Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e738 |
Sun Jul 15 08:04:12 2018 |
daisuke | RUN | General | Cryo-empty | RUN 397 |
9C + empty.
08h00 start. 12C 1.8 micro A.
cats1 670.0 V 1.00 uA 670.1 V 0.12 uA
cats2 650.0 V 1.50 uA 650.1 V 0.10 uA
9h59 stop |
Attachment 1: scaler_2018-07-15_08h04m37s.png
|
|
Attachment 2: scaler_2018-07-15_08h46m31s.png
|
|
Attachment 3: visu_2018-07-15_08h46m41s.png
|
|
Attachment 4: visu_2018-07-15_08h46m44s.png
|
|
Attachment 5: visu_2018-07-15_08h46m46s.png
|
|
Attachment 6: visu_2018-07-15_08h46m48s.png
|
|
Attachment 7: visu_2018-07-15_08h46m51s.png
|
|
Attachment 8: visu_2018-07-15_08h46m54s.png
|
|
Attachment 9: visu_2018-07-15_08h46m57s.png
|
|
Attachment 10: visu_2018-07-15_08h47m00s.png
|
|
Attachment 11: visu_2018-07-15_08h47m05s.png
|
|
Attachment 12: visu_2018-07-15_08h47m08s.png
|
|
Attachment 13: visu_2018-07-15_08h47m13s.png
|
|
Attachment 14: visu_2018-07-15_08h47m16s.png
|
|
Attachment 15: visu_2018-07-15_08h47m22s.png
|
|
Attachment 16: visu_2018-07-15_08h47m26s.png
|
|
Attachment 17: visu_2018-07-15_08h47m29s.png
|
|
Attachment 18: visu_2018-07-15_08h47m32s.png
|
|
Attachment 19: visu_2018-07-15_08h47m35s.png
|
|
Attachment 20: visu_2018-07-15_08h47m38s.png
|
|
Attachment 21: visu_2018-07-15_08h47m41s.png
|
|
Attachment 22: visu_2018-07-15_08h47m45s.png
|
|
Attachment 23: visu_2018-07-15_08h47m48s.png
|
|
Attachment 24: visu_2018-07-15_08h47m51s.png
|
|
Attachment 25: visu_2018-07-15_08h47m55s.png
|
|
Attachment 26: visu_2018-07-15_08h47m59s.png
|
|
Attachment 27: visu_2018-07-15_08h48m03s.png
|
|
Attachment 28: scaler_2018-07-15_09h14m15s.png
|
|
Attachment 29: scaler_2018-07-15_10h01m00s.png
|
|
Attachment 30: visu_2018-07-15_10h01m05s.png
|
|
Attachment 31: visu_2018-07-15_10h01m10s.png
|
|
Attachment 32: visu_2018-07-15_10h01m15s.png
|
|
Fixed | e738 |
Sun Jul 15 10:04:13 2018 |
daisuke | RUN | General | Cryo-empty | RUN 398 |
9Cc + empty
10h01 start
cats1 670.0 V 1.00 uA 670.1 V 0.12 uA
cats2 650.0 V 1.50 uA 650.1 V 0.10 uA
10h05 stop. TCP time out. Cannot start run. |
Attachment 1: scaler_2018-07-15_10h05m09s.png
|
|
Fixed | e738 |
Sun Jul 15 13:57:59 2018 |
daisuke | RUN | General | Cryo-empty | RUN 415 |
9C + empty run.
From 10 to 13h45, we had several issues with DAQ. All data from RUN 398 to 414 are JUNK.
13h47 start
18h00 stop
End of the campaign. |
Attachment 1: scaler_2018-07-15_13h55m17s.png
|
|
Attachment 2: screenshot_2018-07-15_13h55m50s.png
|
|
Attachment 3: visu_2018-07-15_13h56m18s.png
|
|
Attachment 4: visu_2018-07-15_13h56m21s.png
|
|
Attachment 5: visu_2018-07-15_13h56m23s.png
|
|
Attachment 6: visu_2018-07-15_13h56m27s.png
|
|
Attachment 7: visu_2018-07-15_13h56m29s.png
|
|
Attachment 8: visu_2018-07-15_13h56m31s.png
|
|
Attachment 9: visu_2018-07-15_13h56m34s.png
|
|
Attachment 10: visu_2018-07-15_13h56m39s.png
|
|
Attachment 11: visu_2018-07-15_13h56m41s.png
|
|
Attachment 12: visu_2018-07-15_13h56m44s.png
|
|
Attachment 13: visu_2018-07-15_13h56m47s.png
|
|
Attachment 14: visu_2018-07-15_13h56m49s.png
|
|
Attachment 15: visu_2018-07-15_13h56m54s.png
|
|
Attachment 16: visu_2018-07-15_13h56m49s.png
|
|
Attachment 17: visu_2018-07-15_13h56m54s.png
|
|
Attachment 18: scaler_2018-07-15_14h08m27s.png
|
|
Attachment 19: visu_2018-07-15_14h08m29s.png
|
|
Attachment 20: visu_2018-07-15_14h08m48s.png
|
|
Attachment 21: scaler_2018-07-15_15h18m48s.png
|
|
Attachment 22: scaler_2018-07-15_15h49m45s.png
|
|
Attachment 23: visu_2018-07-15_15h49m49s.png
|
|
Attachment 24: visu_2018-07-15_15h49m52s.png
|
|
Attachment 25: visu_2018-07-15_15h49m59s.png
|
|
Attachment 26: visu_2018-07-15_15h50m05s.png
|
|
Attachment 27: scaler_2018-07-15_16h32m38s.png
|
|
Attachment 28: visu_2018-07-15_16h32m39s.png
|
|
Attachment 29: visu_2018-07-15_16h32m47s.png
|
|
Attachment 30: visu_2018-07-15_16h32m50s.png
|
|
Attachment 31: scaler_2018-07-15_17h10m06s.png
|
|
Attachment 32: visu_2018-07-15_17h10m06s.png
|
|
Attachment 33: visu_2018-07-15_17h10m15s.png
|
|
Attachment 34: scaler_2018-07-15_18h02m12s.png
|
|
Fixed | e738 |
Mon Jul 16 15:13:21 2018 |
daisuke | RUN | General | 3-alpha | RUN 419 |
MUST2 3 alpha source at center
13h22 start
15h05 stop. |
Attachment 1: visu_2018-07-16_14h58m37s.png
|
|
Attachment 2: visu_2018-07-16_14h58m45s.png
|
|
Attachment 3: visu_2018-07-16_14h58m55s.png
|
|
Fixed | e738 |
Mon Jul 16 16:13:00 2018 |
daisuke | RUN | General | 3-alpha | RUN 420 |
MUST2 3 alpha shooting a bit left
15h10-16h08 |
Attachment 1: scaler_2018-07-16_16h10m10s.png
|
|
Attachment 2: visu_2018-07-16_16h09m59s.png
|
|
Attachment 3: visu_2018-07-16_16h10m02s.png
|
|
Attachment 4: visu_2018-07-16_16h10m05s.png
|
|
Fixed | e738 |
Mon Jul 16 16:44:43 2018 |
daisuke | RUN | General | 3-alpha | RUN 422 |
MUST2 + 3 alpha shooting left |
Attachment 1: visu_2018-07-16_16h32m59s.png
|
|
Fixed | e738 |
Mon Jul 16 17:25:22 2018 |
daisuke | RUN | General | 3-alpha | RUN 422 |
MUST2 + 3 alpha shooting right. |
Attachment 1: visu_2018-07-16_17h22m02s.png
|
|
Attachment 2: visu_2018-07-16_17h05m26s.png
|
|
Attachment 3: scaler_2018-07-16_17h22m04s.png
|
|
Fixed | e738 |
Mon Jul 16 18:46:34 2018 |
daisuke | RUN | General | 3-alpha | RUN 423 |
MUST2 + 3 alpha shooting center. |
Attachment 1: scaler_2018-07-16_18h40m56s.png
|
|
Attachment 2: visu_2018-07-16_18h03m27s.png
|
|
Attachment 3: visu_2018-07-16_18h39m46s.png
|
|
Attachment 4: visu_2018-07-16_18h39m49s.png
|
|
Fixed | e748 |
Tue Jul 4 05:01:21 2017 |
Yorick | RUN | General | CD2 | Runs 248-250 |
These are long runs with CD2
MUST8 is in GMT 15.
Missing Times: T7 X and Y; T5 Y.
Beam is very stable at 2.8 micro. |
Fixed | e744 |
Wed May 30 00:17:02 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2114 |
RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Evening shift team: Louis Valérie (Online)
Beam intensity around 10**5 pps decreasing to 80-70k pps around 1h30 then coming again to 95k pps at 1h40
Between 2h48 and 2h50 beam was decresaing down to few 1000/s on CATS, due to some alarms on the beam line, slowly increasing again after 2h52.
cf current of T4 around 13-14 µA Strong increase around 13 µA (due to the stabilization of the beam rate at 10**5 pps !)
------------------------------------------------------------------------------------------------------------------------------------------
NB: The E_TOF plots for MM1 and MM3 seem to count less than the MM2 and MM4 plots, nearly factor 10 below for MM1, and factor 5 below for MM3.
But the raw spectra for StrXT of MM1 and MM3 have quite the same statistics (see integral values) maybe some software problems.
Check how the TOF parameter is done in the offline (from XT or YT +thresholds and pattern conditions).
The same behaviour was seen in the previous runs. |
Attachment 1: Run2114_initScalers.png
|
|
Attachment 2: Run2114_MMimpactAT1h42.png
|
|
Attachment 3: Run2114_EXLCsIcorrelPPT_QTfag.png
|
|
Attachment 4: Run2114_TimingRefFAGppt.png
|
|
Attachment 5: Run2114_MMStrXT.png
|
|
Attachment 6: Run2114_MMStrYT.png
|
|
Attachment 7: Run2114_ETOFmm1toMM4.png
|
|
Attachment 8: Run2114_scalersEndRun.png
|
|
Fixed | e744 |
Wed May 30 01:15:58 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2115 |
Since 2h58 : WAITING FOR THE BEAM TO START THE RUN
RUN #2115 30 mai 2018 start @ 03h20; stop @ 4h56
END OF THE RUN because there is an alarm related to a potential water leakage in the D3-D6 equipments. see next entry.
PCP will make a survey and enter to check the Qpole all off. We put the Wien filter off.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Night shift team: Louis, Valérie
Beam intensity recovered around 70k-90k pps at 3h37
Again down at 300 pps at 3h30 due to the loss of the "HyperPi" of the source (hummm we should ask experts about the meaning cf JCT)
cf current of T4 around 15 µA (at 3h15 without beam; same at 3h20 with beam), increasing during the run, 16 µA see Run2115_HVMust2At3h50.png
cf small rate at the beginning, cf Run2115_scalersInit.png
max around 91k pps at 3h27, cf Run2115_scalersAt3h27.png
------------------------------------------------------------------------------------------------------------------------------------------ |
Attachment 1: Run2115_scalersInit.png
|
|
Attachment 2: Run2115_scalersAt3h27.png
|
|
Attachment 3: Run2115_HVMust2At3h50.png
|
|
Attachment 4: Run2115_scalersEnd.png
|
|
Attachment 5: Run2115_MMimpact.png
|
|
Attachment 6: Run2115TriggerU2M.png
|
|
Ongoing | e744 |
Wed May 30 03:09:09 2018 |
Valérie, Louis | RUN | General | CH2 | BEAM LINE PROBLEMS, alarm "water leakage" |
The beam was stopped at 4h56, due to the alarm of "water leakage" on equipments, indicated in the D6 area.
All QPole in D6 were automatically put to 0.
Wien filter and DAP were put OFF to stop the beam and enter in the D6 area.
Between 5h and 5h30 PCP investigated the problem along the D3 and D6 areas, to check the water leakage problem indicated by the control command messages.
Since the problem could not be solved directly on the command boxes in PCP, it was not possible to put again the values on the QPoles.
then the area astreinte, Sébastien Le Moal, was called at 5h40.
At 6h15, he investigated the problem and check the cables in the D6 area. He saw some water condensation around the cable surveyor of the equipment (located behind the cooling system of MUST2).
Night/morning shift team: Louis Valérie.
[NB: in order to let them end up their night quietly, we will call later on the LISE experts for the beam line checking once the Qpoles are ready to put ON again.]
The T4 was increasing, from 16µA at 5h, then around 17 µA at 5h40 (see snapshot HT_MUST2_Wed30May_At5h52.png) we decided to put it OFF to let it end the night quietly.
|
Attachment 1: HT_MUST2_Wed30May_At5h52.png
|
|
Fixed | e744 |
Thu May 24 17:23:57 2018 |
Valérie for Calimero team: Valérian, Louis | MUST2 | General | N/A | CALIMERO Runs 453-457 OK |
Calimero on ganp1074 in D6
Time Calibrator Range: 640 ns; Period 20 ns Amplitude of pulser (test generator) 9MeV
Run 453 Telescope T5 (MUVI2-slave) XT see plot
Run 454 Telescope T5 (MUVI2-slave) YT blocked at 6% -->
NB: stop calimero, stop run, stop geco, load das (to have good config for Mate), reload Geco
(usual steps: Restart Calimero programs, start Run control, start Calimero in geco)
Run 455 Telescope T5 (MUVI2-slave) YT ok
Then stop Run, exit from Geco, load DAS, change configuration for T1 to T4.
Change configuration of Port in RCC Narval. see plot
Run 456 Telescopes T1 to T4 (MUVI1-Master) XT ok see plot
Run 457 Telescopes T1 to T4 (MUVI1-Master) YT ok see plot |
Attachment 1: PlotCalimrun453XT5thr1MeVtrue.png
|
|
Attachment 2: PlotCalimrun454XYT5thr1MeVtrue.png
|
|
Attachment 3: PlotCalimrun455YT5thr1MeVtrue.png
|
|
Attachment 4: PlotCalimrun455YT5thr1MeVtrueOk.png
|
|
Attachment 5: ConfigCalimeroPortSlaveT5.png
|
|
Attachment 6: ConfigCalimeroPortMasterT1toT4muvi.png
|
|
Attachment 7: ConfigGECOcalimT1thr1MeV.png
|
|
Attachment 8: PlotCalimXT1to4Run456thr1MeV.png
|
|
Attachment 9: PlotCalimXT1to4Run456thr1MeVcalim31%.png
|
|
Attachment 10: PlotCalimXT3Run456thr1MeVprojch9.png
|
|
Attachment 11: PlotCalimXT1Run456thr1MeVprojch51.png
|
|
Attachment 12: PlotCalimXT1toT4Run456thr1MeVall.png
|
|
Attachment 13: PlotCalimYT1toT4Run457thr1MeVproj66.png
|
|
Attachment 14: ConfigCalimYT1toT4Run457thr1MeV.png
|
|
Attachment 15: PlotCalimYT2Run457thr1MeVproj83.png
|
|
Attachment 16: PlotCalimYT1toT4Run457thr1MeVall.png
|
|
Fixed | e744 |
Thu May 24 17:18:58 2018 |
Valérie for Calimero team : Valérian, Louis | MUST2 | General | N/A | CALIMERO Tests Runs 451 to 452 (done in D6) |
Test runs for telescopes T1 to t4
Nb: The applied threshold is now 1 MeV but it seems to be not the case when we look at the spectra.
Maybe a problem of the read configuration in GECO.
Run 451 XT Pulser amplitude 9 MeV
Run 452 YT
NB: good configuration files are given in the next entry
See Notes signed by Valérie, checked by the team ! |
Attachment 1: configCalimeroRun452YTthr1MeV.png
|
|
Attachment 2: PlotCalimrun452YTthr1MeVmaybe.png
|
|
Attachment 3: PlotCalimrun453YT5thr1MeVtrue.png
|
|
Fixed | e744 |
Thu May 24 12:01:54 2018 |
Valérie for Calimero team - Valérian, Fairouz | MUST2 | General | | Bug server Calimero Run #447-449 |
Calimero on ganp161
Telscopes T1 to T4 thresholds for T1 to T3 400 keV ; T4 : 1 MeV
ampli pulser 12 MeV
problem: stop calimero at 6%
Bad connection. |
Attachment 1: VigruCalimerostartXT.png
|
|
Attachment 2: configCalimeroOnGeco.png
|
|
Attachment 3: GECOOnrunCalimeroConfig.png
|
|
Attachment 4: startcalimeroNarvalRCCstart.png
|
|
Attachment 5: startcalimeroWindowGECO.png
|
|
Attachment 6: startcalimeroProgOnganp161.png
|
|
Attachment 7: startGecoREADHardware.png
|
|
Attachment 8: startGecoOnGanp161off.png
|
|
Attachment 9: startGecoOnGanp161ok.png
|
|
Attachment 10: RuncontrolstopbeforeCalim.png
|
|
Attachment 11: startPAforGECOonGanp161.png
|
|
Attachment 12: ConfigCalimeroMM2piedNosuppress.png
|
|
Fixed | e738 |
Mon Jul 9 18:03:48 2018 |
Valérie Louis | RUN | General | Cryo-LH2 | RUN 312 |
Run 312
First RUN of 9C on filled LH2 target
start: 17h36 stop: 18h56
Beam: 9C
target: filled
Trigger: T1 to T8, CATS1%3*10⁴, CATS2%3*10⁴, PLASTIC%1*10⁴
I=1.4*10pps in CATS1
Purity = 5.1%
HV of DC wire has been changed from 500V to 530V
Plastic threshold has been changed from 180mV to 70mV
Target has been succefully filled |
Attachment 1: scaler_2018-07-09_17h59m44s.png
|
|
Attachment 2: visu_2018-07-09_17h56m50s.png
|
|
Attachment 3: visu_2018-07-09_17h57m49s.png
|
|
Attachment 4: visu_2018-07-09_17h57m52s.png
|
|
Attachment 5: visu_2018-07-09_17h57m55s.png
|
|
Attachment 6: visu_2018-07-09_17h57m57s.png
|
|
Attachment 7: visu_2018-07-09_17h57m59s.png
|
|
Attachment 8: visu_2018-07-09_17h58m02s.png
|
|
Attachment 9: visu_2018-07-09_17h58m05s.png
|
|
Attachment 10: visu_2018-07-09_17h58m12s.png
|
|
Attachment 11: visu_2018-07-09_17h58m15s.png
|
|
Attachment 12: visu_2018-07-09_17h58m17s.png
|
|
Attachment 13: visu_2018-07-09_17h58m19s.png
|
|
Attachment 14: visu_2018-07-09_17h58m22s.png
|
|
Attachment 15: visu_2018-07-09_17h58m24s.png
|
|
Attachment 16: visu_2018-07-09_17h58m33s.png
|
|
Attachment 17: visu_2018-07-09_17h58m37s.png
|
|
Attachment 18: visu_2018-07-09_17h58m40s.png
|
|
Attachment 19: visu_2018-07-09_17h58m57s.png
|
|
Attachment 20: visu_2018-07-09_17h59m01s.png
|
|
Attachment 21: visu_2018-07-09_17h59m05s.png
|
|
Attachment 22: visu_2018-07-09_17h59m07s.png
|
|
Attachment 23: visu_2018-07-09_17h59m34s.png
|
|
Attachment 24: visu_2018-07-09_17h59m42s.png
|
|
Attachment 25: scaler_STOP_2018-07-09_18h57m35s.png
|
|
Fixed | e748 |
Thu Jun 8 18:57:14 2017 |
Valérie Lapoux | MUST2 | Hardware | | Currents and Voltages on MUST2 |
Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature at -5°C.
Low voltages and HV ON
MUST2 "nominal" voltages and currents:
-----------------------------------------------------
DSSD T1 pcb5 80V ; ~1.7 µA | CsI 50V (~nA)
-----------------------------------------------------
DSSD T2 pcb9 80V ; ~1.4 µA | CsI 50V
-----------------------------------------------------
DSSD T3 pcb7 70V ; ~1. µA | CsI 50V
-----------------------------------------------------
DSSD T4 pcb11 80V ; ~1. µA | CsI 50V
--------------------------------------------------------------------
DSSD T5 pcb6 80V ; ~ 0.4 µA | SiLiT5-1 700V 10.72 µA ; SiLiT5-2 700V 2.16µA
--------------------------------------------------------------------
DSSD T6 pcb10 80V ; ~1.7 µA | CsI 50V
-----------------------------------------------------------
DSSD T7 pcb3 80V ; ~1.7 µA | CsI 50V
--------------------------------------------------------------------
DSSD T8 pcb2 60V ; ~1.7 µA | SiLiT8-1 700V 2.46 µA | SiLiT8-2 600V 3.4 µA
-------------------------------------------------------------------- |
Pinned | e748 |
Fri Jun 9 15:49:46 2017 |
Valérie Lapoux | MUST2 | Hardware | | MUST2 configuration |
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file. |
Attachment 1: Confige748MUST2alimHVandLV.pdf
|
|
Attachment 2: préparationMUST2forE748.pdf
|
|
Pinned | e748 |
Fri Jun 9 15:51:44 2017 |
Valérie Lapoux | MUST2 | Hardware | | General Trigger GMT for MUST2 electronics |
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file. |
Attachment 1: DaqElectronicsMUST2gmtforE748.pdf
|
|
Fixed | e748 |
Mon Jun 12 22:48:45 2017 |
Valérie Lapoux | MUST2 | General | | Tests of the DAQ with the Alpha Source |
12Th June. 3-peak Alpha source rotated towards the telescopes MM1 to MM4 (square wall of 4 telescopes).
MUVI configurations are fixed on the DAS. See pictures below. Thresholds : 402 keV.
We have DAS error messages for telescopes T2 and T7 with problems of data transmission, "I2C errors" = logic signals problems, maybe due to
bad cable connection inside the reaction chamber.
This problem should be fixed on 13th June looking at the cables in the chamber.
GMT trigger configuration: see picture, all telescopes T1 T3 T4 T5, T6 and T8.
T2 and T7 not included in the trigger inputs.
FAG window : 500 ns; Validation width 5.0 µs.
We can see the three peaks on the telescopes T1 T3 and T4 which are in the trigger (spectra taken during 30 minutes for checking).
T6 (in the trigger also) is placed at 90 deg and it can detect also some alphas. |
Attachment 1: GMTconfig12juin.png
|
|
Attachment 2: GMTconfigSourceAlpha.png
|
|
Attachment 3: ConfigCAStel1Muvi1.png
|
|
Attachment 4: DASmuvi1config.png
|
|
Attachment 5: ConfigPhysMuvi1Cas1Thresh.png
|
|
Attachment 6: MM1to4stripYsrcAlpha.png
|
|
Attachment 7: SpectresAlpha_12juin.png
|
|
Attachment 8: SetUpMateGainShaper.png
|
|