Fixed, e744, Thu May 10 15:06:44 2018, iulian & valerian, EXL-PPT, General, 60Co, Started run #211 & #212 #213 60Co source efficiency run 
|
[U][B]Run #211[/B][/U] BAD Run no BT
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @15h05 10/05
|
Fixed, e744, Thu May 10 14:38:41 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings
|
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
|
Pinned, e744, Fri May 11 14:00:48 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings
|
[quote="iulian"]Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
|
Fixed, e744, Sat May 12 08:54:42 2018, iulian, MUST2, General, 3-alpha, Run #114 T1-T5 trigger 3alpha source calib run 
|
[U][B]Run #214[/B][/U]
Trigger T1-T5 & gamma
3 alpha run
|
Ongoing, e744, Sat May 12 20:09:09 2018, iulian, MUST2, General, 3-alpha, Run #115 3 alfa run Calibration T1-T5 trigger   
|
[U][B]Run #215[/B][/U]
Trigger T1-T5
3 alpha run
|
Ongoing, e744, Sun May 13 12:09:55 2018, iulian, MUST2, General, 3-alpha, Run #116 3 alfa run Calibration T1-T5 trigger
|
[U][B]Run #115[/B][/U]
3 alfa run Calibration T1-T5 trigger
start 12h10
|
Pending, e744, Sun May 13 13:32:44 2018, iulian, ONLINE, Software, N/A, start_online ilegal instruction fault
|
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:
|
Ongoing, e744, Sun May 13 19:36:09 2018, Valérian + François, MUST2, General, 3-alpha, Run #116 #117 3 alpha run Calibration T1-T5 trigger 
|
[U][B]run #116[/B][/U]
start @12h07 13/05/18
stop @19h45 13/05/18
|
Fixed, e748, Mon May 14 10:49:47 2018, François, DAQ, Software, , TDC problem
|
Problem :
TDC labels are 0. After the compilation of action list the labels seem to appear (if I remember correctly), but after a save/reload of the config they
are gone, and in all cases no event coded (on the oscilloscope a validation point is visible, but do not know what this means in the case of a TDC – even |
Ongoing, e744, Mon May 14 12:57:44 2018, Francois, TARGET, General, , target preparation
|
Cibles Georges
|
Fixed, e744, Mon May 14 13:52:25 2018, François, BEAM, General, , Profileur
|
|
Ongoing, e744, Tue May 15 09:58:52 2018, Valérian, RUN, General, 3-alpha, run #118 3 alpha
|
[U][B]run #118[/B][/U]
Trigger T1 T2 T3 T4 & T5
EXL + BT not biased but still in trigger
|
Fixed, e744, Tue May 15 19:42:40 2018, Valérian, EXL-PPT, General, 60Co, Calibration of EXL from e748 data
|
The EXL calibration program is ready. Join is the result with previous data from e748. |
Ongoing, e744, Tue May 15 21:32:46 2018, Iulian Valerian, EXL-PPT, General, 60Co, run #300 60 Co source EXL & PPT trigger
|
[U][B]Run #300[/B][/U]
PPT EXL trigger 60Co
|
Ongoing, e744, Wed May 16 09:49:26 2018, Francois & Ruxandra & Armel, BEAM, Hardware, , E1D6 and E2D6 detectors
|
After struggling with the noise, we achieved ~ 50 keV resolution.
Source = 1 alpha peak 241Am E=5.485 MeV
|
Fixed, e744, Wed May 16 11:30:21 2018, iulian, EXL-PPT, General, 60Co, run 302 60Co source
|
[U][B]Run #302[/B][/U]
60 Co source PPT & EXL trigger
|
Fixed, e744, Wed May 16 16:27:29 2018, e744, lama, beyhan, OTHER, Hardware, , TACS from LISE to the exp DAQ
|
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)
TED4_HF (cable physically labeled 29 of the ADC)
|
Fixed, e744, Wed May 16 17:03:18 2018, Ruxandra, EXL-PPT, Software, , calibration
|
Calibration coefficients for the PPT detector using the 60Co and 40K lines: E=0.5514*ch - 83.322. Internal radioactivity at 1444 keV, not separated from
40K
Efficiency: During the run (21h46min40s) the number of gammas emitted from the 60Co source is 66796800; for the Co pics the integrals are: 2.71e05 for |
Fixed, e744, Wed May 16 17:14:20 2018, e744, lama, beyhan, OTHER, Hardware, , setting of signals from LISE to exp. DAQ
|
We put the following signals from LISE on DAQ :
(counting channels from 1)
|
Fixed, e744, Wed May 16 18:01:47 2018, Iulian Valerian, MUST2, Software, N/A, First successful Calimero run on T1 voie X run 316
|
First successful Calimero run on T1 voie X run 316 |
Fixed, e744, Wed May 16 19:06:39 2018, Iulian Valerian, MUST2, Software, N/A, run #318 Calimero T1-T4 strips X  
|
[U][B]Run #318[/B][/U]
Calimero T1-T4 X |
|