Fixede744 Sun May 6 17:52:21 2018 ValerianRUNGeneral3-alphaRun #205 T1 T2 T3 & T4
run #205
T1 T2 T3 & T4 T5 still in trigger but no HT/BT
start @15h43
stop @17h52
Ongoinge744 Sun May 6 17:55:05 2018 ValerianOTHERGeneral3-alphaUpdate on the cooling system problem
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.

After starting the HT, i started a new run :

run #206
start @18h02
stop @18h15

the spectrum seem OK.

In both cooling systems the levels are still good, did we refilled the 0 degree cooling system since the beginning?

The vacuum is @ 9.1e-6 in M2C and 2e-5 in 0 degree chamber.

I then left the cooling ON, but stopped both HT and BT on every telescopes.

I join with this entry screenshots of :

- T5 spectra
- BT&HT current before stopping
- DAS window for X&Y
Attachment 1: T5_vigru_after_cooling_issue.png
T5_vigru_after_cooling_issue.png
Attachment 2: BT_HT_part1.png
BT_HT_part1.png
Attachment 3: BT_HT_part2.png
BT_HT_part2.png
Attachment 4: BT_HT_part3.png
BT_HT_part3.png
Attachment 5: T5_das_after_cooling_issue_X.png
T5_das_after_cooling_issue_X.png
Attachment 6: T5_das_after_cooling_issue_Y.png
T5_das_after_cooling_issue_Y.png
Fixede744 Mon May 7 10:42:58 2018 ValerianOTHERGeneral60CoUpdate on the cooling system and run gamma (signal problem on PPT)
Today, both cooling system are working fine and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 in the 0 degree chamber.

I start a new gamma run :

run #207
trigger : EXL + PPT
start @10h44 07/05/18
stop @11h14 07/05/18
No signal on PPT. EXL OK.

I join to this entry a screenshot of EXL HT and EXL + PPT spectra

I start a new gamma run :

run #208
Bad run

run #209
trigger : EXL
start @11h21 07/05/18
stop @17h44 9/05/18
Attachment 1: HT_EXL.png
HT_EXL.png
Attachment 2: EXL_spectra_run207.png
EXL_spectra_run207.png
Attachment 3: PPT_spectra_run207.png
PPT_spectra_run207.png
Attachment 4: EXL_spectra_run209.png
EXL_spectra_run209.png
Fixede744 Thu May 10 14:38:41 2018 iulianEXL-PPTHardwareN/AMesytech settings
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
Looking into the manual find out how to change polarity of the signals. Did that and now the signals look normal with normal gain change after polarity change.
EXL polarity is negative so Mesytech modules have to be set to use negative input signals.

Fixede744 Thu May 10 15:06:44 2018 iulian & valerianEXL-PPTGeneral60CoStarted run #211 & #212 #213 60Co source efficiency run
Run #211 BAD Run no BT
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @15h05 10/05
stop @10h38 11/05

Run #212 BAD Run threshold changed
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @12h19 11/05
stop @13h14 11/05

Run #213
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @13h20 11/05
stop @8h20 12/05

QDCTDC_VOIE_0 -> PPT_E

This run used e744_12mai_founctione.das config (looks corrupted for must2 as no y energies)
Attachment 1: PPT_spectra_run213.png
PPT_spectra_run213.png
Attachment 2: EXL_spectra_run213.png
EXL_spectra_run213.png
Pinnede744 Fri May 11 14:00:48 2018 iulianEXL-PPTHardwareN/AMesytech settings

iulian wrote:
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
Looking into the manual find out how to change polarity of the signals. Did that and now the signals look normal with normal gain change after polarity change.
EXL polarity is negative so Mesytech modules have to be set to use negative input signals.


PPT HV = 650 V

This is happening when the pre-amplifiers for EXL are not alimented.. When they are alimented the EXL sigal polarity is positive.. The gains and thresholds for Mesytech modules are below
Attachment 1: 20180511_132034_1526038557770.jpg
20180511_132034_1526038557770.jpg
Fixede744 Sat May 12 08:54:42 2018 iulianMUST2General3-alphaRun #114 T1-T5 trigger 3alpha source calib run
Run #214
Trigger T1-T5 & gamma
3 alpha run
start @8h15m55s 12/05
stop @20h01 12/05

This run use new das config copied from e744_save04mai_fonctionne.das, updated and then re-saved to e744_save12mai_fonctionne.das
The previous config , saved now under the name e744_save12mai.das, gives no Y energies in the spectras and an error on Muvi2 (some register different)
Attachment 1: Must_spectra_start_run214.png
Must_spectra_start_run214.png
Attachment 2: Must_spectra_stop_run214.png
Must_spectra_stop_run214.png
Ongoinge744 Sat May 12 20:09:09 2018 iulianMUST2General3-alphaRun #115 3 alfa run Calibration T1-T5 trigger
Run #215
Trigger T1-T5
3 alpha run
start @20h09 12/05
stop 11h40 13/05

Run crashed during the night (looks line NARVAL)...
Needed to stop and start to be able to init VME slave.... VME master was ok
Attachment 1: Must_spectra_start_run215.png
Must_spectra_start_run215.png
Attachment 2: Must_spectra_stop_run215.png
Must_spectra_stop_run215.png
Attachment 3: error_run215.png
error_run215.png
Attachment 4: error_1minlater_run215.png
error_1minlater_run215.png
Ongoinge744 Sun May 13 12:09:55 2018 iulianMUST2General3-alphaRun #116 3 alfa run Calibration T1-T5 trigger
Run #115
3 alfa run Calibration T1-T5 trigger
start 12h10


start_online gives a ilegal instruction fault from time to time:
Attachment 1: Must_spectra_start_run216.png
Must_spectra_start_run216.png
Pendinge744 Sun May 13 13:32:44 2018 iulianONLINESoftwareN/Astart_online ilegal instruction fault
From time to time the start_online code gives an ilegal instruction error and crash... Once the ctrl-c pressed it shows:


"Error in <TFile::cd>: No such file /home/e748/analysis/nptool/Outputs/Simulation.root:/"
Ongoinge744 Sun May 13 19:36:09 2018 Valérian + FrançoisMUST2General3-alphaRun #116 #117 3 alpha run Calibration T1-T5 trigger
run #116
start @12h07 13/05/18
stop @19h45 13/05/18

I refilled the 0 degree cooler.

run #117
start @19h47 13/05/18
stop @ 9H04 14/05/18

Joined is a screenshot of the HT of MUST2

Vacuum in M2C is 5.7e-6 mbar and ~4e-5 in the 0 degree chamber which is higher than before.

Joined spectra.
Attachment 1: MUST2_HT_BT_13-05-2018.png
MUST2_HT_BT_13-05-2018.png
Attachment 2: spectra_14-05-2018.png
spectra_14-05-2018.png
Fixede748 Mon May 14 10:49:47 2018 FrançoisDAQSoftware TDC problem
Problem :
TDC labels are 0. After the compilation of action list the labels seem to appear (if I remember correctly), but after a save/reload of the config they are gone, and in all cases no event coded (on the oscilloscope a validation point is visible, but do not know what this means in the case of a TDC – even after looking in GANIL wiki related doc).


Solution :
Solved by Fred. He made "init" at the VME MUST2MASTER in the RCC.
Ongoinge744 Mon May 14 12:57:44 2018 FrancoisTARGETGeneral target preparation


Cibles Georges

1) Plastique 63 µm

2) 104 µm

3) 200 µm



Cibles GoodFellow

4) Carbone 0.075 mm (je calcule épaisseur de 8,9 mg/cm2)

5) Polyéthylène 63 µm

6) Polyéthylène 0,1 mm = 100 µm

7) 2 cibles de 100 µm en sandwich = 200 µm


Fixede744 Mon May 14 13:52:25 2018 FrançoisBEAMGeneral Profileur



Normalement, les profileurs devraient voir le faisceau.
En général, la fenêtre d’entrée est de 12µm de titane et il y a une plaque d’alu de 3mm en sortie.
Donc il y a une plaque d’arrêt sur le dernier profileur.
Mais même si c’est une feuille d’inox en sortie, le faisceau ne devrait pas sortir.
(Antony Dubois)
Attachment 1: Sans_titre.jpg
Sans_titre.jpg
Ongoinge744 Tue May 15 09:58:52 2018 ValérianRUNGeneral3-alpharun #118 3 alpha
run #118
Trigger T1 T2 T3 T4 & T5
EXL + BT not biased but still in trigger
3 alpha
start @18h04 14/05/18
stop @10h00 15/05/18
Fixede744 Tue May 15 19:42:40 2018 ValérianEXL-PPTGeneral60CoCalibration of EXL from e748 data
The EXL calibration program is ready. Join is the result with previous data from e748.
Attachment 1: EXL_Sum_e748_Calib.png
EXL_Sum_e748_Calib.png
Ongoinge744 Tue May 15 21:32:46 2018 Iulian ValerianEXL-PPTGeneral60Corun #300 60 Co source EXL & PPT trigger
Run #300
PPT EXL trigger 60Co

start 21:32:06 15/05/2018
Ongoinge744 Wed May 16 09:49:26 2018 Francois & Ruxandra & ArmelBEAMHardware E1D6 and E2D6 detectors
After struggling with the noise, we achieved ~ 50 keV resolution.

Source = 1 alpha peak 241Am E=5.485 MeV

Detector E1D6 50 µm 25 V in principle, but set to 100 V
Detector E2D6 300 µm 70 V in principle, but set to 100 V

PA gain = 20 mV/MeV

Maximum output signal of the new PA (differential) = 8 V.
Attachment 1: essai.jpg
essai.jpg
Fixede744 Wed May 16 11:30:21 2018 iulianEXL-PPTGeneral60Corun 302 60Co source
Run #302

60 Co source PPT & EXL trigger

1start 21h46m40s 15/05
stop 10h 16/05
Fixede744 Wed May 16 16:27:29 2018 e744, lama, beyhanOTHERHardware TACS from LISE to the exp DAQ
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)

TED4_HF (cable physically labeled 29 of the ADC)
TE2D6_HF (cable physically labeled 30 of the ADC)

--> They should be added to the DAS when possible

NOTE that TE1D6_HF (cable physically labeled 31 of the ADC) was already cabled