 O'Clock, when the disk quota exceeded (we wrtoe about 14Go of data, so not that much!)
Fixed, e748, Sat Jul 1 09:27:46 2017, Adrien Matta, OTHER, General, N/A, SHIFT TABLE 
 
Fixed, e748, Sat Jul 1 10:47:18 2017, Adrien Matta, BEAM, General, N/A, Primary beam energy measurement IMG_1984.JPG
PCP delivered the primary beam energy measurement
Fixed, e748, Thu Jul 6 13:37:37 2017, Adrien Matta, OFFLINE, General, N/A, Energy loss table for d, 3He and 3H 20x
Here it is!
Pinned, e744, Thu Mar 15 10:50:00 2018, Adrien Matta, MUST2, Hardware, , Distribution box LPC 8x
Cabling file by Fabien Naury (LPC).
Fixed, e744, Tue Apr 17 09:07:55 2018, Adrien Matta, DAQ, General, N/A, DAQ issue summary 
Previously on e744:

After a chat with Charles Houarner we decided to have configuration with a Muvi card per VXI crate. This is supposed to reduce the dead time (DT) by parallelising
Fixed, e744, Fri May 25 08:37:04 2018, Adrien Matta, MUST2, Hardware, N/A, MUST2 cooling 
Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both coolers at -5C.
Time of operation 8h35.
Fixed, e748, Wed Jun 7 11:29:55 2017, Adrien, MECH, Hardware, N/A, Surveyor mesurement 
The surveyor are carrying out the measurement of the detectors in D6.
The measurement should take the day, starting with the main plate, and then in the afternoon the detectors.
Fixed, e748, Fri Jun 9 12:30:49 2017, Adrien, VACUUM, Hardware, , Vacuum Leaks 
We reach a stable 1e-5 mbar. We performed a leak check and identify that the Ionisation chamber gate valve is not totally tight, I don't think there is
much to be done.
One of the M2C flange also have a micro leak, that we will solve next tuesday when reopening the chamber.
Fixed, e748, Fri Jun 9 12:33:25 2017, Adrien, MECH, General, , MUST2 position 
After a the surveyor came we figured out the MUST2 telescope are 1cm too high with respect to the beam line.
Vincent is preparing new feet to replace the one supporting the main plate. We will support the plate with adjustable one while replacing the other so
there is no need to dismount any detector.
Fixed, e748, Fri Jun 9 12:34:18 2017, Adrien, DAQ, Hardware, , Hub 
We are currentlky waiting for the hub to be configured so we can start the MUST2 DAQ. Should be done in the afternoon.

ELOG Home Page