Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e748 |
Thu Jul 6 07:23:22 2017 |
e748 | MUST2 | Software | CD2 | MUST2 : VMECOM : TCP error - TCP/IP : time-out | "MUST2 : VMECOM : TCP error - TCP/IP : time-out"
at 7:19.
RRC shows MUST2 "OFFLINE"
|
|
Fixed | e748 |
Thu Jul 6 07:58:09 2017 |
e748 | MUST2 | General | CD2 | SiLi 1/T5 triped | SiLi 1/T5 triped at 7:30. We leave it off
while trying to restart the run control.
We turn it on again at 8:03. |
|
Fixed | e748 |
Thu Jul 6 08:22:08 2017 |
Valérie L | RUN | General | CD2 | Problem of DAQ and networks problems | After the problem on Run control and the offline
of MUST2, the DAQ on numexo could not be
started again.
|
   |
Fixed | e748 |
Thu Jul 6 09:54:53 2017 |
Valérie L | RUN | General | CD2 | Run control OK -Runs 339 and 340 | After the reboot soft of the AGAVA NUMEXO
and realignment of the TGS (time stamp Agava)
the situation is stabilized.
|
  |
Fixed | e748 |
Thu Jul 6 10:35:50 2017 |
Valérie L | MUST2 | General | CD2 | Sili-1/T5 trip | The Sili1 of T5 has tripped (again) at 10h30.
On again. 400V; I ~ 20µA at 10h40, still
increasing 25.6µA at 11h30.(The limit Io |
|
Fixed | e748 |
Thu Jul 6 10:39:09 2017 |
BéaF & ValérieL - shift U | OFFLINE | General | | Test of merge on Run 339 | spectra of the merge checked by Béa.
The merge is correct on the correlations
cf plots below.
|
 |
Fixed | e748 |
Thu Jul 6 11:41:20 2017 |
Valérie L | DAQ | General | N/A | MEMO START/STOP + AGAVA configuration in DAS | START/STOP of the DAQ
---------------------------------------------------------------------
START acquisition e748chio (DAQ Numexo; |
    |
Fixed | e748 |
Thu Jul 6 13:21:49 2017 |
Daisuke | RUN | Hardware | CD2 | RUN340 | During RUN340
13h10 The beam intensity dropped from 35 |
|
Fixed | e748 |
Thu Jul 6 13:33:23 2017 |
e748 | RUN | General | CD2 | Stop of Run 340 due to beam problems | The run 340 was stopped at 13h32. Before the
stop fo the run the beam was unstable and
stopped by machine team.
|
|
Fixed | e748 |
Thu Jul 6 13:37:22 2017 |
Valérie L | RUN | General | CD2 | Run 341 | Run 341 START AT 13h37 STOP AT 15h21 (beam
stop see the ELOG entry Id=239)
At the beginning (cf scalers below) the beam |
 |
Fixed | e748 |
Thu Jul 6 13:37:37 2017 |
Adrien Matta | OFFLINE | General | N/A | Energy loss table for d, 3He and 3H | Here it is! |
20x |
Fixed | e748 |
Thu Jul 6 14:07:20 2017 |
Bea | OFFLINE | General | CD2 | Convert & Merge Numexo Runs in ganp166 | To Convert run DAQ_general
offline
|
|
Fixed | e748 |
Thu Jul 6 15:24:25 2017 |
e748-shift U | BEAM | General | CD2 | Beam stop, end of run 341 | The beam was stopped due to vacuum problem
at CSS2.
End of run 341 at 15h21. |
|
Fixed | e748 |
Thu Jul 6 17:05:51 2017 |
Valérie L | RUN | General | CD2 | run 342 +overview of TAC | Beam recovered after shut down due to the
vacuum problem (power supply on the vacuum
system was off). Beam was off during 1h30.
|
    |
Fixed | e748 |
Thu Jul 6 19:17:12 2017 |
e748 MA | RUN | General | CD2 | RUN 343 | Run 343
same conditions as run 342
beam=7uA
|
|
Fixed | e748 |
Thu Jul 6 20:07:46 2017 |
Daisuke + Thomas R+ Valérie L | CHIO | General | CD2 | Problem of counting on Chio | It seems that the ChIo is counting at a very
low rate, around 100/s instead of 5000/s
in previous runs.
|
|
Fixed | e748 |
Thu Jul 6 20:46:15 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 345 DAQ+344 chio after chio problem | The HV on cathode is now set again at 2900V.
At 20h50 we get back the beam for the run.
(Grid still ok at 920V)
|
|
Fixed | e748 |
Thu Jul 6 21:27:52 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 345 beam intensity loss | The beam rate was low after intervention with
the CHIO HV.
|
|
Fixed | e748 |
Thu Jul 6 21:35:29 2017 |
Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) | RUN | General | CD2 | Run 346 e748+e748chio |
Run 346 started at 21h37
Beam around 7µA CATS 2 46k
|
6x |
Fixed | e748 |
Fri Jul 7 00:25:16 2017 |
e748 | MUST2 | Software | CD2 | Calibration for CsI | Rough energy calibration for CsI was performed
(only for MM1 and MM4).
|
|