Fixed | e748 |
Thu Jun 1 09:29:50 2017 |
Adrien Matta | MUST2 | Hardware | | Telescope cabling debbug in G3 | Test performed without vaccum, in the dark,
cooling at 20.
|
|
Fixed | e748 |
Thu Jun 1 09:32:38 2017 |
Adrien Matta | MUST2 | Hardware | | MUST2 cabling scheme | The MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
|
|
Fixed | e748 |
Tue Jun 6 09:07:34 2017 |
Adrien Matta | BEAM | General | | Moving to D6 | M2C Chamber now in D6 after a smooth ride,
ready to be aligned. |
|
Fixed | e748 |
Sat Jun 17 10:22:43 2017 |
Adrien Matta | EXL | Hardware | | EXL ADC gate | EXL ADC is now setup with individual gate
on the ADC.
|
|
Fixed | e748 |
Sat Jun 17 10:27:26 2017 |
Adrien Matta | ONLINE | Software | | Starting the GRU online analysis | We setup a script to start the right environment
to run GRU, ganil2root and nptool.
|
|
Fixed | e748 |
Sat Jun 17 10:32:25 2017 |
Adrien Matta | ONLINE | Software | | Online/Offline list of task | We need to do the following improvement to
the online / offline environment:
|
|
Fixed | e748 |
Sat Jun 17 10:56:09 2017 |
Adrien Matta | BEAM | General | | JC Thomas plans for the beam production | Here are a few notes by Jean Charles about
the expected LISE setting based on 2013 and
2014 16C tuning. |
|
Fixed | e748 |
Sun Jun 25 09:53:44 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 18 | Junk |
|
Fixed | e748 |
Sun Jun 25 09:54:08 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 19 | Source: 3-alpha + 60Co
Trigger: T1-8 or EXL |
|
Fixed | e748 |
Mon Jun 26 09:15:31 2017 |
Adrien Matta | RUN | General | 3-alpha | Run 19 : disk quota exceeded | Run 19 was still running this morning, but
file stop writting at 6 O'Clock, when the
disk quota exceeded (we wrtoe about 14Go |
|
Fixed | e748 |
Sat Jul 1 09:27:46 2017 |
Adrien Matta | OTHER | General | N/A | SHIFT TABLE | |
|
Fixed | e748 |
Sat Jul 1 10:47:18 2017 |
Adrien Matta | BEAM | General | N/A | Primary beam energy measurement | PCP delivered the primary beam energy measurement |
|
Fixed | e748 |
Thu Jul 6 13:37:37 2017 |
Adrien Matta | OFFLINE | General | N/A | Energy loss table for d, 3He and 3H | Here it is! |
20x |
Pinned | e744 |
Thu Mar 15 10:50:00 2018 |
Adrien Matta | MUST2 | Hardware | | Distribution box LPC | Cabling file by Fabien Naury (LPC). |
8x |
Fixed | e744 |
Tue Apr 17 09:07:55 2018 |
Adrien Matta | DAQ | General | N/A | DAQ issue summary | Previously on e744:
After a chat with Charles Houarner we decided |
|
Fixed | e744 |
Fri May 25 08:37:04 2018 |
Adrien Matta | MUST2 | Hardware | N/A | MUST2 cooling | Vacuum at 1.7 e-5 torr this morning.
I started the MUST2 cooling, setting both
coolers at -5C.
|
|
Fixed | e748 |
Wed Jun 7 11:29:55 2017 |
Adrien | MECH | Hardware | N/A | Surveyor mesurement | The surveyor are carrying out the measurement
of the detectors in D6.
The measurement should take the day, starting |
|
Fixed | e748 |
Fri Jun 9 12:30:49 2017 |
Adrien | VACUUM | Hardware | | Vacuum Leaks | We reach a stable 1e-5 mbar. We performed
a leak check and identify that the Ionisation
chamber gate valve is not totally tight, |
|
Fixed | e748 |
Fri Jun 9 12:33:25 2017 |
Adrien | MECH | General | | MUST2 position | After a the surveyor came we figured out the
MUST2 telescope are 1cm too high with respect
to the beam line.
|
|
Fixed | e748 |
Fri Jun 9 12:34:18 2017 |
Adrien | DAQ | Hardware | | Hub | We are currentlky waiting for the hub to be
configured so we can start the MUST2 DAQ.
Should be done in the afternoon. |
|