Fixede738 Sun Jul 15 08:04:12 2018 daisukeRUNGeneralCryo-emptyRUN 397
9C + empty.

08h00 start. 12C 1.8 micro A.

cats1 670.0 V 1.00 uA 670.1 V 0.12 uA
cats2 650.0 V 1.50 uA 650.1 V 0.10 uA

9h59 stop
Attachment 1: scaler_2018-07-15_08h04m37s.png
scaler_2018-07-15_08h04m37s.png
Attachment 2: scaler_2018-07-15_08h46m31s.png
scaler_2018-07-15_08h46m31s.png
Attachment 3: visu_2018-07-15_08h46m41s.png
visu_2018-07-15_08h46m41s.png
Attachment 4: visu_2018-07-15_08h46m44s.png
visu_2018-07-15_08h46m44s.png
Attachment 5: visu_2018-07-15_08h46m46s.png
visu_2018-07-15_08h46m46s.png
Attachment 6: visu_2018-07-15_08h46m48s.png
visu_2018-07-15_08h46m48s.png
Attachment 7: visu_2018-07-15_08h46m51s.png
visu_2018-07-15_08h46m51s.png
Attachment 8: visu_2018-07-15_08h46m54s.png
visu_2018-07-15_08h46m54s.png
Attachment 9: visu_2018-07-15_08h46m57s.png
visu_2018-07-15_08h46m57s.png
Attachment 10: visu_2018-07-15_08h47m00s.png
visu_2018-07-15_08h47m00s.png
Attachment 11: visu_2018-07-15_08h47m05s.png
visu_2018-07-15_08h47m05s.png
Attachment 12: visu_2018-07-15_08h47m08s.png
visu_2018-07-15_08h47m08s.png
Attachment 13: visu_2018-07-15_08h47m13s.png
visu_2018-07-15_08h47m13s.png
Attachment 14: visu_2018-07-15_08h47m16s.png
visu_2018-07-15_08h47m16s.png
Attachment 15: visu_2018-07-15_08h47m22s.png
visu_2018-07-15_08h47m22s.png
Attachment 16: visu_2018-07-15_08h47m26s.png
visu_2018-07-15_08h47m26s.png
Attachment 17: visu_2018-07-15_08h47m29s.png
visu_2018-07-15_08h47m29s.png
Attachment 18: visu_2018-07-15_08h47m32s.png
visu_2018-07-15_08h47m32s.png
Attachment 19: visu_2018-07-15_08h47m35s.png
visu_2018-07-15_08h47m35s.png
Attachment 20: visu_2018-07-15_08h47m38s.png
visu_2018-07-15_08h47m38s.png
Attachment 21: visu_2018-07-15_08h47m41s.png
visu_2018-07-15_08h47m41s.png
Attachment 22: visu_2018-07-15_08h47m45s.png
visu_2018-07-15_08h47m45s.png
Attachment 23: visu_2018-07-15_08h47m48s.png
visu_2018-07-15_08h47m48s.png
Attachment 24: visu_2018-07-15_08h47m51s.png
visu_2018-07-15_08h47m51s.png
Attachment 25: visu_2018-07-15_08h47m55s.png
visu_2018-07-15_08h47m55s.png
Attachment 26: visu_2018-07-15_08h47m59s.png
visu_2018-07-15_08h47m59s.png
Attachment 27: visu_2018-07-15_08h48m03s.png
visu_2018-07-15_08h48m03s.png
Attachment 28: scaler_2018-07-15_09h14m15s.png
scaler_2018-07-15_09h14m15s.png
Attachment 29: scaler_2018-07-15_10h01m00s.png
scaler_2018-07-15_10h01m00s.png
Attachment 30: visu_2018-07-15_10h01m05s.png
visu_2018-07-15_10h01m05s.png
Attachment 31: visu_2018-07-15_10h01m10s.png
visu_2018-07-15_10h01m10s.png
Attachment 32: visu_2018-07-15_10h01m15s.png
visu_2018-07-15_10h01m15s.png
Fixede738 Sun Jul 15 10:04:13 2018 daisukeRUNGeneralCryo-emptyRUN 398
9Cc + empty

10h01 start

cats1 670.0 V 1.00 uA 670.1 V 0.12 uA
cats2 650.0 V 1.50 uA 650.1 V 0.10 uA

10h05 stop. TCP time out. Cannot start run.
Attachment 1: scaler_2018-07-15_10h05m09s.png
scaler_2018-07-15_10h05m09s.png
Fixede738 Sun Jul 15 13:57:59 2018 daisukeRUNGeneralCryo-emptyRUN 415
9C + empty run.

From 10 to 13h45, we had several issues with DAQ. All data from RUN 398 to 414 are JUNK.

13h47 start
18h00 stop

End of the campaign.
Attachment 1: scaler_2018-07-15_13h55m17s.png
scaler_2018-07-15_13h55m17s.png
Attachment 2: screenshot_2018-07-15_13h55m50s.png
screenshot_2018-07-15_13h55m50s.png
Attachment 3: visu_2018-07-15_13h56m18s.png
visu_2018-07-15_13h56m18s.png
Attachment 4: visu_2018-07-15_13h56m21s.png
visu_2018-07-15_13h56m21s.png
Attachment 5: visu_2018-07-15_13h56m23s.png
visu_2018-07-15_13h56m23s.png
Attachment 6: visu_2018-07-15_13h56m27s.png
visu_2018-07-15_13h56m27s.png
Attachment 7: visu_2018-07-15_13h56m29s.png
visu_2018-07-15_13h56m29s.png
Attachment 8: visu_2018-07-15_13h56m31s.png
visu_2018-07-15_13h56m31s.png
Attachment 9: visu_2018-07-15_13h56m34s.png
visu_2018-07-15_13h56m34s.png
Attachment 10: visu_2018-07-15_13h56m39s.png
visu_2018-07-15_13h56m39s.png
Attachment 11: visu_2018-07-15_13h56m41s.png
visu_2018-07-15_13h56m41s.png
Attachment 12: visu_2018-07-15_13h56m44s.png
visu_2018-07-15_13h56m44s.png
Attachment 13: visu_2018-07-15_13h56m47s.png
visu_2018-07-15_13h56m47s.png
Attachment 14: visu_2018-07-15_13h56m49s.png
visu_2018-07-15_13h56m49s.png
Attachment 15: visu_2018-07-15_13h56m54s.png
visu_2018-07-15_13h56m54s.png
Attachment 16: visu_2018-07-15_13h56m49s.png
visu_2018-07-15_13h56m49s.png
Attachment 17: visu_2018-07-15_13h56m54s.png
visu_2018-07-15_13h56m54s.png
Attachment 18: scaler_2018-07-15_14h08m27s.png
scaler_2018-07-15_14h08m27s.png
Attachment 19: visu_2018-07-15_14h08m29s.png
visu_2018-07-15_14h08m29s.png
Attachment 20: visu_2018-07-15_14h08m48s.png
visu_2018-07-15_14h08m48s.png
Attachment 21: scaler_2018-07-15_15h18m48s.png
scaler_2018-07-15_15h18m48s.png
Attachment 22: scaler_2018-07-15_15h49m45s.png
scaler_2018-07-15_15h49m45s.png
Attachment 23: visu_2018-07-15_15h49m49s.png
visu_2018-07-15_15h49m49s.png
Attachment 24: visu_2018-07-15_15h49m52s.png
visu_2018-07-15_15h49m52s.png
Attachment 25: visu_2018-07-15_15h49m59s.png
visu_2018-07-15_15h49m59s.png
Attachment 26: visu_2018-07-15_15h50m05s.png
visu_2018-07-15_15h50m05s.png
Attachment 27: scaler_2018-07-15_16h32m38s.png
scaler_2018-07-15_16h32m38s.png
Attachment 28: visu_2018-07-15_16h32m39s.png
visu_2018-07-15_16h32m39s.png
Attachment 29: visu_2018-07-15_16h32m47s.png
visu_2018-07-15_16h32m47s.png
Attachment 30: visu_2018-07-15_16h32m50s.png
visu_2018-07-15_16h32m50s.png
Attachment 31: scaler_2018-07-15_17h10m06s.png
scaler_2018-07-15_17h10m06s.png
Attachment 32: visu_2018-07-15_17h10m06s.png
visu_2018-07-15_17h10m06s.png
Attachment 33: visu_2018-07-15_17h10m15s.png
visu_2018-07-15_17h10m15s.png
Attachment 34: scaler_2018-07-15_18h02m12s.png
scaler_2018-07-15_18h02m12s.png
Fixede738 Mon Jul 16 15:13:21 2018 daisukeRUNGeneral3-alphaRUN 419
MUST2 3 alpha source at center
13h22 start
15h05 stop.
Attachment 1: visu_2018-07-16_14h58m37s.png
visu_2018-07-16_14h58m37s.png
Attachment 2: visu_2018-07-16_14h58m45s.png
visu_2018-07-16_14h58m45s.png
Attachment 3: visu_2018-07-16_14h58m55s.png
visu_2018-07-16_14h58m55s.png
Fixede738 Mon Jul 16 16:13:00 2018 daisukeRUNGeneral3-alphaRUN 420
MUST2 3 alpha shooting a bit left

15h10-16h08
Attachment 1: scaler_2018-07-16_16h10m10s.png
scaler_2018-07-16_16h10m10s.png
Attachment 2: visu_2018-07-16_16h09m59s.png
visu_2018-07-16_16h09m59s.png
Attachment 3: visu_2018-07-16_16h10m02s.png
visu_2018-07-16_16h10m02s.png
Attachment 4: visu_2018-07-16_16h10m05s.png
visu_2018-07-16_16h10m05s.png
Fixede738 Mon Jul 16 16:44:43 2018 daisukeRUNGeneral3-alphaRUN 422
MUST2 + 3 alpha shooting left
Attachment 1: visu_2018-07-16_16h32m59s.png
visu_2018-07-16_16h32m59s.png
Fixede738 Mon Jul 16 17:25:22 2018 daisukeRUNGeneral3-alphaRUN 422
MUST2 + 3 alpha shooting right.
Attachment 1: visu_2018-07-16_17h22m02s.png
visu_2018-07-16_17h22m02s.png
Attachment 2: visu_2018-07-16_17h05m26s.png
visu_2018-07-16_17h05m26s.png
Attachment 3: scaler_2018-07-16_17h22m04s.png
scaler_2018-07-16_17h22m04s.png
Fixede738 Mon Jul 16 18:46:34 2018 daisukeRUNGeneral3-alphaRUN 423
MUST2 + 3 alpha shooting center.
Attachment 1: scaler_2018-07-16_18h40m56s.png
scaler_2018-07-16_18h40m56s.png
Attachment 2: visu_2018-07-16_18h03m27s.png
visu_2018-07-16_18h03m27s.png
Attachment 3: visu_2018-07-16_18h39m46s.png
visu_2018-07-16_18h39m46s.png
Attachment 4: visu_2018-07-16_18h39m49s.png
visu_2018-07-16_18h39m49s.png
Fixede748 Tue Jul 4 05:01:21 2017 YorickRUNGeneralCD2Runs 248-250
These are long runs with CD2
MUST8 is in GMT 15.
Missing Times: T7 X and Y; T5 Y.
Beam is very stable at 2.8 micro.
Fixede744 Wed May 30 00:17:02 2018 Valérie, LouisRUNGeneralCH2Run #2114
RUN #2114 30 mai 2018 start @ 0h15; stop @ 2h58
BEAM STOP DUE to the shut down of the deviation element at the entrance of our D6 area.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Evening shift team: Louis Valérie (Online)

Beam intensity around 10**5 pps decreasing to 80-70k pps around 1h30 then coming again to 95k pps at 1h40
Between 2h48 and 2h50 beam was decresaing down to few 1000/s on CATS, due to some alarms on the beam line, slowly increasing again after 2h52.
cf current of T4 around 13-14 µA Strong increase around 13 µA (due to the stabilization of the beam rate at 10**5 pps !)

------------------------------------------------------------------------------------------------------------------------------------------
NB: The E_TOF plots for MM1 and MM3 seem to count less than the MM2 and MM4 plots, nearly factor 10 below for MM1, and factor 5 below for MM3.
But the raw spectra for StrXT of MM1 and MM3 have quite the same statistics (see integral values) maybe some software problems.
Check how the TOF parameter is done in the offline (from XT or YT +thresholds and pattern conditions).
The same behaviour was seen in the previous runs.
Attachment 1: Run2114_initScalers.png
Run2114_initScalers.png
Attachment 2: Run2114_MMimpactAT1h42.png
Run2114_MMimpactAT1h42.png
Attachment 3: Run2114_EXLCsIcorrelPPT_QTfag.png
Run2114_EXLCsIcorrelPPT_QTfag.png
Attachment 4: Run2114_TimingRefFAGppt.png
Run2114_TimingRefFAGppt.png
Attachment 5: Run2114_MMStrXT.png
Run2114_MMStrXT.png
Attachment 6: Run2114_MMStrYT.png
Run2114_MMStrYT.png
Attachment 7: Run2114_ETOFmm1toMM4.png
Run2114_ETOFmm1toMM4.png
Attachment 8: Run2114_scalersEndRun.png
Run2114_scalersEndRun.png
Fixede744 Wed May 30 01:15:58 2018 Valérie, LouisRUNGeneralCH2Run #2115
Since 2h58 : WAITING FOR THE BEAM TO START THE RUN

RUN #2115 30 mai 2018 start @ 03h20; stop @ 4h56
END OF THE RUN because there is an alarm related to a potential water leakage in the D3-D6 equipments. see next entry.
PCP will make a survey and enter to check the Qpole all off. We put the Wien filter off.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Night shift team: Louis, Valérie

Beam intensity recovered around 70k-90k pps at 3h37
Again down at 300 pps at 3h30 due to the loss of the "HyperPi" of the source (hummm we should ask experts about the meaning cf JCT)

cf current of T4 around 15 µA (at 3h15 without beam; same at 3h20 with beam), increasing during the run, 16 µA see Run2115_HVMust2At3h50.png

cf small rate at the beginning, cf Run2115_scalersInit.png
max around 91k pps at 3h27, cf Run2115_scalersAt3h27.png

------------------------------------------------------------------------------------------------------------------------------------------
Attachment 1: Run2115_scalersInit.png
Run2115_scalersInit.png
Attachment 2: Run2115_scalersAt3h27.png
Run2115_scalersAt3h27.png
Attachment 3: Run2115_HVMust2At3h50.png
Run2115_HVMust2At3h50.png
Attachment 4: Run2115_scalersEnd.png
Run2115_scalersEnd.png
Attachment 5: Run2115_MMimpact.png
Run2115_MMimpact.png
Attachment 6: Run2115TriggerU2M.png
Run2115TriggerU2M.png
Ongoinge744 Wed May 30 03:09:09 2018 Valérie, LouisRUNGeneralCH2BEAM LINE PROBLEMS, alarm "water leakage"
The beam was stopped at 4h56, due to the alarm of "water leakage" on equipments, indicated in the D6 area.
All QPole in D6 were automatically put to 0.
Wien filter and DAP were put OFF to stop the beam and enter in the D6 area.
Between 5h and 5h30 PCP investigated the problem along the D3 and D6 areas, to check the water leakage problem indicated by the control command messages.
Since the problem could not be solved directly on the command boxes in PCP, it was not possible to put again the values on the QPoles.
then the area astreinte, Sébastien Le Moal, was called at 5h40.
At 6h15, he investigated the problem and check the cables in the D6 area. He saw some water condensation around the cable surveyor of the equipment (located behind the cooling system of MUST2).


Night/morning shift team: Louis Valérie.

[NB: in order to let them end up their night quietly, we will call later on the LISE experts for the beam line checking once the Qpoles are ready to put ON again.]

The T4 was increasing, from 16µA at 5h, then around 17 µA at 5h40 (see snapshot HT_MUST2_Wed30May_At5h52.png) we decided to put it OFF to let it end the night quietly.


Attachment 1: HT_MUST2_Wed30May_At5h52.png
HT_MUST2_Wed30May_At5h52.png
Fixede744 Thu May 24 17:23:57 2018 Valérie for Calimero team: Valérian, LouisMUST2GeneralN/ACALIMERO Runs 453-457 OK
Calimero on ganp1074 in D6
Time Calibrator Range: 640 ns; Period 20 ns Amplitude of pulser (test generator) 9MeV
Run 453 Telescope T5 (MUVI2-slave) XT see plot
Run 454 Telescope T5 (MUVI2-slave) YT blocked at 6% -->

NB: stop calimero, stop run, stop geco, load das (to have good config for Mate), reload Geco
(usual steps: Restart Calimero programs, start Run control, start Calimero in geco)

Run 455 Telescope T5 (MUVI2-slave) YT ok

Then stop Run, exit from Geco, load DAS, change configuration for T1 to T4.
Change configuration of Port in RCC Narval. see plot

Run 456 Telescopes T1 to T4 (MUVI1-Master) XT ok see plot

Run 457 Telescopes T1 to T4 (MUVI1-Master) YT ok see plot
Attachment 1: PlotCalimrun453XT5thr1MeVtrue.png
PlotCalimrun453XT5thr1MeVtrue.png
Attachment 2: PlotCalimrun454XYT5thr1MeVtrue.png
PlotCalimrun454XYT5thr1MeVtrue.png
Attachment 3: PlotCalimrun455YT5thr1MeVtrue.png
PlotCalimrun455YT5thr1MeVtrue.png
Attachment 4: PlotCalimrun455YT5thr1MeVtrueOk.png
PlotCalimrun455YT5thr1MeVtrueOk.png
Attachment 5: ConfigCalimeroPortSlaveT5.png
ConfigCalimeroPortSlaveT5.png
Attachment 6: ConfigCalimeroPortMasterT1toT4muvi.png
ConfigCalimeroPortMasterT1toT4muvi.png
Attachment 7: ConfigGECOcalimT1thr1MeV.png
ConfigGECOcalimT1thr1MeV.png
Attachment 8: PlotCalimXT1to4Run456thr1MeV.png
PlotCalimXT1to4Run456thr1MeV.png
Attachment 9: PlotCalimXT1to4Run456thr1MeVcalim31%.png
PlotCalimXT1to4Run456thr1MeVcalim31%.png
Attachment 10: PlotCalimXT3Run456thr1MeVprojch9.png
PlotCalimXT3Run456thr1MeVprojch9.png
Attachment 11: PlotCalimXT1Run456thr1MeVprojch51.png
PlotCalimXT1Run456thr1MeVprojch51.png
Attachment 12: PlotCalimXT1toT4Run456thr1MeVall.png
PlotCalimXT1toT4Run456thr1MeVall.png
Attachment 13: PlotCalimYT1toT4Run457thr1MeVproj66.png
PlotCalimYT1toT4Run457thr1MeVproj66.png
Attachment 14: ConfigCalimYT1toT4Run457thr1MeV.png
ConfigCalimYT1toT4Run457thr1MeV.png
Attachment 15: PlotCalimYT2Run457thr1MeVproj83.png
PlotCalimYT2Run457thr1MeVproj83.png
Attachment 16: PlotCalimYT1toT4Run457thr1MeVall.png
PlotCalimYT1toT4Run457thr1MeVall.png
Fixede744 Thu May 24 17:18:58 2018 Valérie for Calimero team : Valérian, LouisMUST2GeneralN/ACALIMERO Tests Runs 451 to 452 (done in D6)
Test runs for telescopes T1 to t4
Nb: The applied threshold is now 1 MeV but it seems to be not the case when we look at the spectra.
Maybe a problem of the read configuration in GECO.

Run 451 XT Pulser amplitude 9 MeV
Run 452 YT
NB: good configuration files are given in the next entry

See Notes signed by Valérie, checked by the team !
Attachment 1: configCalimeroRun452YTthr1MeV.png
configCalimeroRun452YTthr1MeV.png
Attachment 2: PlotCalimrun452YTthr1MeVmaybe.png
PlotCalimrun452YTthr1MeVmaybe.png
Attachment 3: PlotCalimrun453YT5thr1MeVtrue.png
PlotCalimrun453YT5thr1MeVtrue.png
Fixede744 Thu May 24 12:01:54 2018 Valérie for Calimero team - Valérian, FairouzMUST2General Bug server Calimero Run #447-449
Calimero on ganp161
Telscopes T1 to T4 thresholds for T1 to T3 400 keV ; T4 : 1 MeV
ampli pulser 12 MeV
problem: stop calimero at 6%
Bad connection.
Attachment 1: VigruCalimerostartXT.png
VigruCalimerostartXT.png
Attachment 2: configCalimeroOnGeco.png
configCalimeroOnGeco.png
Attachment 3: GECOOnrunCalimeroConfig.png
GECOOnrunCalimeroConfig.png
Attachment 4: startcalimeroNarvalRCCstart.png
startcalimeroNarvalRCCstart.png
Attachment 5: startcalimeroWindowGECO.png
startcalimeroWindowGECO.png
Attachment 6: startcalimeroProgOnganp161.png
startcalimeroProgOnganp161.png
Attachment 7: startGecoREADHardware.png
startGecoREADHardware.png
Attachment 8: startGecoOnGanp161off.png
startGecoOnGanp161off.png
Attachment 9: startGecoOnGanp161ok.png
startGecoOnGanp161ok.png
Attachment 10: RuncontrolstopbeforeCalim.png
RuncontrolstopbeforeCalim.png
Attachment 11: startPAforGECOonGanp161.png
startPAforGECOonGanp161.png
Attachment 12: ConfigCalimeroMM2piedNosuppress.png
ConfigCalimeroMM2piedNosuppress.png
Fixede738 Mon Jul 9 18:03:48 2018 Valérie LouisRUNGeneralCryo-LH2RUN 312
Run 312

First RUN of 9C on filled LH2 target

start: 17h36 stop: 18h56
Beam: 9C
target: filled

Trigger: T1 to T8, CATS1%3*10⁴, CATS2%3*10⁴, PLASTIC%1*10⁴

I=1.4*10pps in CATS1
Purity = 5.1%


HV of DC wire has been changed from 500V to 530V
Plastic threshold has been changed from 180mV to 70mV

Target has been succefully filled
Attachment 1: scaler_2018-07-09_17h59m44s.png
scaler_2018-07-09_17h59m44s.png
Attachment 2: visu_2018-07-09_17h56m50s.png
visu_2018-07-09_17h56m50s.png
Attachment 3: visu_2018-07-09_17h57m49s.png
visu_2018-07-09_17h57m49s.png
Attachment 4: visu_2018-07-09_17h57m52s.png
visu_2018-07-09_17h57m52s.png
Attachment 5: visu_2018-07-09_17h57m55s.png
visu_2018-07-09_17h57m55s.png
Attachment 6: visu_2018-07-09_17h57m57s.png
visu_2018-07-09_17h57m57s.png
Attachment 7: visu_2018-07-09_17h57m59s.png
visu_2018-07-09_17h57m59s.png
Attachment 8: visu_2018-07-09_17h58m02s.png
visu_2018-07-09_17h58m02s.png
Attachment 9: visu_2018-07-09_17h58m05s.png
visu_2018-07-09_17h58m05s.png
Attachment 10: visu_2018-07-09_17h58m12s.png
visu_2018-07-09_17h58m12s.png
Attachment 11: visu_2018-07-09_17h58m15s.png
visu_2018-07-09_17h58m15s.png
Attachment 12: visu_2018-07-09_17h58m17s.png
visu_2018-07-09_17h58m17s.png
Attachment 13: visu_2018-07-09_17h58m19s.png
visu_2018-07-09_17h58m19s.png
Attachment 14: visu_2018-07-09_17h58m22s.png
visu_2018-07-09_17h58m22s.png
Attachment 15: visu_2018-07-09_17h58m24s.png
visu_2018-07-09_17h58m24s.png
Attachment 16: visu_2018-07-09_17h58m33s.png
visu_2018-07-09_17h58m33s.png
Attachment 17: visu_2018-07-09_17h58m37s.png
visu_2018-07-09_17h58m37s.png
Attachment 18: visu_2018-07-09_17h58m40s.png
visu_2018-07-09_17h58m40s.png
Attachment 19: visu_2018-07-09_17h58m57s.png
visu_2018-07-09_17h58m57s.png
Attachment 20: visu_2018-07-09_17h59m01s.png
visu_2018-07-09_17h59m01s.png
Attachment 21: visu_2018-07-09_17h59m05s.png
visu_2018-07-09_17h59m05s.png
Attachment 22: visu_2018-07-09_17h59m07s.png
visu_2018-07-09_17h59m07s.png
Attachment 23: visu_2018-07-09_17h59m34s.png
visu_2018-07-09_17h59m34s.png
Attachment 24: visu_2018-07-09_17h59m42s.png
visu_2018-07-09_17h59m42s.png
Attachment 25: scaler_STOP_2018-07-09_18h57m35s.png
scaler_STOP_2018-07-09_18h57m35s.png
Fixede748 Thu Jun 8 18:57:14 2017 Valérie LapouxMUST2Hardware Currents and Voltages on MUST2
Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature at -5°C.
Low voltages and HV ON
MUST2 "nominal" voltages and currents:
-----------------------------------------------------
DSSD T1 pcb5 80V ; ~1.7 µA | CsI 50V (~nA)
-----------------------------------------------------
DSSD T2 pcb9 80V ; ~1.4 µA | CsI 50V
-----------------------------------------------------
DSSD T3 pcb7 70V ; ~1. µA | CsI 50V
-----------------------------------------------------
DSSD T4 pcb11 80V ; ~1. µA | CsI 50V
--------------------------------------------------------------------
DSSD T5 pcb6 80V ; ~ 0.4 µA | SiLiT5-1 700V 10.72 µA ; SiLiT5-2 700V 2.16µA
--------------------------------------------------------------------
DSSD T6 pcb10 80V ; ~1.7 µA | CsI 50V
-----------------------------------------------------------
DSSD T7 pcb3 80V ; ~1.7 µA | CsI 50V
--------------------------------------------------------------------
DSSD T8 pcb2 60V ; ~1.7 µA | SiLiT8-1 700V 2.46 µA | SiLiT8-2 600V 3.4 µA
--------------------------------------------------------------------
Pinnede748 Fri Jun 9 15:49:46 2017 Valérie LapouxMUST2Hardware MUST2 configuration
The MUST2 configurations for telescopes in the chamber and low/High voltage Caen crate are given in the attached file.
Attachment 1: Confige748MUST2alimHVandLV.pdf
Confige748MUST2alimHVandLV.pdf Confige748MUST2alimHVandLV.pdf Confige748MUST2alimHVandLV.pdf Confige748MUST2alimHVandLV.pdf Confige748MUST2alimHVandLV.pdf
Attachment 2: préparationMUST2forE748.pdf
préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf préparationMUST2forE748.pdf
Pinnede748 Fri Jun 9 15:51:44 2017 Valérie LapouxMUST2Hardware General Trigger GMT for MUST2 electronics
The GMT configuration for the trigger inputs and the inputs from MUST2 electronics are given in the file.
Attachment 1: DaqElectronicsMUST2gmtforE748.pdf
DaqElectronicsMUST2gmtforE748.pdf DaqElectronicsMUST2gmtforE748.pdf
Fixede748 Mon Jun 12 22:48:45 2017 Valérie LapouxMUST2General Tests of the DAQ with the Alpha Source
12Th June. 3-peak Alpha source rotated towards the telescopes MM1 to MM4 (square wall of 4 telescopes).
MUVI configurations are fixed on the DAS. See pictures below. Thresholds : 402 keV.
We have DAS error messages for telescopes T2 and T7 with problems of data transmission, "I2C errors" = logic signals problems, maybe due to
bad cable connection inside the reaction chamber.
This problem should be fixed on 13th June looking at the cables in the chamber.

GMT trigger configuration: see picture, all telescopes T1 T3 T4 T5, T6 and T8.
T2 and T7 not included in the trigger inputs.
FAG window : 500 ns; Validation width 5.0 µs.

We can see the three peaks on the telescopes T1 T3 and T4 which are in the trigger (spectra taken during 30 minutes for checking).
T6 (in the trigger also) is placed at 90 deg and it can detect also some alphas.
Attachment 1: GMTconfig12juin.png
GMTconfig12juin.png
Attachment 2: GMTconfigSourceAlpha.png
GMTconfigSourceAlpha.png
Attachment 3: ConfigCAStel1Muvi1.png
ConfigCAStel1Muvi1.png
Attachment 4: DASmuvi1config.png
DASmuvi1config.png
Attachment 5: ConfigPhysMuvi1Cas1Thresh.png
ConfigPhysMuvi1Cas1Thresh.png
Attachment 6: MM1to4stripYsrcAlpha.png
MM1to4stripYsrcAlpha.png
Attachment 7: SpectresAlpha_12juin.png
SpectresAlpha_12juin.png
Attachment 8: SetUpMateGainShaper.png
SetUpMateGainShaper.png

ELOG Home Page