Fixed, e744, Thu May 10 15:06:44 2018, iulian & valerian, EXL-PPT, General, 60Co, Started run #211 & #212 #213 60Co source efficiency run PPT_spectra_run213.pngEXL_spectra_run213.png
[U][B]Run #211[/B][/U] BAD Run no BT
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @15h05 10/05
Fixed, e744, Thu May 10 14:38:41 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings 
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.  
 
    Pinned, e744, Fri May 11 14:00:48 2018, iulian, EXL-PPT, Hardware, N/A, Mesytech settings 20180511_132034_1526038557770.jpg
[quote="iulian"]Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.  
 
Fixed, e744, Sat May 12 08:54:42 2018, iulian, MUST2, General, 3-alpha, Run #114 T1-T5 trigger 3alpha source calib run  Must_spectra_start_run214.pngMust_spectra_stop_run214.png
[U][B]Run  #214[/B][/U]
Trigger T1-T5 & gamma 
3 alpha run 
Ongoing, e744, Sat May 12 20:09:09 2018, iulian, MUST2, General, 3-alpha, Run #115 3 alfa run Calibration T1-T5 trigger Must_spectra_start_run215.pngMust_spectra_stop_run215.pngerror_run215.pngerror_1minlater_run215.png
[U][B]Run #215[/B][/U]
Trigger T1-T5 
3 alpha run
Ongoing, e744, Sun May 13 12:09:55 2018, iulian, MUST2, General, 3-alpha, Run #116 3 alfa run Calibration T1-T5 trigger  Must_spectra_start_run216.png
[U][B]Run #115[/B][/U] 
3 alfa run Calibration T1-T5 trigger 
start 12h10
Pending, e744, Sun May 13 13:32:44 2018, iulian, ONLINE, Software, N/A, start_online ilegal instruction fault 
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:

Ongoing, e744, Sun May 13 19:36:09 2018, Valérian + François, MUST2, General, 3-alpha, Run #116 #117 3 alpha run Calibration T1-T5 trigger MUST2_HT_BT_13-05-2018.pngspectra_14-05-2018.png
[U][B]run #116[/B][/U]
start @12h07 13/05/18
stop  @19h45 13/05/18
Fixed, e748, Mon May 14 10:49:47 2018, François, DAQ, Software, , TDC problem 
Problem :
TDC labels are 0. After the compilation of action list the labels seem to appear (if I remember correctly), but after a save/reload of the config they
are gone, and in all cases no event coded (on the oscilloscope a validation point is visible, but do not know what this means in the case of a TDC – even
Ongoing, e744, Mon May 14 12:57:44 2018, Francois, TARGET, General, , target preparation 


Cibles Georges
Fixed, e744, Mon May 14 13:52:25 2018, François, BEAM, General, , Profileur Sans_titre.jpg


Ongoing, e744, Tue May 15 09:58:52 2018, Valérian, RUN, General, 3-alpha, run #118 3 alpha 
[U][B]run #118[/B][/U]
Trigger T1 T2 T3 T4 & T5 
EXL + BT not biased but still in trigger
Fixed, e744, Tue May 15 19:42:40 2018, Valérian, EXL-PPT, General, 60Co, Calibration of EXL from e748 data EXL_Sum_e748_Calib.png
The EXL calibration program is ready. Join is the result with previous data from e748.
Ongoing, e744, Tue May 15 21:32:46 2018, Iulian Valerian, EXL-PPT, General, 60Co, run #300 60 Co source EXL & PPT trigger 
[U][B]Run #300[/B][/U]
PPT EXL trigger 60Co
Ongoing, e744, Wed May 16 09:49:26 2018, Francois & Ruxandra & Armel, BEAM, Hardware, , E1D6 and E2D6 detectors essai.jpg
After struggling with the noise, we achieved ~  50 keV resolution.

Source = 1 alpha peak  241Am   E=5.485 MeV
Fixed, e744, Wed May 16 11:30:21 2018, iulian, EXL-PPT, General, 60Co, run 302 60Co source 
[U][B]Run #302[/B][/U]

60 Co source PPT & EXL trigger
Fixed, e744, Wed May 16 16:27:29 2018, e744, lama, beyhan, OTHER, Hardware, , TACS from LISE to the exp DAQ 
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)

TED4_HF  (cable physically labeled 29 of the ADC)
Fixed, e744, Wed May 16 17:03:18 2018, Ruxandra, EXL-PPT, Software, , calibration 
Calibration coefficients for the PPT detector using the 60Co and 40K lines: E=0.5514*ch - 83.322. Internal radioactivity at 1444 keV, not separated from
40K
Efficiency: During the run (21h46min40s) the number of gammas emitted from the 60Co source is 66796800; for the Co pics the integrals are: 2.71e05 for
Fixed, e744, Wed May 16 17:14:20 2018, e744, lama, beyhan, OTHER, Hardware, , setting of signals from LISE to exp. DAQ 
We put the following signals from LISE on DAQ :

(counting channels from 1)
Fixed, e744, Wed May 16 18:01:47 2018, Iulian Valerian, MUST2, Software, N/A, First successful Calimero run on T1 voie X run 316  Calimerro_run316.png
First successful Calimero run on T1 voie X run 316 
Fixed, e744, Wed May 16 19:06:39 2018, Iulian Valerian, MUST2, Software, N/A, run #318 Calimero T1-T4 strips X Calimerro_run318.pngCalimerro_T4_X_strip2_run319.pngCalimerro_T2_X_strip12_run319.png
[U][B]Run #318[/B][/U]

Calimero T1-T4 X